PLUMBING PIPING SYSTEMS <br />Section 15400 <br />15-1207 <br />B. Water lines shall not be installed in the same trench with non- metallic sewer lines <br />unless the bottom of the water pipe at all points is at least 12 inches above the top of the <br />sewer line and the water line is placed on a solid shelf excavated at one side of the <br />common trench. <br />C. Where water and waste piping cross, the pipes shall have no fittings within 10 feet of the <br />crossing, and the water line shall be run above the waste line. Comply with any local <br />codes or requirements. <br />D. Close open ends of water piping each day to prevent contamination or foreign matter <br />entering pipe during construction. Thoroughly flush out piping to remove any dirt or <br />foreign matter. Remove and clean all aerators at end of project and prior to sterilization. <br />3.03 INSTALLATION OF SANITARY DRAINAGE (SEWER AND STORM DRAIN) SYSTEMS: <br />A. Make joints between PVC pipe and cast iron pipe or fittings using cast iron adapter <br />fittings, installed as recommended by the manufacturer. <br />B. Sewer Piping: Run all horizontal sanitary drain piping inside of building on a uniform <br />grade of not less than 1/4 -inch per foot, unless otherwise noted on the plans. Piping <br />shall have invert elevations as shown and slope uniformly between given elevations. <br />C. Storm Drain Piping: Run all horizontal storm drain piping inside of building on a uniform <br />grade of not less than 1/4 -inch per foot, unless otherwise noted on the plans. Piping hall <br />have invert elevations as shown and slope uniformly between given elevations. <br />D. Run all drainage piping as straight as possible and provide easy bends with long turns; <br />make all offsets at an angle of 45 degrees or less. <br />E. Grade all vent piping so as to free itself quickly of any water condensation. <br />F. Install drip pan under storm drain piping, sanitary drain piping, and vent piping that must <br />be run over kitchen areas. <br />G. Hubless Cast -Iron Joints: Comply with coupling manufacturer's installation instructions <br />and in accordance with CISPI Pamphlet No. 310, latest edition. <br />H. Cleanouts: Install in piping as indicated, as required by California Plumbing Code, at <br />each change in direction of piping greater than 45 degrees, at minimum intervals of 50 <br />feet for piping 4 inches and smaller and 100 feet for larger piping, and at base of each <br />conductor. <br />Flashing Flanges: Install flashing flange and clamping device with each cleanout <br />passing through waterproof membrane. <br />Install drains in accordance with manufacturer's written instructions and in locations <br />indicated. Unless detailed otherwise, install floor drains and floor sinks with lip of drain <br />slightly below finished floor to ensure drainage. Coordinate with other Contractors to <br />ensure that floor slopes to drain. <br />ES' <br />