YOSEMI TE =! VENUE
<br />L
<br />-,
<br />T � �
<br />rr 1 1
<br />1 A
<br />lI ! .�°�/.�✓�/'fir!%�1/.���_
<br />/777 77 -,x/77/-/.7/7/7��7/77,77,7 -, ,�-,77�/4
<br />:7
<br />A
<br />Ek NIS 8 j
<br />77\ f� CG%Ld/-G✓'GE/,.fir' '' l O_L./�"•��C,.L/�'�'.GL/11l �
<br />1°e,/7 �!
<br />EX BUONr
<br />CM
<br />7<V17 7C�
<br />EX DAM= E
<br />r a
<br />j ----
<br />N
<br />__® CD
<br />ii
<br />I (D }'
<br />GRAVEL BAGS
<br />AT PROJECT
<br />> LIMITS
<br />CAFErEFOA SWIM
<br />I � 3 ( � -� i I LAGGREGATE AND CONCRETE WASTE MANAGEMENT AREA WM-8
<br />VEHICLE AND EQUIPMENT MAINTENANCE ARRA SIS -10
<br />L _L,=L _ii �- �S� - - SOLID WASTE MANAGEMENT AREA WM-s
<br />- _ -• CONTRACTOR LAYDOWN AREA f JOB TRAILER
<br /><�
<br />L PP PR o�
<br />LEGEND
<br />'j EXISTING PAVED :SURFACES
<br />777
<br />PROPOSED PAVED SURFACES
<br />CATCH BASIN
<br />(D CURB INLET SEDIMENT
<br />PROTECTION SC -10
<br />INLET PROTECTION SCP -10
<br />STRAW ROLLS SC --5
<br />-.0*--- _ DIRECTION OF SURFACE DRAINAGE
<br />STORM DRAIN INLET FILTER BAG NOTES:
<br />1. GRAVEL BAGS SHALL BE WOVEN GEOTEXTILE FABRIC
<br />2. CONSTRUCT ON GENTLY SLOPING STREETS WHERE WATER CAN POND
<br />AND ALLOW SEDIMENT TO SEPARATE OUT OF SUSPENSION.
<br />3. LEAVE A GAP OF ONE BAG IN THE MIDDLE OF THE TOP ROW OF
<br />BAGS TO SERVE AS THE SPILLWAY. SPILLWAY HEIGHT SHALL BE
<br />LOWER THAN CURB HEIGHT & SUFFICIENT IN SIZE TO PASS FLOWS
<br />FROM SEVERE STORM EVENT.
<br />4. PLACE 2 LAYERS OF GRAVEL BAGS OVER LAPPING BAGS AND PACK
<br />THEM TIGHTLY TOGETHER TO 'MINIMIZE THE SPACE BETWEEN BAGS.
<br />FILL BAG WITH 1/4- PEA GRAVEL
<br />5. INSPECT & REPAIR FILTERS AFTER EA. STORM EVENT. REMOVE
<br />SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED.
<br />REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO
<br />A SEDIMENT BASIN OR OTHER FILTERING MEASURE.
<br />6. SEDIMENT & GRAVEL SHALL BE IMMEDIATELY REMOVED FROM
<br />TRAVELED WAY OF ROAD.
<br />7. GRAVEL BAG INLET PROTECTION ON ROADS OPEN TO PUBLIC WILL
<br />REQUIRE DELINEATION DEVICES TO ALERT MOTORISTS, BICYCLISTS
<br />AND PEDESTRIANS. THE USE OF SUCH DEVICES SHALL BE SUBJECT
<br />TO THE RESIDENT ENGINEERS APPROVAL.
<br />BACK OF CURB
<br />GRAVEL BAGS TO
<br />OVERLAP ONTO CURB
<br />i�
<br />FLOWLINE
<br />EP/LIP
<br />Nwrr rr�
<br />SD i'O` INLET
<br />PLAN VIEW
<br />'- GRAVEL BAGS SHALL
<br />BE MADE OF WOVEN
<br />GEOTEXTILE FABRIC
<br />1/4" PEA GRAVEL
<br />EXISTING OPEN
<br />BACK HOOD
<br />17 7
<br />A.
<br />y
<br />5 CM (2")
<br />MINIMUM
<br />AT BACK
<br />(FLOOD
<br />RELEASE)
<br />MAXIMUM
<br />BAG WIDTH
<br />PLACE PERFORATED PVC PIPE
<br />ACROSS CURB OPENING TO
<br />KEEP LARGE DEBRIS FROM
<br />ENTERING STORM DRAIN SYSTEM
<br />.MINIMUM
<br />BAG WIDTH
<br />(BACK OF GRA
<br />FILTER TO REMAIN
<br />THROUGH .BUILDOUT
<br />SECTION A
<br />n
<br />AT FRONT
<br />AND SIDES
<br />DETAIL A
<br />FILTER Bl
<br />FRAI
<br />(OPTIONAL)
<br />F" S(1CT1 K1P_
<br />INLET FRAME
<br />DETAIL A
<br />11
<br />1.3 CMI
<br />(•5")
<br />MAXIMUM
<br />CONCRETE WASTE MANAGEMENT NOTES
<br />CONCRUE U RY MAST S
<br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES.
<br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF IN A TEMPORARY CONCRETE WASHOUT
<br />FACILITY.
<br />3. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM
<br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.
<br />4. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM
<br />DRAINS OR RECEIVING WATERS.
<br />5. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT AND ALLOW SLURRY TO DRY. DISPOSE OF
<br />DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5.
<br />6. COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD
<br />SPECIFICATIONS SECTION 42-9.02 AND 42-2.02, "CONSTRUCTION. -
<br />ON -SITE
<br />CONSTRUCTION."ON-IT TEMPORARY CONCRETE WASHOUT F CI I TRANSIT TRUCK WASHOUT PROCEDURES
<br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM
<br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE
<br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS
<br />AREAS TO PREVENT DISTURBANCE OR TRACKING.
<br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT
<br />OPERATORS TO UTILIZE THE PROPER FACILITIES.
<br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY
<br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND
<br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.
<br />C TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT
<br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING
<br />WASHOUT PROCEDURES.
<br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY.
<br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE
<br />CONCRETE SHALL BE BROKEN LIP, REMOVED, AND DISPOSED. DISPOSE OF HARDENED CONCRETE ON A
<br />REGULAR BASIS.
<br />TEMPORARY CONCRETE WASHOUT FACILITY (D(PE AQOVERADE
<br />1. TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON
<br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH
<br />SUFFICIENT QUANTITY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY
<br />WASHOUT OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE
<br />CONTRACTOR'S EXPENSE, UPON APPROVAL OF THE ENGINEER.
<br />2. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE
<br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL.
<br />REMOVAL OF TEMPORARY CONCRETE WA5HQUT FACII l
<br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS
<br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF.
<br />MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE
<br />PROPERTY OF THE CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL 13E
<br />DISPOSED OF.
<br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY
<br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE
<br />PROJECT SPECIFICATIONS,
<br />3. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE
<br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY.
<br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING AND
<br />GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED.
<br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING
<br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITIES AND 12" FOR BELOW GRADE
<br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND
<br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION.
<br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE
<br />FRONTS€ONS fN SECTION 15-3.02, "REMOVAL METHODS", OF THE STANDARD SPECIFICATIONS.
<br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE
<br />ONCE THE WASHOUT IS 757 FULL.
<br />GENERAL NOTES
<br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE CONSTRUCTION ACTIVITY.
<br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DRAIN DIRECTLY INTO THE EXISTING UNDERGROUND STORM SYSTEM
<br />BEFORE THE ONSITE STORM DRAIN SYSTEM, LANDSCAPE, AND PAVING IS INSTALLED AND COMPLETED.
<br />3. AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM IS INSTALLED, THE CATCH BASINS SHALL BE
<br />INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH BASINS, AS SHOWN. THE
<br />CONTRACTOR SHALL HAVE AN OPTION TO INSTALL PREFABRICATED STEEL FRAMES WITH FILTER SCREEN OF FILTER FABRIC
<br />ATTACHED TO THE FRONT OF THE DRAIN INLET AND EXTEND 12 INCHES (12") ON EACH SIDE OF THE DRAIN INLET
<br />OPENING, FRAME SHALL BE APPROVED BY THE CITY ENGINEER AND SHALL FIT THE OPENING WITH LESS THAN
<br />ONE --QUARTER INCH (1/4") GAP AT ANY ONE POINT,
<br />4. THE NAME, ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR IMPLEMENTATION OF THE
<br />EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE PROVIDED.
<br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1--1/2" DIAMETER OR LARGER, AT A MINIMUM DEPTH OF 6", SHALL BE INSTALLED
<br />AT EACH DRIVEWAY ENTRANCE TO THE SITE. THIS DOES NOT NEED TO BE DONE AT DRIVEWAYS, WHICH WILL BE CLOSED
<br />BY IMMOVABLE BARRICADES DURING CONSTRUCTION.
<br />6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED.
<br />CHANGES TO THE EROSION AND SEDIMENTATION CONTROL PLAN .SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY
<br />WITH THE APPROVAL OF OR AT THE DIRECTION OF THE CITY ENGINEER.
<br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS.
<br />THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF FROM ENTERING ANY STORM DRAINAGE
<br />SYSTEM.
<br />8. THE EROSION AND SEDIMENTATION CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH CONSTRUCTION IS TO
<br />TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH SUBSEQUENT YEAR UNTIL THE CITY
<br />ACCEPTS THE SITE IMPROVEMENTS.
<br />9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END
<br />OF EACH WORK DAY DURING THE RAINY SEASON.
<br />10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE LEVEL OF SEDIMENT
<br />REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS.
<br />11. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PROTECT TEMPORARY BORROW AREAS ANO/OR STOCKPILES WITH
<br />APPROPRIATE EROSION CONTROL MEASURES SATISFACTORY TO THE CITY ENGINEER.
<br />12. THE CLEANING OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONSTRUCTION, SHALL BE PERFORMED WITH
<br />MECHANICAL SWEEPERS. THE USE OF WATER TRUCKS TO "WASH DOWN" THE STREET IS PROHIBITED.
<br />13. SEAL OR SKIRT BETWEEN TRAILER & GRADING TO PREVENT EXPOSURE TO DRAIN,
<br />14. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.
<br />15, THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR
<br />AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES
<br />CONTROL BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN.
<br />16. BMPS WM--5, NS -10, WM-6, AND TC -1 ARE SHOWN SCHEMATICALLY. THESE BMPS CAN BE MOVED TO FIT THE SITE
<br />CONSTRUCTION STAGING AS NEEDED BUT THEY SHALL REMAIN IN PLACE THROUGHOUT THE PROJECT CONSTRUCTION,
<br />l l ■ i •
<br />ASN W w 171 c r e n g c Q rri i R a t •
<br />Copyright 02014 Rainforth Grau Architects. All rights reserved, Reprodulotion of these plans; either in whole or in pari, including any form
<br />of copying and/or preparation of derivative works thereof, for any reason without prior written permission, is strictly prohibited.
<br />[TSA
<br />File No. 39-53
<br />IDENTIFICATION STAMP
<br />DIV, OF THE STATE ARCHITECT
<br />02 914490 INC 9
<br />AC FLS SS
<br />DATE t 11'`Z,
<br />.S`"_..-.
<br />LINCOLN E.S. CAFETERIA &
<br />ICLASSROOM MODERNIZATION,
<br />.,INCREMENT 1: CAFETERIA
<br />MANTECA UNIFIED SCHOOL DISTRICT
<br />A
<br />DRAWNPROJECT` NO.
<br />SLS 15-094
<br />CHECKED DATE
<br />JDE 6-26-15
<br />SCALE SHEET
<br />AS NOTED ��""��
<br />C8.0■1
<br />ri`'STABILIZED
<br />.CONSTRUCTION
<br />ENTRANCE
<br />PROJECTGRAVEL BAGS
<br />AT
<br />LIMITS
<br />INLET FRAME
<br />DETAIL A
<br />11
<br />1.3 CMI
<br />(•5")
<br />MAXIMUM
<br />CONCRETE WASTE MANAGEMENT NOTES
<br />CONCRUE U RY MAST S
<br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES.
<br />2. PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF IN A TEMPORARY CONCRETE WASHOUT
<br />FACILITY.
<br />3. A SIGN SHALL BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM
<br />CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.
<br />4. DO NOT ALLOW SLURRY RESIDUE FROM WET CORING OR SAW -CUTTING AC OR PCC TO ENTER STORM
<br />DRAINS OR RECEIVING WATERS.
<br />5. VACUUM SLURRY RESIDUE AND DISPOSE IN A TEMPORARY PIT AND ALLOW SLURRY TO DRY. DISPOSE OF
<br />DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WM-5.
<br />6. COLLECT RESIDUE FROM GROOVING AND GRINDING OPERATIONS IN ACCORDANCE WITH STANDARD
<br />SPECIFICATIONS SECTION 42-9.02 AND 42-2.02, "CONSTRUCTION. -
<br />ON -SITE
<br />CONSTRUCTION."ON-IT TEMPORARY CONCRETE WASHOUT F CI I TRANSIT TRUCK WASHOUT PROCEDURES
<br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 15 M (50 FT.) FROM
<br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE
<br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS
<br />AREAS TO PREVENT DISTURBANCE OR TRACKING.
<br />2. A SIGN SHALL BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT
<br />OPERATORS TO UTILIZE THE PROPER FACILITIES.
<br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY
<br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND
<br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.
<br />C TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFICIENT
<br />VOLUME TO COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE MATERIALS GENERATED DURING
<br />WASHOUT PROCEDURES.
<br />5. PERFORM WASHOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY.
<br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE
<br />CONCRETE SHALL BE BROKEN LIP, REMOVED, AND DISPOSED. DISPOSE OF HARDENED CONCRETE ON A
<br />REGULAR BASIS.
<br />TEMPORARY CONCRETE WASHOUT FACILITY (D(PE AQOVERADE
<br />1. TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON
<br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M (10 FEET), BUT WITH
<br />SUFFICIENT QUANTITY AND VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY
<br />WASHOUT OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE
<br />CONTRACTOR'S EXPENSE, UPON APPROVAL OF THE ENGINEER.
<br />2. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE
<br />OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL.
<br />REMOVAL OF TEMPORARY CONCRETE WA5HQUT FACII l
<br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS
<br />DETERMINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF.
<br />MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BECOME THE
<br />PROPERTY OF THE CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL 13E
<br />DISPOSED OF.
<br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY
<br />CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH THE
<br />PROJECT SPECIFICATIONS,
<br />3. THE CONTRACTOR'S WASTE POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SITE CONCRETE
<br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY.
<br />4. THE WPCM SHALL MONITOR CONCRETE WORKING TASKS, SUCH AS SAW CUTTING, CORING, GRINDING AND
<br />GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED.
<br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE ADEQUATE HOLDING
<br />CAPACITY WITH A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACILITIES AND 12" FOR BELOW GRADE
<br />FACILITIES. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND
<br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION.
<br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF IN CONFORMANCE WITH THE
<br />FRONTS€ONS fN SECTION 15-3.02, "REMOVAL METHODS", OF THE STANDARD SPECIFICATIONS.
<br />6. EXISTING FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE
<br />ONCE THE WASHOUT IS 757 FULL.
<br />GENERAL NOTES
<br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE CONSTRUCTION ACTIVITY.
<br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DRAIN DIRECTLY INTO THE EXISTING UNDERGROUND STORM SYSTEM
<br />BEFORE THE ONSITE STORM DRAIN SYSTEM, LANDSCAPE, AND PAVING IS INSTALLED AND COMPLETED.
<br />3. AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM IS INSTALLED, THE CATCH BASINS SHALL BE
<br />INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH BASINS, AS SHOWN. THE
<br />CONTRACTOR SHALL HAVE AN OPTION TO INSTALL PREFABRICATED STEEL FRAMES WITH FILTER SCREEN OF FILTER FABRIC
<br />ATTACHED TO THE FRONT OF THE DRAIN INLET AND EXTEND 12 INCHES (12") ON EACH SIDE OF THE DRAIN INLET
<br />OPENING, FRAME SHALL BE APPROVED BY THE CITY ENGINEER AND SHALL FIT THE OPENING WITH LESS THAN
<br />ONE --QUARTER INCH (1/4") GAP AT ANY ONE POINT,
<br />4. THE NAME, ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR IMPLEMENTATION OF THE
<br />EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE PROVIDED.
<br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1--1/2" DIAMETER OR LARGER, AT A MINIMUM DEPTH OF 6", SHALL BE INSTALLED
<br />AT EACH DRIVEWAY ENTRANCE TO THE SITE. THIS DOES NOT NEED TO BE DONE AT DRIVEWAYS, WHICH WILL BE CLOSED
<br />BY IMMOVABLE BARRICADES DURING CONSTRUCTION.
<br />6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED.
<br />CHANGES TO THE EROSION AND SEDIMENTATION CONTROL PLAN .SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY
<br />WITH THE APPROVAL OF OR AT THE DIRECTION OF THE CITY ENGINEER.
<br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS.
<br />THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF FROM ENTERING ANY STORM DRAINAGE
<br />SYSTEM.
<br />8. THE EROSION AND SEDIMENTATION CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH CONSTRUCTION IS TO
<br />TAKE PLACE. PLANS ARE TO BE RESUBMITTED PRIOR TO SEPTEMBER 1 OF EACH SUBSEQUENT YEAR UNTIL THE CITY
<br />ACCEPTS THE SITE IMPROVEMENTS.
<br />9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END
<br />OF EACH WORK DAY DURING THE RAINY SEASON.
<br />10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE LEVEL OF SEDIMENT
<br />REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS.
<br />11. IT IS THE RESPONSIBILITIES OF THE CONTRACTOR TO PROTECT TEMPORARY BORROW AREAS ANO/OR STOCKPILES WITH
<br />APPROPRIATE EROSION CONTROL MEASURES SATISFACTORY TO THE CITY ENGINEER.
<br />12. THE CLEANING OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONSTRUCTION, SHALL BE PERFORMED WITH
<br />MECHANICAL SWEEPERS. THE USE OF WATER TRUCKS TO "WASH DOWN" THE STREET IS PROHIBITED.
<br />13. SEAL OR SKIRT BETWEEN TRAILER & GRADING TO PREVENT EXPOSURE TO DRAIN,
<br />14. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.
<br />15, THE INFORMATION ON THIS PLAN IS INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR
<br />AND SUBCONTRACTORS TO COMPLY WITH THE REQUIREMENTS OF THE STATE WATER RESOURCES
<br />CONTROL BOARD. FIELD CONDITIONS MAY NECESSITATE MODIFICATIONS TO THIS PLAN.
<br />16. BMPS WM--5, NS -10, WM-6, AND TC -1 ARE SHOWN SCHEMATICALLY. THESE BMPS CAN BE MOVED TO FIT THE SITE
<br />CONSTRUCTION STAGING AS NEEDED BUT THEY SHALL REMAIN IN PLACE THROUGHOUT THE PROJECT CONSTRUCTION,
<br />l l ■ i •
<br />ASN W w 171 c r e n g c Q rri i R a t •
<br />Copyright 02014 Rainforth Grau Architects. All rights reserved, Reprodulotion of these plans; either in whole or in pari, including any form
<br />of copying and/or preparation of derivative works thereof, for any reason without prior written permission, is strictly prohibited.
<br />[TSA
<br />File No. 39-53
<br />IDENTIFICATION STAMP
<br />DIV, OF THE STATE ARCHITECT
<br />02 914490 INC 9
<br />AC FLS SS
<br />DATE t 11'`Z,
<br />.S`"_..-.
<br />LINCOLN E.S. CAFETERIA &
<br />ICLASSROOM MODERNIZATION,
<br />.,INCREMENT 1: CAFETERIA
<br />MANTECA UNIFIED SCHOOL DISTRICT
<br />A
<br />DRAWNPROJECT` NO.
<br />SLS 15-094
<br />CHECKED DATE
<br />JDE 6-26-15
<br />SCALE SHEET
<br />AS NOTED ��""��
<br />C8.0■1
<br />
|