Laserfiche WebLink
LOW VOLTAGE SWITCHBOARD <br />Section 16415 <br />15-1207 <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Verify surface is suitable for switchboard installation. <br />3.2 INSTALLATION <br />A. install in accordance with NEMA PB 2.1. <br />B. Tighten accessible bus connections and mechanical fasteners after placing switchboard. <br />C. Install engraved plastic nameplates. <br />D. Install breaker circuit directory. <br />E. Ground and bond switchboards. <br />3.3 FIELD QUALITY CONTROL <br />A. Inspect and test in accordance with NETA ATS, except Section 4. <br />B. Perform inspections and tests listed in NETA ATS, Section 7.1. <br />3.4 ADJUSTING <br />A. Adjust operating mechanisms for free mechanical movement. <br />B. Tighten bolted bus connections. <br />3.5 CLEANING <br />A. Touch up scratched or marred surfaces to match original finish. <br />END OF SECTION <br />A <br />It <br />