Laserfiche WebLink
1FUEL GC TO WORK WITH STORE GC ONSCHEDULING. ANY CONFLICTS SHALL BEBROUGHT TO THE ATTENTION OF THE SEIPROJECT MANAGER.2 FUEL GC RESPONSIBLE FOR ALL CONCRETE OVER TANKS AND PRODUCT PIPING (I.E. TANK SLAB AND DRIVE MATS). CONCRETE CHAIRS ARE BY SEI.3 FUEL GC RESPONSIBLE FOR CANOPY FOOTINGS.4 FUEL GC TO INSTALL CANOPY DRAINS (WHEREAPPLICABLE) TO POINT OF CONNECTION WITHIN(10) FT OF DRIVE MATS.5 FUEL EC TO INSTALL ALL FUEL RELATEDELECTRONICS (I.E. DATA BOXES, EDH UNIT,TURBINE RELAYS, ISOLATION RELAYS, ETC).6 FUEL GC RESPONSIBLE FOR ALL ELECTRICALCONDUITS, SEAL-OFFS, ELECTRICAL J-BOXES PERSTATE, LOCAL, MANUFACTURERS AND SEI CODESAND SPECIFICATIONS.7 FUEL EC TO PULL WIRE FOR CANOPY LIGHTING,INTERCOM, DISPENSERS, TURBINES ANDMONITORING SYSTEM DEVICES.8 FUEL EC TO MAKE ALL FINAL CONNECTIONS TOFUELING EQUIPMENT AND ELECTRONICS.9 FUEL GC TO PULL TRADE PERMITS FOR FUELINGWORK (AS REQUIRED).10 FUEL GC TO "CALL FOR" AND "BE PRESENT FOR"ALL LOCAL REGULATOR INSPECTIONS ANDRESPONSIBLE FOR SCHEDULING ON-SITEINSPECTIONS WITH APPROPRIATE SEIREPRESENTATIVE RELATED TO FUELING.11 FUEL GC TO COORDINATE WITH TANKNOLOGYAND THE SEI CONSTRUCTION MANAGER FORTESTING OF FUELING SYSTEM.12 FUEL GC TO HAVE PERSONNEL ON SITE FORTESTING.13 FUEL GC RESPONSIBLE FOR CLOSE OUT PACKAGEPER 7-11 MATRIX.1 STORE GC TO WORK WITH FUEL GC ONSCHEDULING. ANY CONFLICTS SHALL BEBROUGHT TO THE ATTENTION OF THE SEIPROJECT MANAGER.2 STORE ELECTRICAL CONTRACTOR TO RUNUNDERGROUND ELECTRICAL CONDUITS TO (10) FTOUTSIDE OF BUILDING SLAB (COORDINATELOCATION, QUANTITY, SIZE AND TYPE OF CONDUITWITH FUEL CONTRACTOR).3 STORE ELECTRICAL CONTRACTOR TO INSTALLSEAL-OFFS (AS REQUIRED), ELECTRICALRACEWAYS, GUTTER BOXES, FUEL ELECTRICALPANELS, CIRCUIT BREAKERS AND FEEDERS.4 STORE ELECTRICAL CONTRACTOR TO INSTALLOVERHEAD CONDUIT FOR VEEDER ROOT FROMELECTRICAL ROOM TO LOCATION OF V/R ONPLANS.5 STORE GC RESPONSIBLE FOR ALL EXTERIORAREA LIGHTING, IRRIGATION AND AIR/VACUUMUNIT SLAB AND POWER.6 MONUMENT POLE SIGN TO BE PROVIDED ANDINSTALLED BY SIGNAGE CONTRACTOR. THE SIGNIS TO BE FUTURE MEDIA ELECTRONIC PRICE SIGN.STORE GENERAL CONTRACTORFUEL CONTRACTOR1 7-ELEVEN CONVENIENCE STORE2 FUELING CANOPY AND DISPENSERS3 UNDERGROUND FUEL STORAGE TANKS AND SLAB4 FUEL STORAGE TANK VENTS5 AIR-VAC MACHINE6 (2) EMERGENCY SHUT OFF SWITCHES,REF 2-G10.07 VAPOR POLISHER8 VEEDER ROOT SITE MONITOR CONSOLE (FIELD VERIFY)9 OVERFILL ALARM. REF 4-G6.010 MONUMENT SIGN11 PYLON SIGNLONGEST PIPING RUN - STORE (41216)DISPENSER 1PRODUCTLENGTHPREMIUMDIESEL155'164'108'108'60'71'DISPENSER 2DISPENSER 3DISPENSER 4DISPENSER 5DISPENSER 6PREMIUMPREMIUMPREMIUMDIESELTOTAL PIPING LENGTH - STORE (41216)REGULARPRODUCTPREMIUMDIESELLENGTH242'252'172'A.B.C.D.E.F.G.H.I.J.K.L.M.N.TANK BURIAL CHART - STORE (41216)COMPONENTFINISH GRADE ELEV. AT BEGINNING OF RUN (FT):PIPE BURY (FT):ELEVATION OF PIPE AT BEGINNING OF RUN (A-B)PIPE LENGTH (LONGEST RUN) (FT):PIPING RUN FALL (FT) (D*1/8" PER FT):TOTAL CROSSOVERS/SWING JOINTS:CROSSOVER/SWING JOINT DEPTH (FT):ELEVATION AT END OF PIPE (FT) (C-E-G):ADD FOR EXTRACTOR TEE AT SUMP:TOP TANK ELEVATION (FT) (H-I):HIGHEST FINISH GRADE ELEVATION AT TANK SLAB (FT):MAX BURY DEPTH (K-J) (FT): MAX = 5.67'LOWEST FINISH GRADE ELEVATION AT TANKS (FT):MIN BURY DEPTH (M-J) (FT): MIN = 4.17'TANK BURIAL DEPTH IS GOVERNED BY THE DIESEL PRODUCT PIPING AT DISPENSER 2. THE TOP OF TANKS SHALL BE SET AT - 4.76'. DIESELVAPOR9.971.508.471641.7111.005.761.004.7610.375.6110.035.27VENT9.802.007.80530.5500.007.251.505.7510.374.6210.034.289.971.508.471571.6411.005.831.004.8310.375.5410.035.20CLEAN AIR/VANPOOL/EVX X X X X X X X X X X X X X X XCLEAN AIR/VANPOOL/EVEVCS <br />CLEAN AIR/ <br />VANPOOL/EVXXXXXXXXX <br />XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXW. CHARTER WAY <br />1FFFF10.09UNDERGROUND TRENCHING10'-0"UNDERGROUND TRENCHING235100'-0"6100'-0"610989.80475'-0"19'-2"44'-1"19'-4"10.2510.2010.0910.029.9710.1110.2410.3710.0310.0610.1210.2210.23G0.1FUELING ARCHITECTURAL SITE PLAN <br />NDG <br />TLH <br />Job#:A9-207 <br />Scale: <br />Date: <br />Drawn By: <br />Checked By: <br />Rev. #Date Description <br />03/16/20 <br />AS NOTEDSHEET:RText (RText)RText (RText) <br />7-ELEVEN #41216 <br />770 W CHARTER WAY <br />STOCKTON, CA 95206 <br />7-ELEVEN, INC. <br />3200 HACKBERRY ROAD, IRVING TEXAS 75063 <br />ARCHITECTURE CIVIL ENGINEERING MEP ENGINEERING <br />10755 SANDHILL ROAD, DALLAS, TEXAS 75238 <br />TEL: 214-343-9400 www.dimensiongrp.com <br />Documents prepared by The <br />Dimension Group are to be used <br />only for the specific project and <br />specific use for which they are <br />intended. Any extension of use to <br />other projects, by owner or any <br />other party, without the expressed, <br />written consent of The Dimension <br />Group is done at the user's own <br />risk. If used in a way other than <br />that specifically intended, user will <br />hold The Dimension Group <br />harmless from all claims and losses.Proto 11-05-1809/24/21PEER REVIEW COMMENTS04/17/20 <br />CITY COMMENTS07/06/20 <br />AS-BUILTDRAWINGCAFUELING - USAN3STORE CONTRACTOR RESPONSIBLE FOR ROUTING (29)3/4" AND (3) 1" ROBROY PVC COATED GALVANIZED STEELCONDUITS (WITH PULL STRING) FROM ELECTRICAL ROOMTO (10') PAST BUILDING SLAB. FUELING CONTRACTOR TOPICK UP CONDUITS AT THIS LOCATION AND ROUTE TOFINAL TERMINATION. FUELING CONTRACTORRESPONSIBLE FOR PULLING WIRE AND MAKING FINALTERMINATIONS. REF G16.0 FOR SPECIFICATIONS.44CITY COMMENTS09/02/20 <br />CITY COMMENTS11/11/20 <br />CITY COMMENTS12/15/20 <br />FIELD CHANGES01/05/21 6666FIELD CHANGES08/24/21 77778All underground instaled as per plans. 10/6/21