Laserfiche WebLink
2. The tower lights and painting shall conform to all lighting and painting standards required by the <br />Federal Aviation Administration. <br />g. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br />associated with wireless telecommunication shall be removed by the provider of such facilities and the <br />site restored to its pre -construction state if said facilities have not been operational or used for a period <br />of 6 consecutive months. Removal and site restoration shall be completed within 90 days of the end <br />of said 6 month period. (Development Title Section 9-1065.8) <br />h. BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br />Joaquin County Ordinance requirements will be applicable to the proposed project. The following <br />conditions shall be addressed prior to submittal of a building permit application to the Building <br />Inspection Division: <br />1. A building permit for each separate strucfiure or building is required. Submit plans, <br />Specifications and supporting calculations, prepared by a Registered Design Professional <br />(architect or engineer) for each structure or building, showing compliance with the 2019 <br />California Building, Existing Building, Mechanical, Plumbing, Electrical, Energy and Fire Codes <br />as may be applicable. Plans for the different buildings or structures may be combined into a <br />single set of construction documents. <br />2. A grading permit will be required for this project. Submit plans and grading calculations, <br />including a statement of the estimated quantities of excavation and fill, prepared by a <br />Registered Design Professional. The grading plan shall show the existing grade and finished <br />grade in contour intervals of sufficient clarity to indicate the nature and extent of the work and <br />show in detail that it complies with the requirements of the code. The plans shall show the <br />existing grade on adjoining properties in sufficient detail to identify how grade changes will <br />conform to the requirements of the code. <br />3. The required plans must be complete at the time of submittal for a building permit. Plans must <br />address building design and construction fire and life safety requirements accessibility and <br />show compliance with the current California codes and San Joaquin County ordinances. A <br />complete set of plans must include fire sprinkler plans, truss design submittals, metal building <br />shop drawings, structural plans and calculations, plumbing, electrical and mechanical drawings <br />and energy report. <br />4. A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix § J104 <br />for grading. All recommendations ofthe Soils Report shall be incorporated into the construction <br />drawings. <br />2. DEPARTMENT OF PUBLIC WORKS (Contact: [2091468-3000, <br />see memo dated December 9, 2021) <br />3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209] 468-3420, see memo dated October 20, <br />2021) <br />FOR NOTES AND INFORMATION ONLY: <br />See San Joaquin County Council of Governments letter dated October 4, 2021. <br />See Pacific Gas and Electric letter dated November 3, 2021 and October 5, 2021. <br />PA -2100193 —Conditions of Approval 2 <br />