Laserfiche WebLink
INSULATED CONDUCTORS <br />Section 16070 <br />15-1207 <br />C. If any failure is detected, locate failure, determine cause and, as directed by Architect, replace <br />or repair cable or conductor to satisfaction of Architect at no increase in Contract Sum. <br />D. Subject feeder cables rated 600 volts AC to one (1) minute withstand test, or until stable <br />reading is obtained with 1000 -volt megger. Provide written report of megger test results. Test <br />report to include all test conditions. <br />E. Do not megger any cables after connecting to any equipment, unless specifically directed to do <br />so by Architect. <br />END OF SECTION <br />6 <br />