Laserfiche WebLink
GENERAL NOTES <br /> 0 <br /> Lo <br /> 0 <br /> 1. PRIOR TO STARTING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE TO MAKELi <br /> SURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONST- o <br /> RUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND <br /> SD - o <br /> - - - - - THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS APPROVED BY ALL OF THE <br /> - - - - - - - - - - - - - - - - - <br /> - - - - - - - - - - - - - - _ -- -- PERMITTING AUTHORITIES. w <br /> -- <br /> z <br /> 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND z o <br /> THE REQUIREMENTS AND STANDARDS OF THE LOCAL GOVERNING > <br /> AUTHORITY. THE SOILS REPORT AND RECOMMENDATIONS SET FORTH THEREIN ARE A Of <br /> EIGHT MILE ROAD PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT SHALL <br /> TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. m <br /> 0 <br /> w <br /> 3. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS <br /> — — — — — — — — — — — AND THE RECOMMENDATIONS SET FORTH IN THE SOILS REPORT REFERENCED IN <br /> -- -- <br /> ----------- -- -- -- _ _ _ _ THIS PLAN SET <br /> — — — — - - - - - - - - - - - - - - - - _ <br /> _ QF-_---_—__ <br />