My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MULTI-PURPOSE SOUND SYSTEM <br />Section 16780 <br />15-1207 <br />2.10 ALS System <br />1 <br />LT 800' <br />Listen Technologies <br />0`k. <br />ALS Transmitter <br />1 <br />LA 326 <br />Listen Technologies <br />Rack Mount Kit <br />16 <br />LR 300-072 <br />Listen Technologies <br />Receiver <br />16 <br />LA 361 <br />Listen Technologies <br />Alkaline Batteries <br />16 <br />LA 164 <br />Listen Technologies <br />Ear Speaker <br />9 <br />LA 166 <br />Listen Technologies <br />Neck Loop <br />2 <br />LA 304 <br />Listen Technologies <br />Signage <br />1 <br />WP 1019 <br />Pro -Co Sound <br />Wall Plate (BNC) <br />PART 3 - EXECUTION <br />3.1 PREPARATION: <br />A. General: Refer to Section One of the General Conditions - Project Coordination. <br />B. Conditions of Work in Place: Carefully examine before beginning work; report all <br />defects. <br />B. Job Measurements: Take field measurements; report all discrepancies between plan <br />and field dimensions. <br />C. It shall be the responsibility of the AJV Contractor to provide a complete and functional <br />audio system, meeting the intent as described in the General Summary. <br />L.1 r% components <br />shall loll uc IV and physically inspected pr ivr w ii $touotiv, I. Co, I �Nv, IV, Its <br />with cosmetic damage during shipping shall not be acceptable. Proper mounting <br />fasteners and bracing shall be the responsibility of the Contractor. <br />E. Coordination with other trades shall be required to avoid any delays in construction <br />and verify conduit and power per plans and specifications. The required scope of work <br />from the audio system contractor shall include the purchase of all components, <br />installation, testing, programming and tuning of the audio system. Work to be provided <br />by others shall include power. A minimum of two (2) dedicated 20 -amp circuits shall be <br />required to power the equipment rack, <br />3.2 INSTALLATION: <br />A. General- Install in strict conformance with referenced standards, the manufacturer's <br />written directions, as shown, and as herein specified. <br />B. Wire & Cable: <br />
The URL can be used to link to this page
Your browser does not support the video tag.