My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL INSULATION <br />Section 15250 <br />15-1207 <br />3.04 INSTALLATION OF EQUIPMENT INSULATION: <br />A. Clean and dry all surfaces prior to insulating. <br />B. Install insulation materials with smooth and even surfaces. Do not use mastic or joint sealer <br />as filler for gapping joints and excessive voids resulting in poor workmanship. <br />C. Do not apply insulation to equipment breechings or stacks while hot. <br />D. Do not insulate manholes, handholds, cleanouts, nameplate, ASME stamp. Provide <br />beveled edge at interruptions of insulation. <br />3.05 INSULATION REPAIR: <br />A. Repair damaged sections of existing and/or new mechanical insulation where damaged <br />occurred during this construction period. Use insulation of same thickness as existing <br />insulation. Install new jacket lapping and seal over existing. <br />3.06 CARE AND CLEANING: <br />A. Repair and/or replace broken, damaged and or other wise defective insulation. Work to be <br />completed to the satisfaction of the Architect. At completion of work, clean materials <br />installed as part of this work and leave systems and equipment in satisfactory operating <br />condition. <br />B. Upon completion of work remove materials, equipment, tools from premises. Leave project <br />area neat, clean and orderly. <br />END OF SECTION <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.