My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLUMBING PIPING SYSTEMS <br />Section 15400 <br />15-1207 <br />Building and Health department codes. This procedure shall be performed by a <br />Licensed Contractor trained in the disinfection of water systems or by a state <br />certified Water Operator with a minimum of a D-1 license. <br />2. Preliminary Preparation: <br />a. Locate the injection point. Install an injection hose bib to the system at a <br />point within 10'-0" of its junction with the water supply line. When project is <br />complete, with all fixtures connected and operable and ready for use and <br />when, by test, the system is proved to be free from leaks, it shall be <br />thoroughly flushed by fully opening every outlet and operating every fixture <br />until clear water flows from all of them. Take a Sample, test for Free <br />chlorine content and record it on the work sheet. <br />(1) Use a UR (low range) Disinfection test strip or a chlorine meter. A <br />Normally reading will be 2mg/L or less. This is the "Bench Mark" <br />reading. <br />3. Disinfecting Agent: <br />a. The chlorine shall be a registered product with Cal -EPA for use in <br />California in potable water lines, such as Bacticide, Cal -EPA Registration <br />No. 37982-20001. Use liquid Sodium Hypochlorite conforming to <br />ANSI/AWWA B300. <br />4. Disinfecting Procedure (Chemical Pump Method): <br />a. Connect the chemical pump to the injection hose bib. If existing pressure <br />exceeds 50psi use a DP Disinfection Backflow / Regulator Injection <br />Assembly. <br />b. With system completely full of water and supply valve open, adjust every <br />faucet of system so that a trickle of water flows from each.. Find the <br />furthest fixture and trickle at a higher rate of speed until you obtain your <br />first reading. Then work backwards. <br />C. Inject disinfectant until a test at each branch outlet shows a chlorine <br />residual concentration of 50 parts per million (ppm). <br />d. Close all outlets and valves. Close Fresh water hose bib. Shut off pump. <br />Close injection hose bib. Maintain condition for 24 hours and chlorine <br />residual of at least 25 ppm must be retained in system for this 24 hour <br />period. If, after 24 hours, tests indicate that chlorine residual concentration <br />has decreased below 25ppm. The disinfection procedure must be repeated <br />until an approved result is obtained. <br />e. When the above procedure has been completed, flush out entire system <br />with fresh water until a test at any outlet shows a residual of not more than <br />the original "Bench Mark" readings taken in the preliminary preparation. <br />(1) When flushing, pay attention to any special requirements. Don't flush <br />highly chlorinated water into storm drains, creeks, rivers or septic <br />tanks. De -chlorinate the discharge water with Ascorbic Acid, <br />F. Chemical and bacteriological tests shall be conducted by a state -certified laboratory and <br />approved by the local authorities having jurisdiction. <br />G. Submit written report to Health Department as required by State Regulations. Provide a <br />copy of report to Architect prior to completion of project. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.