Laserfiche WebLink
YOSEMI TE =! VENUE <br />L <br />-, <br />T � � <br />rr 1 1 <br />1 A <br />lI ! .�°�/.�✓�/'fir!%�1/.���_ <br />/777 77 -,x/77/-/.7/7/7��7/77,77,7 -, ,�-,77�/4 <br />:7 <br />A <br />Ek NIS 8 j <br />77\ f� CG%Ld/-G✓'GE/,.fir' '' l O_L./�"•��C,.L/�'�'.GL/11l � <br />1°e,/7 �! <br />EX BUONr <br />CM <br />7<V17 7C� <br />EX DAM= E <br />r a <br />j ---- <br />N <br />__® CD <br />ii <br />I (D }' <br />GRAVEL BAGS <br />AT PROJECT <br />> LIMITS <br />CAFErEFOA SWIM <br />I � 3 ( �­ -� i I LAGGREGATE AND CONCRETE WASTE MANAGEMENT AREA WM-8 <br />VEHICLE AND EQUIPMENT MAINTENANCE ARRA SIS -10 <br />L _L,=L _ii �- �S� - - SOLID WASTE MANAGEMENT AREA WM-s <br />- _ -• CONTRACTOR LAYDOWN AREA f JOB TRAILER <br /><� <br />L PP PR o� <br />LEGEND <br />'j EXISTING PAVED :SURFACES <br />777 <br />PROPOSED PAVED SURFACES <br />CATCH BASIN <br />(D CURB INLET SEDIMENT <br />PROTECTION SC -10 <br />INLET PROTECTION SCP -10 <br />STRAW ROLLS SC --5 <br />-.0*--- _ DIRECTION OF SURFACE DRAINAGE <br />STORM DRAIN INLET FILTER BAG NOTES: <br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC <br />2. CONSTRUCT ON GENTLY SLOPING STREETS WHERE WATER CAN POND <br />AND ALLOW SEDIMENT TO SEPARATE OUT OF SUSPENSION. <br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF <br />BAGS TO SERVE AS THE SPILLWAY. SPILLWAY HEIGHT SHALL BE <br />LOWER THAN CURB HEIGHT & SUFFICIENT IN SIZE TO PASS FLOWS <br />FROM SEVERE STORM EVENT. <br />4. PLACE 2 LAYERS OF GRAVEL BAGS OVER LAPPING BAGS AND PACK <br />THEM TIGHTLY TOGETHER TO 'MINIMIZE THE SPACE BETWEEN BAGS. <br />FILL BAG WITH 1/4- PEA GRAVEL <br />5. INSPECT & REPAIR FILTERS AFTER EA. STORM EVENT. REMOVE <br />SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. <br />REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO <br />A SEDIMENT BASIN OR OTHER FILTERING MEASURE. <br />6. SEDIMENT & GRAVEL SHALL BE IMMEDIATELY REMOVED FROM <br />TRAVELED WAY OF ROAD. <br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO PUBLIC WILL <br />REQUIRE DELINEATION DEVICES TO ALERT MOTORISTS, BICYCLISTS <br />AND PEDESTRIANS. THE USE OF SUCH DEVICES SHALL BE SUBJECT <br />TO THE RESIDENT ENGINEERS APPROVAL. <br />BACK OF CURB <br />GRAVEL BAGS TO <br />OVERLAP ONTO CURB <br />i� <br />FLOWLINE <br />EP/LIP <br />Nwrr rr� <br />SD i'O` INLET <br />PLAN VIEW <br />'- GRAVEL BAGS SHALL <br />BE MADE OF WOVEN <br />GEOTEXTILE FABRIC <br />1/4" PEA GRAVEL <br />EXISTING OPEN <br />BACK HOOD <br />17 7 <br />A. <br />y <br />5 CM (2") <br />MINIMUM <br />AT BACK <br />(FLOOD <br />RELEASE) <br />MAXIMUM <br />BAG WIDTH <br />PLACE PERFORATED PVC PIPE <br />ACROSS CURB OPENING TO <br />KEEP LARGE DEBRIS FROM <br />ENTERING STORM DRAIN SYSTEM <br />.MINIMUM <br />BAG WIDTH <br />(BACK OF GRA <br />FILTER TO REMAIN <br />THROUGH .BUILDOUT <br />SECTION A <br />n <br />AT FRONT <br />AND SIDES <br />DETAIL A <br />FILTER Bl <br />FRAI <br />(OPTIONAL) <br />F" S(1CT1 K1P_ <br />INLET FRAME <br />DETAIL A <br />11 <br />1.3 CMI <br />(•5") <br />MAXIMUM <br />CONCRETE WASTE MANAGEMENT NOTES <br />CONCRUE U RY MAST S <br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. <br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF IN A TEMPORARY CONCRETE WASHOUT <br />FACILITY. <br />3. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM <br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />4. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM <br />DRAINS OR RECEIVING WATERS. <br />5. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT AND ALLOW SLURRY TO DRY. DISPOSE OF <br />DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5. <br />6. COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD <br />SPECIFICATIONS SECTION 42-9.02 AND 42-2.02, "CONSTRUCTION. - <br />ON -SITE <br />CONSTRUCTION."ON-IT TEMPORARY CONCRETE WASHOUT F CI I TRANSIT TRUCK WASHOUT PROCEDURES <br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM <br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE <br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS <br />AREAS TO PREVENT DISTURBANCE OR TRACKING. <br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT <br />OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND <br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />C TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT <br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING <br />WASHOUT PROCEDURES. <br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. <br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE <br />CONCRETE SHALL BE BROKEN LIP, REMOVED, AND DISPOSED. DISPOSE OF HARDENED CONCRETE ON A <br />REGULAR BASIS. <br />TEMPORARY CONCRETE WASHOUT FACILITY (D(PE AQOVERADE <br />1. TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON <br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH <br />SUFFICIENT QUANTITY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY <br />WASHOUT OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE <br />CONTRACTOR'S EXPENSE, UPON APPROVAL OF THE ENGINEER. <br />2. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE <br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. <br />REMOVAL OF TEMPORARY CONCRETE WA5HQUT FACII l <br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS <br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF. <br />MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE <br />PROPERTY OF THE CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL 13E <br />DISPOSED OF. <br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE <br />PROJECT SPECIFICATIONS, <br />3. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE <br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY. <br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING AND <br />GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED. <br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING <br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITIES AND 12" FOR BELOW GRADE <br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND <br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION. <br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE <br />FRONTS€ONS fN SECTION 15-3.02, "REMOVAL METHODS", OF THE STANDARD SPECIFICATIONS. <br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE <br />ONCE THE WASHOUT IS 757 FULL. <br />GENERAL NOTES <br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. <br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DRAIN DIRECTLY INTO THE EXISTING UNDERGROUND STORM SYSTEM <br />BEFORE THE ONSITE STORM DRAIN SYSTEM, LANDSCAPE, AND PAVING IS INSTALLED AND COMPLETED. <br />3. AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM IS INSTALLED, THE CATCH BASINS SHALL BE <br />INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH BASINS, AS SHOWN. THE <br />CONTRACTOR SHALL HAVE AN OPTION TO INSTALL PREFABRICATED STEEL FRAMES WITH FILTER SCREEN OF FILTER FABRIC <br />ATTACHED TO THE FRONT OF THE DRAIN INLET AND EXTEND 12 INCHES (12") ON EACH SIDE OF THE DRAIN INLET <br />OPENING, FRAME SHALL BE APPROVED BY THE CITY ENGINEER AND SHALL FIT THE OPENING WITH LESS THAN <br />ONE --QUARTER INCH (1/4") GAP AT ANY ONE POINT, <br />4. THE NAME, ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR IMPLEMENTATION OF THE <br />EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE PROVIDED. <br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1--1/2" DIAMETER OR LARGER, AT A MINIMUM DEPTH OF 6", SHALL BE INSTALLED <br />AT EACH DRIVEWAY ENTRANCE TO THE SITE. THIS DOES NOT NEED TO BE DONE AT DRIVEWAYS, WHICH WILL BE CLOSED <br />BY IMMOVABLE BARRICADES DURING CONSTRUCTION. <br />6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. <br />CHANGES TO THE EROSION AND SEDIMENTATION CONTROL PLAN .SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY <br />WITH THE APPROVAL OF OR AT THE DIRECTION OF THE CITY ENGINEER. <br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. <br />THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF FROM ENTERING ANY STORM DRAINAGE <br />SYSTEM. <br />8. THE EROSION AND SEDIMENTATION CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH CONSTRUCTION IS TO <br />TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH SUBSEQUENT YEAR UNTIL THE CITY <br />ACCEPTS THE SITE IMPROVEMENTS. <br />9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END <br />OF EACH WORK DAY DURING THE RAINY SEASON. <br />10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE LEVEL OF SEDIMENT <br />REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS. <br />11. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PROTECT TEMPORARY BORROW AREAS ANO/OR STOCKPILES WITH <br />APPROPRIATE EROSION CONTROL MEASURES SATISFACTORY TO THE CITY ENGINEER. <br />12. THE CLEANING OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONSTRUCTION, SHALL BE PERFORMED WITH <br />MECHANICAL SWEEPERS. THE USE OF WATER TRUCKS TO "WASH DOWN" THE STREET IS PROHIBITED. <br />13. SEAL OR SKIRT BETWEEN TRAILER & GRADING TO PREVENT EXPOSURE TO DRAIN, <br />14. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. <br />15, THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR <br />AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES <br />CONTROL BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN. <br />16. BMPS WM--5, NS -10, WM-6, AND TC -1 ARE SHOWN SCHEMATICALLY. THESE BMPS CAN BE MOVED TO FIT THE SITE <br />CONSTRUCTION STAGING AS NEEDED BUT THEY SHALL REMAIN IN PLACE THROUGHOUT THE PROJECT CONSTRUCTION, <br />l l ■ i • <br />ASN W w 171 c r e n g c Q rri i R a t • <br />Copyright 02014 Rainforth Grau Architects. All rights reserved, Reprodulotion of these plans; either in whole or in pari, including any form <br />of copying and/or preparation of derivative works thereof, for any reason without prior written permission, is strictly prohibited. <br />[TSA <br />File No. 39-53 <br />IDENTIFICATION STAMP <br />DIV, OF THE STATE ARCHITECT <br />02 914490 INC 9 <br />AC FLS SS <br />DATE t 11'`Z, <br />.S`"_..-. <br />LINCOLN E.S. CAFETERIA & <br />ICLASSROOM MODERNIZATION, <br />.,INCREMENT 1: CAFETERIA <br />MANTECA UNIFIED SCHOOL DISTRICT <br />A <br />DRAWNPROJECT` NO. <br />SLS 15-094 <br />CHECKED DATE <br />JDE 6-26-15 <br />SCALE SHEET <br />AS NOTED ��""�� <br />C8.0■1 <br />ri`'STABILIZED <br />.CONSTRUCTION <br />ENTRANCE <br />PROJECTGRAVEL BAGS <br />AT <br />LIMITS <br />INLET FRAME <br />DETAIL A <br />11 <br />1.3 CMI <br />(•5") <br />MAXIMUM <br />CONCRETE WASTE MANAGEMENT NOTES <br />CONCRUE U RY MAST S <br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES. <br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF IN A TEMPORARY CONCRETE WASHOUT <br />FACILITY. <br />3. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM <br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />4. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM <br />DRAINS OR RECEIVING WATERS. <br />5. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT AND ALLOW SLURRY TO DRY. DISPOSE OF <br />DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5. <br />6. COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD <br />SPECIFICATIONS SECTION 42-9.02 AND 42-2.02, "CONSTRUCTION. - <br />ON -SITE <br />CONSTRUCTION."ON-IT TEMPORARY CONCRETE WASHOUT F CI I TRANSIT TRUCK WASHOUT PROCEDURES <br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM <br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE <br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS <br />AREAS TO PREVENT DISTURBANCE OR TRACKING. <br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT <br />OPERATORS TO UTILIZE THE PROPER FACILITIES. <br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND <br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />C TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT <br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING <br />WASHOUT PROCEDURES. <br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. <br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE <br />CONCRETE SHALL BE BROKEN LIP, REMOVED, AND DISPOSED. DISPOSE OF HARDENED CONCRETE ON A <br />REGULAR BASIS. <br />TEMPORARY CONCRETE WASHOUT FACILITY (D(PE AQOVERADE <br />1. TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON <br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH <br />SUFFICIENT QUANTITY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY <br />WASHOUT OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE <br />CONTRACTOR'S EXPENSE, UPON APPROVAL OF THE ENGINEER. <br />2. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE <br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. <br />REMOVAL OF TEMPORARY CONCRETE WA5HQUT FACII l <br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS <br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF. <br />MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE <br />PROPERTY OF THE CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL 13E <br />DISPOSED OF. <br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE <br />PROJECT SPECIFICATIONS, <br />3. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE <br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY. <br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING AND <br />GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED. <br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING <br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITIES AND 12" FOR BELOW GRADE <br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND <br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION. <br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE <br />FRONTS€ONS fN SECTION 15-3.02, "REMOVAL METHODS", OF THE STANDARD SPECIFICATIONS. <br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE <br />ONCE THE WASHOUT IS 757 FULL. <br />GENERAL NOTES <br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. <br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DRAIN DIRECTLY INTO THE EXISTING UNDERGROUND STORM SYSTEM <br />BEFORE THE ONSITE STORM DRAIN SYSTEM, LANDSCAPE, AND PAVING IS INSTALLED AND COMPLETED. <br />3. AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM IS INSTALLED, THE CATCH BASINS SHALL BE <br />INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH BASINS, AS SHOWN. THE <br />CONTRACTOR SHALL HAVE AN OPTION TO INSTALL PREFABRICATED STEEL FRAMES WITH FILTER SCREEN OF FILTER FABRIC <br />ATTACHED TO THE FRONT OF THE DRAIN INLET AND EXTEND 12 INCHES (12") ON EACH SIDE OF THE DRAIN INLET <br />OPENING, FRAME SHALL BE APPROVED BY THE CITY ENGINEER AND SHALL FIT THE OPENING WITH LESS THAN <br />ONE --QUARTER INCH (1/4") GAP AT ANY ONE POINT, <br />4. THE NAME, ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR IMPLEMENTATION OF THE <br />EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE PROVIDED. <br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1--1/2" DIAMETER OR LARGER, AT A MINIMUM DEPTH OF 6", SHALL BE INSTALLED <br />AT EACH DRIVEWAY ENTRANCE TO THE SITE. THIS DOES NOT NEED TO BE DONE AT DRIVEWAYS, WHICH WILL BE CLOSED <br />BY IMMOVABLE BARRICADES DURING CONSTRUCTION. <br />6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. <br />CHANGES TO THE EROSION AND SEDIMENTATION CONTROL PLAN .SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY <br />WITH THE APPROVAL OF OR AT THE DIRECTION OF THE CITY ENGINEER. <br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. <br />THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF FROM ENTERING ANY STORM DRAINAGE <br />SYSTEM. <br />8. THE EROSION AND SEDIMENTATION CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH CONSTRUCTION IS TO <br />TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH SUBSEQUENT YEAR UNTIL THE CITY <br />ACCEPTS THE SITE IMPROVEMENTS. <br />9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END <br />OF EACH WORK DAY DURING THE RAINY SEASON. <br />10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE LEVEL OF SEDIMENT <br />REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS. <br />11. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PROTECT TEMPORARY BORROW AREAS ANO/OR STOCKPILES WITH <br />APPROPRIATE EROSION CONTROL MEASURES SATISFACTORY TO THE CITY ENGINEER. <br />12. THE CLEANING OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONSTRUCTION, SHALL BE PERFORMED WITH <br />MECHANICAL SWEEPERS. THE USE OF WATER TRUCKS TO "WASH DOWN" THE STREET IS PROHIBITED. <br />13. SEAL OR SKIRT BETWEEN TRAILER & GRADING TO PREVENT EXPOSURE TO DRAIN, <br />14. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. <br />15, THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR <br />AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES <br />CONTROL BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN. <br />16. BMPS WM--5, NS -10, WM-6, AND TC -1 ARE SHOWN SCHEMATICALLY. THESE BMPS CAN BE MOVED TO FIT THE SITE <br />CONSTRUCTION STAGING AS NEEDED BUT THEY SHALL REMAIN IN PLACE THROUGHOUT THE PROJECT CONSTRUCTION, <br />l l ■ i • <br />ASN W w 171 c r e n g c Q rri i R a t • <br />Copyright 02014 Rainforth Grau Architects. All rights reserved, Reprodulotion of these plans; either in whole or in pari, including any form <br />of copying and/or preparation of derivative works thereof, for any reason without prior written permission, is strictly prohibited. <br />[TSA <br />File No. 39-53 <br />IDENTIFICATION STAMP <br />DIV, OF THE STATE ARCHITECT <br />02 914490 INC 9 <br />AC FLS SS <br />DATE t 11'`Z, <br />.S`"_..-. <br />LINCOLN E.S. CAFETERIA & <br />ICLASSROOM MODERNIZATION, <br />.,INCREMENT 1: CAFETERIA <br />MANTECA UNIFIED SCHOOL DISTRICT <br />A <br />DRAWNPROJECT` NO. <br />SLS 15-094 <br />CHECKED DATE <br />JDE 6-26-15 <br />SCALE SHEET <br />AS NOTED ��""�� <br />C8.0■1 <br />