Laserfiche WebLink
3/8" LAG SCREWS (2�) <br />LOCATION ON EA. <br />LONG SIDE TOTAL () <br />ESTIMATED WEIGHT (LBS.) 8 (:I of <br />II It <br />F.57,0 REFRIG-O-PAK SYSTEM ITS -4 <br />ELECTRICAL <br />CONTROL PANEL <br />HEAVY DUTY <br />PLATFORM BY <br />GENERAL CONTRACTOR <br />ROOF <br />CONTROL <br />- <br />CIRCUIT WRING <br />CONDUIT <br />MAIN FUSIBLE <br />DISCONNECT <br />RAIN -TIGHT FLEXIBLE <br />CONDUITS BY <br />ELECTRICAL <br />CONTRACTOR <br />POWER FEEDER <br />WIRING CONDUIT <br />MODELS: ADT 1 LET <br />CID <br />C14 <br />ELEVATION <br />15.81" <br />R <br />(0 <br />C`I <br />3/4" NPT --X' <br />DRAIN <br />END VIEW <br />AI•1:3 9 <br />"r-41111 101 VIE <br />1 LOIN <br />TEMP <br />AT LOVA TEMP UNITS (FREEZERS) iI COIL <br />ONLY ELECTRICAL CONTRACTOR TO <br />MOUNT ELECTRIC HEATER CABLE <br />AROUND DRAIN LINE. CABLE TO BE <br />SPIRALED AND TAPED M DRAIN LINE. --- . <br />COPPER UNION ON DRAIN LIME <br />MINIMUM 1" THICK ARMAFLEX <br />INSULATION AROUND FREEZER COIL'S <br />DRAIN LINE AND HEATER CABLE <br />REFER TO 2/FS4.0.0 FOR LOCATION <br />T'Y P I C A E,. DETAIL AT FREEZER <br />P'°�'7. Q 1AIA L. IC` I i�I � � � h•I I� E N � A'r E C3 R A I N L I I'eI � <br />62" <br />12" <br />F _ _ �1T_CH I_0CKE­r 0P N1n�G_F_0 �.. <br />REFRIGERATION LINES <br />-OUTLINE OF <br />r I REFRIGERATION RACK <br />6 <br />0 PITCH POCKET OPENING FOR 4" <br />ELECTRICAL LINES - .,.,. - _._.._. - - - � <br />4% 6m <br />6eq <br />" <br />PLAN VIEW OF 56"x 62" ROOF PLATFORM <br />Te <br />! l '. <br />-# T <br />i <br />MAIN FUSIBLE <br />DISCONNECT - <br />REFRIGERATION LINES ` <br />TO RUN INSIDE OF <br />RACK AT THIS END -----.,,M <br />HEAVY DUTY <br />PLATFORM BY GENERAL <br />CONTRACTOR <br />ROOF---\ <br />COOLTEC ENGINEERING � lJ ISA �� POWER SuPP�.Y:2O8�t/3PH�`6OHZ FUSE SIZE: 30 AMP <br />CONNECTED LOAD=23.1 AMP MINIMUM AZviPACITY= 25.3AMP <br />FIXTURES COMPRESSORS UNIT COOLER SYSTEM LINE SIZE (O.D.) AND RUN ACCESSORIES (SEE SUPPLY CODE *} <br />TEMP(F) a RATING 0 60 HZ TOTAL PLOWER � � � C> ,- ,? <br />MODEL 208V 60 Hz w ac � 0 c � es 5 � 0 <br />C2 � � � � 6O Hz RATING EwIGH. � � � � � � � c� � � 0 � � � a� � ups t,a TIME CLOCK <br />DESCRIPTION MODEL 95 F c� 1 FAN E�IEATER is ISI a�I 0 � � � �- � !- '� � � � � w �. x <br />�` RLA V E'Ii tz RLA V FLA PH AMPS PH c 0 % ►' > <br />RS -4 CONDENSER FAN <br />MOTORS <br />A 3 WALK-IN FREEZER m 10 p-20 404A 16 ZF09K4E-TE"6 3.0 8.7 208 3 11.1 E 3A 1 LET09013EK 1.0 2087.8 208 1 9.7 3 5 7/'8 3/S 100 F" F F' F F F' E= DT XB -240 <br />CONDENSER FAN MOTOR 1/2 3.6 206 1 3.6 1 <br />B 4 WALK-IN COOLER 35 25 404A 16 ZS09KAE-TF5 1.€i 7.2 208 3 12..5 G 4A 1 ADT104AEK 1.6 115 7.2 3 S 7/8 3/€� 1OC} F F F F F F MIL -72A <br />CONDENSER FAN MOTOR 1/2 3.6 206 1 3.6 1 <br />MODEL N E ELECTRIC (TIMED) E3 BRANCH * F - FACTORYSUPPLY INSTALLEDG GRAVITY (TIMES)) M MAIN L - LOOSE (FIELD INSTALLED) <br />0I PS -4 H HOT GAS (TIMED) M - MANUFACTURER EQUIPPED <br />O OFF CYCLE (TEMP. S SINGLE R REFRIGERATION CONTRACTOR <br />C UOL US LISTEED �- ALL SYSTEMS ENGINEERED WITH R -404A REFRIGERANT'. ANY EASES/COILS NOT SUPPLIED BY COOLTEC MUST BE EQUIPPED WITH R -404A EXPANSION `SALVE=S. <br />DOTE: �- REFRIGERATION PIPE SIZES ARE BASED ON A MAXIMUM LINE RUN UP TO 100 EQUIVALENT FET FOR LIQUID AND SUCTION LINES. <br />CONDENSING UNIT VERIFY LINE LENGTHS WITH JOS SITE CONDITIONS AND LINE ROUTING AT INDIVIDUAL INSTALLATIONS. <br />- "COMPRESSOR MOTOR PROTECTED UNDER PRIMARY SINGLE PHASE PROTECTION" <br />33SZ FILE SA32027 -- EFFECTIVE JANUARY 1. 2009, ALL WALK-IN COOLER AND FREEZE EVAPORATIVE COILS INSTALLED IN THE U.S.A. SHALL BE SUPPLIED WITH ENERGY <br />EFFICIENT (EC) MOTORS BASED ON THE FEDERAL ENERGY INDEPENDENCE AND SECURITY ACT (HR -6). <br />2" HIGH PITCH POCKET COLLAR <br />18 GA. GALVANIZED STEEL SHEET HENRY #208 WET PATCH <br />METAL CAF, ROOF CEMENT <br />ROORNG <br />311 THICK MATERIAL TO <br />PLYWOOD SiiB -TOP I RUN UP UNDER <br />36" 36" <br />HEAVY GAUGE CAP <br />CLEAR CLEAR CONTINUOUS <br />STEEL FRAMING COVING <br />MAXIMUM 16" <br />62" PLATFORM <br />O.C. SPACING , ROOF <br />12" 48" RACK 2" <br />ROOF <br />56"x W c 6" HIGH PLATFORM 4" STRUCTURE r� <br />Fin <br />2" HIGH PITCH POCKET <br />COLLAR FOR <br />ELECTIRICAL <br />CARDBOARD WITH <br />DUCT TAPE TO <br />HOLD FOAM IN PLACE <br />PLATFORMI <br />MINIMUM _ <br />f:" HIGH 1= <br />:m 2" HIGH FLITCH <br />POCKET COLLAR <br />ROOF -- FOR REFRIGERATION <br />TRIPLE EXPANDABLE <br />FOAM INSULATION <br />INSTRUCTIONS FOR REFRIGERATION CONTRACTOR <br />A. TAPE CARDBOARD AT THE BOTTOM OF EACH PITCH POCKET OPENING <br />AS SHOWN. <br />B. AT THE TOP OF THE PITCH POCKET OPENING, FILL IN WITH TRIPLE <br />EXPANDABLE FOAM INSULATION (DOW CHEMICAL -GREAT ST'UF'F INSULATING <br />FOAM), AND LET FOAM CURE FOR ONE HOUR. <br />C. APPLY HENRY J206 WET PATCH ROOF CEMENT IN BETS REFRIGERATION <br />PIPING, ELECTRICAL LINES, AND FOAM. LET CURE FOR FOUR HOURS. THIS <br />SHOULD SEAL ALL PIPING AND LINES IN THE PITCH POCKET, TO PREVENT <br />RAIN MATER FROM PENETRATING THROUGH. <br />P"6t] RAIN TIGHT PITCH POCKET <br />SPECIFICATION CONSTRUCTION DOTES FOR TRADES <br />6 I 1. OEM& C01 I Ae OR <br />A. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES. <br />ITEM NO.�REMOTE REFRIGEERAION PACKAGE B. GENERAL CONTRACTOR TO VERIFY AND CO-ORDINATE LOCATION OF REFRIGERATION RACK NTH REFRIGERATION CONTRACTOR TO SATISFY <br />THE REFRIGERATION PACKAGE SHALL BE PRE --ENGINEERED AND FACTORY ASSEMBLED LIMIT, TRADE NAME "REFRIG-O--PAK", AS MANUFACTURED LOCAL CODE REQUIREMENTS AND MAINTENANCE OF THE RACK. <br />VARIES AT SLOPE BY COOLTEC REFRIGERATION CORP.. 1250 E. FRANKLIN AVE., POMONA, CA 99766. PHONE: (909) 66562229, FAX. (909) 868-0777, C. GENERAL CONTRACTOR TO VERIFY REFRIGERATION LIME RUNS THRU TO ROOF QR MULTI -STORY BUILDING PRIOR TO CONSTRUCTION NTH <br />ROOF E-MAIL ADDRESS: solesocooltecrefrigeratlare.corn REFRIGERATION CONTRACTOR FOR ACCESSIBILITY. <br />i CONTRACTOR SHALL FURNISH AND INSTALL, WHERE SHOWN ON PLANS, (1) COOLTEC U.L> APPROVED "REFRIC- 0-PAK" AIR COOLED REMOTE D. GENERAL CONTRACTOR TO VERIFY ACCESS OF CHANE OR MECHANICAL LIFT NTH REFRIGERATION CONTRACTOR PRIOR TO CONSTR€1CT)ON <br />i REFRIGERATION PACKAGE, MODEI. R S-4 (IF REQUIRED). <br />DOUSED IN A WEATHER PROTECTED ENCLOSURE. THE FRAME, ENCLOSURE, AND PANELS SHALL BE FABRICATED OF GALVANIZED STEEL, . . WITH CONTROL PANEL, 208 VOLTS, 3 PHASE, 60 HERTZ. REFRIGERATION SYSTEM SHALL BE EGENERAL CONTRACTOR SHALL PREPARE AND WEATHER PROOF THE PLATFORM AND CURBED OPENINGS FOR REFRIGERATION I1DN PIPING AND <br />�-- <br />THE ENTIRE FRAME SHALL BE PRE -ASSEMBLED, WELDED, GLEAMED, AND PRIMED AND POWDER COATED EPDXY ENAMEL AND BAKED. ELECTRICAL CONDUIT. ROOF PAD TO BE CONSTRUCTED OF HEAVY DUTY STEEL FRAMING, AND THE FINISHED HEIGHT DICTATED PER <br />THE CONDENSER SHALL BE SECTIONAL. REMOVABLE, WITH RIFLED TUBE SLOTTED FINNED AND SHALL BE DESIGNED FOR 2O ETD. LOCALCODES. <br />CONDENSER FAN MOTORS SHALL BE MOUNTED ON THE TOP OF THE ENCLOSURE FOR BETTER HEAT DISCHARGE. F. PROVIDE SHEET METAL CAP WITH 2 HIGH PITCH POCKET COLLAR AND WATER TIGHT SOLDERED JOINTS. <br />G GENERAL CONTRACTOR TO ALLOW 3'-0" (36") OF CLEAR SPACE AROUND ROOF PAD FOR MAINTENANCE <br />REFRIGERATION LINE SEQUENCE 1. E�ERM�Ifl,NITS H. ALL COR~ DRILLING REQUIRED FOR REMOTEREFRIGERATION PIPING WORK BY THE REFRIGERATION CONTRACTOR, Is IN THE GENERAL P <br />CA <br />A. AIR-COOLED CONDENSING KNITS SHALL BE HERIaIATICfGLACIER SCROLL TYPE (CQPELAI�ID). EACH UNIT SHALL BE EQUIPPED WITH AND <br />SCOOP OF WORK. COORDINATE EXACT LOCATION AND NUMBER OF PENETRATIONS `NTH TIME REFRIGERATION CONTRACTOR <br />RIGH -LOW PRESSURE CONTROL, LIQUID LINE DRIER, SIGHT GLASS, HEAD PRESSURE CONTROL, TIME CLOCKS AND PUMP DOWN SOLENOIDS. ANY COMPLY E WITH ALL BUILDING <br />S REQUIREMENTS FOR BE RAY OF SLAB PRIOR TO WORK. <br />B. ALL COMPRESSOR UNITS SHALL BE NEW FACTORY ASSEMBLED TO OPERATE WITH THE REFRIGERANT SPECIFIED IN THE ENGINEERING I. ANY ATTACHMENT TO E3UILDING STRUCTURE FOR LOAM BEARING WEIGHT TO �3E PROVIDED AND REFRIGERATION <br />CO-ORDINATED BY GENERAL CONTRACTOR, <br />SUMMARY SHEET. REFRIGERANT R -404A SMALL BE USED ON ALL. COMMERCIAL TEMPERATURE UNITS AND LOW TEMPERATURE UNITS. J. GENERAL CONTRACTOR TO BACKFILL ALL PITCH POCKETS TO TOP WITH TAR OR PITCH AFTER REFRIGEr?ATION AND ELECTRICAL LINES <br />HAVE BEEN RUN. <br />REFRIGERATION I I� E I AT 11� I g1P� 2. REEFRIIGEERATION CONTRACTOR r r : z <br />..� . Cry t'.^, -i' <br />t ! t A. ALL REFRIGERANT LINES SHALL BE EXTENDED TO ONE SIDE OF THE PACKAGE IN A NEAT AND ORDERLY MANNER. SUCTION LINES MUST A. REFRIGERATION CONTRACTOR SHALL RUN ALL REFRIGERATION L3NES WHICH EXTEND DOWN THRU WALL(S) BEFORE WAL(S) ARE CLOSED <br />F57.0 P I II""" I ! � GCONNECTION SEQUENCE BE INSULATED WITH ARMAFLEX (1- THICK FOR LOW TEMP, 3,6'4" THICK FOR MEDIUM TEMP). UIQ MEN CONDUIT IS NOT PROVIDED. <br />B. ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH CLAMPS. B. REFRIGERATION CONTRACTOR TO SEAL BOTH ENDS OF CONDUIT NTH FOMOFIL AFTER ALL LINES HAVE BEEN RUN. 0 1 4 � I 6. . <br />C. SILVER SOLDER AND/OR SIL -FOS SHALL BE USED FOR ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT ACCEPTABLE. IF PULL. BOX(E5) ARE SPECIFIED, THEY MUST BE A MINIMUM 12-x 12". <br />D. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI. C. REFRIGERATION CONTRACTOR SMALL INSULATE ALL. REFRIGERATION SUCTION LINES. LA-� r ,AFTER THE CONDENSING UNIT AND COIL NAVE BEEN CONNECTED, THE BALANCE OF THE SYSTEM SHALL BE LEAKED TESTED WITH ALL D. REFRIGERATION CONTRACTOR SMALL VERIFY LOCATION OF BLOWER COILS) AND COMPRESSORS) FOR ALL„ REFRIGERATED AREAS. E r <br />VALVES OPENED. E. REFRIGERATION CONTRACTOR SHALL VERIFY LOCATION OF PITCH POCKET(S) FOR REFRIGERATION LINE PENETRATION THRU ROOF WITH <br />GENERAL CONTRACTOR. GENERAL CONTRACTOR TO INSTALL ALL PITCH POCKETS. <br />3. 9999ILQL-PAHEL F. CONTRACTOR SHALL USE ONLY CLEAN DEHYDRATED, SEALED REFRIGERATION GRADE A.C.R. COPPER TUBING OR TYPE "Le. <br />A. THE PACKEAGE SMALL HAVE A FACTORY MOUNTED AND PRE -WIRED CONTROL PANEL COMPLETE WITH MAIN FUSED DISCONNECT. USE ONLY LONG RADIUS ELBOWS TO REDUCE FLOW RESISTANCE AND LINE BREAKAGE. <br />COMPRESSOR CIRCUIT BREAKERS, �RDNlAOLLdDTHE RLSTPAORPY€PRCORN1O G. SII�E{AIFLRREFRIGERANT PIPING. SOFT SOLDER I5 NOT ACCEPTABLE, <br />REFRIGERATION CONTRACTOR TO CAPITAL ENGINEERING <br />B. A�FMEpA P?ApLEhdE 1MtLRS�BE USED <br />SUPPLY ANIS MOUNT (4) 5/16-0 CONTROL AND DEFROST HEATER BETWEEN AND THE DEFROST CLOCK AND THE REFRIGERATION FIXTURES, ALL IN ACCORDANCE WITH H. ALL PIPING MUST BE SUPPORTED WTH HANGERS THAT CAN WITHSTAND THE COMBINED WEIGHT OF TUBING, INSULATION, VALVES, ANY CONSULTANTS, INC. <br />MOUNTING BOLTS WITH LOCK THE WIRING DIAGRAM ARID PER LOCAL CODES. FLUID IN THE TUBING. 11020 SUN CENTER Da. STe.100 <br />I. USE DRY HYDROGEN IN TIME COPPER TUBING DURING BRAZING TO PREVENT FORMATION OF COPPER OXIDES. LIQUID AND SUCTION LINES RANCHO COt DOVA, CALIFORNIA <br />WASHERS AND HEX NUTS4. JAEEr 9AV= MUST BE FREE TO EXPAND INDEPENDENTLY OF EACH OTHER. DO NOT EXCEED 100 FEET WITHOUT A CHANGE IN DIRECTION OR AN 916.851.35001rwn.capital-engineering.00m <br />TYPICAL AT FOUR PLACES COILS REFRIGERATION AND ELECTRICAL A. EACH SYSTEM AND EVAPORATOR IS SKIPPED UNDER NITROGEN PRESSURE. OFFSET, PLAN PROPER PITCHING, EXPANSION ALLOWANCE, AND P -TRAPS AT THE BASE OF ALL SUCTION RISERS AND AT EVERY 15 FEET ANO 150605.00 <br />TO PENETRATE UP THRU CEILING USE CAUTION AND EXERCISE SAFETY AT ALL TIMES WHEN PREPARING FOR FINAL HOOK-UP, OF EVERY VERTICAL RISE. INSTALL SERVICE VALVES AT SEVERAL LOCATIONS FOR EASE OF MAINTENANCE. THESE VALVES MUST BE F00089WE DESIGNER PaC=T Na <br />(MINIMUM) -0--- 12" MINIMUM APPROVED FOR 450 PSE WORKING PRESSURE. M3M qp 7W FOODSENIM 000.LTAWS <br />S. J. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI WITH ALL VALVES OPEN AND HELD FOR 12 HOURS >t Y t T9444TIOML <br />1B" MAXI UM ELECTRONIC LEAK DETECTORS SHALL BE USED TO LOCATE ALL LEAKS. <br />� A. EVAPORATIVE COILS SHALL BE DIRECT EXPANSION TYPE, FABRICATED OF COPPER TUBES WITH ALUMINUM FINS. ALL EVAPORATIVE COILS K. COMPLETE SYSTEM SHALL BE EVACUATED TO 50f5 MICRONS WITH VACUUM PUMP BEFORE CHARGING TIME SYSTEM. <br />-- PENETRATION THRU WALK-IN BOX'S SHALL BE PROVIDED WITH SOLENOID VALVE, THERMOSTATIC EXPANSION VALVE, AND ELECTRONIC THERMOSTAT, PIPED AND WIRED TO THE L. ONCE SYSTEM I& CHARGED ANY DUNNING, ADJUST ALL CONTROLS __ VACUUM <br />INCLUDING PRESSURE CONTROLS, EXPANSION VALVES, Copyright @ 2013 Rainfor Grab Architects. All rights reserved. Reproduction of mese plans, either in whole or in part, including any forrrl <br />CEILING TO BE SE=ALED BY JUNCTION BOX FOR POSITIVE PUMP DIED of p y prior pel�nission, is strictly prohibited. <br />B. EVAPORATIVE COILS SHALL BE EQUIPPED WITH ENERGY SAVING "EC" MOTORS. THERMOSTATS, ANIS TIME CLOCKS.. RETURN AFTER 24 HOURS TO VERIFY PROPER OPERATION OF SYSTEMS. copying and/or reparati�3n of derivative works thereof, for an reason without rlor written <br />REFRIGERATION CONTRACTOR M. REFRIGERATION CONTRACTOR TO PROVIDE AND INSTALL. DRAIN LINE HEATER NTH INSULATION IN FREEZER TO BE CONNECTED BY <br />ELECTRICAL CONTRACTOR. <br />N. REFRIGERANT SUCTION LINES OUTSIDE OF REFRIGERATED COMPARTMENTS, NOT RUN IN CONDUIT, SHALL BE INSULATED BACK TO <br />LOGEJEN REQUIRED AT ALL SUCTION COMPRESSOR WITH ARMSTRONG ALMA -FLEX AP -25/50 FOAMED PLASTIC INSULATION OR EQUAL IN ACCORD WITH DIRECTION OF THE <br />LINES EXITING OUT FROM REFRIGERATED MANUFACTURER. MINIMUM THICKNESS SHALL BE 3/4 INCH FOR COMMERCIAL TEMPERATURE AND 1.0 INCH FOR LOW TEMPERATURE. <br />O. FILL ROOF REFRIGERATION AND ELECTRICAL PITCH POCKETS WITH FOAM ANY SEALANT. <br />UNITS AND FIXTURES P. REFRIGERATION CONTRACTOR TO SEAL ALL REFRIGERATION LINE PENETRATIONS MADE THRU WALK-IN COOLERS/FREEZERS, AND <br />�_,.,,,�„„,,., REFRIGERATED BASE SECTIONS OF° COUNTERS. <br />WALK-IN BOX'S NOTE: 3. ELECDTFtICDAL Cf9NTRAM APPI<UVAL <br />EACH DRAIN LINE A. ELECTRICAL CONTRACTOR TO PROVIDE MAIN TOWER FOR THE REFRIGERATION PACKAGE AND CONNECT CONTROL AND DEFROST SYSTEMS. <br />CEILINGMAN�°ECA UNIFIED SCHOOL DISTRICTDISTRICT�AIR FLOW �1-- 0011.TO RUN SEPERATELY B. ELECTRICAL CONTRACTOR TO PROVIDE S -WIRE COLOR -CODED SERVICE FROM THE TIME CLOCK AT THE REFRIGERATION SYSTEM. <br />C. ELECTRICAL CONTRACTOR TO CONNECT DRAIN -LINE BEATER IN 'TETE FREEZER. <br />D, ALL ELECTRICAL WIRING AND INSTALLATION SHALL BE ACCORDANCE NTH THE WIRING DIAGRAM AND PER LOCAL CODES. DATE <br />3/4" NPT DRAIN E. IF CONTRACTED, ELECTRICAL CONTRACTOR TO INSTALL ALL CONDUITS FOR REFRIGERATION LINES IN WALLS, PRIOR TO WALLS ARE <br />DRAIN LINE TO EXITMAXIMUM DRAIN PENT: TRA11ON THRU WALK-IN CLOSED UP. ALL PULL BOXES MUST BE A MINIMUM OF 12"x 12". <br />( BOX'S MALL TO BE SEALED 4. LINCOLN E.S. �CAFETERIA <br />45` AT BACK OF COIL, (MINIMUM BOX'S <br />PLUMBING CONTRACTOR TO PROVIDE TYPE "M" COPPER DRAIN LINES FOR WALK-IN REFRIGERATOR AND FREEZER, EACH WITH A COPPER <br />1%2" DOWN PER FOOTS DRAIN COPPER DRAIN LINE BY J®BSITE UNION FITTING MOUNTED UNDERNEATH THE COIL (FOR DISCONNECTING AND SERVICING PURPOSES), WITi'I THE DRAIN LINE PITCH DAWN CLASSROOM MODERNIZATION, <br />LINE TO EXIT FROM FREEZER PLUMBER AT A MAXIMUM 45' ANGLE, AND PENETRATE OUT OF THE WALK-IN BOX AT THE NEAREST LOCATION AS POSSIBLE. THE DRAIN LINE TO <br />Y AL i� -fI�I Oil ATEARLIEST PITCHED 1/2 INCH PER FOOT OF RUN. IN FREEZER, HEATED DRAIN LINE MUST BE INSULATED TO PREVENT FREEZING. TRAP DRAIN LIMES <br />POSSIBLE DISTANCE. <br />MINIMUM 3 f 4" SPACE <br />OUTSIDE DR IN REFINE AT RATED SPACE TO AVOID ENTRANCE N OF WARM ANY MOISTNT AIS, INCREMENT � .CAFETERIA <br />ANY DRAIN LINE ATTACHED TO WALL OF THE WALK-IN -II�i CQX IultlST BE tOiJIVTEY MINIMUM 3/4 AWAY (GAP) FOR CLEANING PURPOSES. <br />REQUIRED FOR CLEANING B. CONTRACTOR TO PROVIDE INDIVIDUAL. DRAIN LINE FOR EACH EVAPORATOR UNLESS OTHERWISE CALLED FOR IN THE PLANS, <br />JOBSITE PLUMBER TO CLAMP AND C. ALL GINGPLUMBING INSTALLATION SHALL BE IN ACCORDANCE WITH LOCAL CODES. MANTECA <br />UNIFIED <br />SCHOOL DISTRICT <br />MWUI'QI ON D, PLUMBING CONTRACTOR TO SUPPLY ANY MOUNT UNION FITTING AT EACH WALK-IN BOX EVAP BLOWER COIL"S DRAIN LINE FOR SERVICING <br />DRAIN LINE TO BE SECURE DRAIN LINE IN PLACE PURPOSES. <br />SUPPLIE=D AND INSTALLED LINCOLNCALIFORNIA <br />BY ,uzBSITE PLUMBER `P' TRAP BY SITE PLUMBER <br />WALK-IN BOXyS <br />INSULATED WALL----'-. PROVIDED AIR GAF' <br />WALK-IN BOX'S FLOOR (SPACING) BETWEEN DRAIN <br />RECEPTACLE AND DRAIN <br />LINE <br />DRAIN RECEPTOR, FLOOR <br />SINK, ETC. <br />REFER TO 2/FS4.0.0 FOR LOCATION <br />PROJECT NAME. <br />�K■T�7 � i �■� <br />Vi <br />IMIr► r s. <br />"PRODUCTION DEAD TIME: <br />4--6 WEEKS AFTER RECEIPT <br />OF APPROVED DRAWINGS AND <br />PURCHASE ORDER. <br />SEND APPROVED DRAWING TO <br />"KATHERINE SANCHEZ" <br />APPROVE BY: --- ............:..W.--------- <br />ISATE.._.....__�,.�..._�.._...�..�...........a..�,...........�......_..� <br />DRAWN AMD <br />NO <br />Revision AMID 15-1207 <br />CHECKED DATE <br />AMD 06-26-15 <br />SCALE SHEET <br />As indicated <br />rr, , <br />AI•1:3 9 <br />"r-41111 101 VIE <br />1 LOIN <br />TEMP <br />AT LOVA TEMP UNITS (FREEZERS) iI COIL <br />ONLY ELECTRICAL CONTRACTOR TO <br />MOUNT ELECTRIC HEATER CABLE <br />AROUND DRAIN LINE. CABLE TO BE <br />SPIRALED AND TAPED M DRAIN LINE. --- . <br />COPPER UNION ON DRAIN LIME <br />MINIMUM 1" THICK ARMAFLEX <br />INSULATION AROUND FREEZER COIL'S <br />DRAIN LINE AND HEATER CABLE <br />REFER TO 2/FS4.0.0 FOR LOCATION <br />T'Y P I C A E,. DETAIL AT FREEZER <br />P'°�'7. Q 1AIA L. IC` I i�I � � � h•I I� E N � A'r E C3 R A I N L I I'eI � <br />62" <br />12" <br />F _ _ �1T_CH I_0CKE­r 0P N1n�G_F_0 �.. <br />REFRIGERATION LINES <br />-OUTLINE OF <br />r I REFRIGERATION RACK <br />6 <br />0 PITCH POCKET OPENING FOR 4" <br />ELECTRICAL LINES - .,.,. - _._.._. - - - � <br />4% 6m <br />6eq <br />" <br />PLAN VIEW OF 56"x 62" ROOF PLATFORM <br />Te <br />! l '. <br />-# T <br />i <br />MAIN FUSIBLE <br />DISCONNECT - <br />REFRIGERATION LINES ` <br />TO RUN INSIDE OF <br />RACK AT THIS END -----.,,M <br />HEAVY DUTY <br />PLATFORM BY GENERAL <br />CONTRACTOR <br />ROOF---\ <br />COOLTEC ENGINEERING � lJ ISA �� POWER SuPP�.Y:2O8�t/3PH�`6OHZ FUSE SIZE: 30 AMP <br />CONNECTED LOAD=23.1 AMP MINIMUM AZviPACITY= 25.3AMP <br />FIXTURES COMPRESSORS UNIT COOLER SYSTEM LINE SIZE (O.D.) AND RUN ACCESSORIES (SEE SUPPLY CODE *} <br />TEMP(F) a RATING 0 60 HZ TOTAL PLOWER � � � C> ,- ,? <br />MODEL 208V 60 Hz w ac � 0 c � es 5 � 0 <br />C2 � � � � 6O Hz RATING EwIGH. � � � � � � � c� � � 0 � � � a� � ups t,a TIME CLOCK <br />DESCRIPTION MODEL 95 F c� 1 FAN E�IEATER is ISI a�I 0 � � � �- � !- '� � � � � w �. x <br />�` RLA V E'Ii tz RLA V FLA PH AMPS PH c 0 % ►' > <br />RS -4 CONDENSER FAN <br />MOTORS <br />A 3 WALK-IN FREEZER m 10 p-20 404A 16 ZF09K4E-TE"6 3.0 8.7 208 3 11.1 E 3A 1 LET09013EK 1.0 2087.8 208 1 9.7 3 5 7/'8 3/S 100 F" F F' F F F' E= DT XB -240 <br />CONDENSER FAN MOTOR 1/2 3.6 206 1 3.6 1 <br />B 4 WALK-IN COOLER 35 25 404A 16 ZS09KAE-TF5 1.€i 7.2 208 3 12..5 G 4A 1 ADT104AEK 1.6 115 7.2 3 S 7/8 3/€� 1OC} F F F F F F MIL -72A <br />CONDENSER FAN MOTOR 1/2 3.6 206 1 3.6 1 <br />MODEL N E ELECTRIC (TIMED) E3 BRANCH * F - FACTORYSUPPLY INSTALLEDG GRAVITY (TIMES)) M MAIN L - LOOSE (FIELD INSTALLED) <br />0I PS -4 H HOT GAS (TIMED) M - MANUFACTURER EQUIPPED <br />O OFF CYCLE (TEMP. S SINGLE R REFRIGERATION CONTRACTOR <br />C UOL US LISTEED �- ALL SYSTEMS ENGINEERED WITH R -404A REFRIGERANT'. ANY EASES/COILS NOT SUPPLIED BY COOLTEC MUST BE EQUIPPED WITH R -404A EXPANSION `SALVE=S. <br />DOTE: �- REFRIGERATION PIPE SIZES ARE BASED ON A MAXIMUM LINE RUN UP TO 100 EQUIVALENT FET FOR LIQUID AND SUCTION LINES. <br />CONDENSING UNIT VERIFY LINE LENGTHS WITH JOS SITE CONDITIONS AND LINE ROUTING AT INDIVIDUAL INSTALLATIONS. <br />- "COMPRESSOR MOTOR PROTECTED UNDER PRIMARY SINGLE PHASE PROTECTION" <br />33SZ FILE SA32027 -- EFFECTIVE JANUARY 1. 2009, ALL WALK-IN COOLER AND FREEZE EVAPORATIVE COILS INSTALLED IN THE U.S.A. SHALL BE SUPPLIED WITH ENERGY <br />EFFICIENT (EC) MOTORS BASED ON THE FEDERAL ENERGY INDEPENDENCE AND SECURITY ACT (HR -6). <br />2" HIGH PITCH POCKET COLLAR <br />18 GA. GALVANIZED STEEL SHEET HENRY #208 WET PATCH <br />METAL CAF, ROOF CEMENT <br />ROORNG <br />311 THICK MATERIAL TO <br />PLYWOOD SiiB -TOP I RUN UP UNDER <br />36" 36" <br />HEAVY GAUGE CAP <br />CLEAR CLEAR CONTINUOUS <br />STEEL FRAMING COVING <br />MAXIMUM 16" <br />62" PLATFORM <br />O.C. SPACING , ROOF <br />12" 48" RACK 2" <br />ROOF <br />56"x W c 6" HIGH PLATFORM 4" STRUCTURE r� <br />Fin <br />2" HIGH PITCH POCKET <br />COLLAR FOR <br />ELECTIRICAL <br />CARDBOARD WITH <br />DUCT TAPE TO <br />HOLD FOAM IN PLACE <br />PLATFORMI <br />MINIMUM _ <br />f:" HIGH 1= <br />:m 2" HIGH FLITCH <br />POCKET COLLAR <br />ROOF -- FOR REFRIGERATION <br />TRIPLE EXPANDABLE <br />FOAM INSULATION <br />INSTRUCTIONS FOR REFRIGERATION CONTRACTOR <br />A. TAPE CARDBOARD AT THE BOTTOM OF EACH PITCH POCKET OPENING <br />AS SHOWN. <br />B. AT THE TOP OF THE PITCH POCKET OPENING, FILL IN WITH TRIPLE <br />EXPANDABLE FOAM INSULATION (DOW CHEMICAL -GREAT ST'UF'F INSULATING <br />FOAM), AND LET FOAM CURE FOR ONE HOUR. <br />C. APPLY HENRY J206 WET PATCH ROOF CEMENT IN BETS REFRIGERATION <br />PIPING, ELECTRICAL LINES, AND FOAM. LET CURE FOR FOUR HOURS. THIS <br />SHOULD SEAL ALL PIPING AND LINES IN THE PITCH POCKET, TO PREVENT <br />RAIN MATER FROM PENETRATING THROUGH. <br />P"6t] RAIN TIGHT PITCH POCKET <br />SPECIFICATION CONSTRUCTION DOTES FOR TRADES <br />6 I 1. OEM& C01 I Ae OR <br />A. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES. <br />ITEM NO.�REMOTE REFRIGEERAION PACKAGE B. GENERAL CONTRACTOR TO VERIFY AND CO-ORDINATE LOCATION OF REFRIGERATION RACK NTH REFRIGERATION CONTRACTOR TO SATISFY <br />THE REFRIGERATION PACKAGE SHALL BE PRE --ENGINEERED AND FACTORY ASSEMBLED LIMIT, TRADE NAME "REFRIG-O--PAK", AS MANUFACTURED LOCAL CODE REQUIREMENTS AND MAINTENANCE OF THE RACK. <br />VARIES AT SLOPE BY COOLTEC REFRIGERATION CORP.. 1250 E. FRANKLIN AVE., POMONA, CA 99766. PHONE: (909) 66562229, FAX. (909) 868-0777, C. GENERAL CONTRACTOR TO VERIFY REFRIGERATION LIME RUNS THRU TO ROOF QR MULTI -STORY BUILDING PRIOR TO CONSTRUCTION NTH <br />ROOF E-MAIL ADDRESS: solesocooltecrefrigeratlare.corn REFRIGERATION CONTRACTOR FOR ACCESSIBILITY. <br />i CONTRACTOR SHALL FURNISH AND INSTALL, WHERE SHOWN ON PLANS, (1) COOLTEC U.L> APPROVED "REFRIC- 0-PAK" AIR COOLED REMOTE D. GENERAL CONTRACTOR TO VERIFY ACCESS OF CHANE OR MECHANICAL LIFT NTH REFRIGERATION CONTRACTOR PRIOR TO CONSTR€1CT)ON <br />i REFRIGERATION PACKAGE, MODEI. R S-4 (IF REQUIRED). <br />DOUSED IN A WEATHER PROTECTED ENCLOSURE. THE FRAME, ENCLOSURE, AND PANELS SHALL BE FABRICATED OF GALVANIZED STEEL, . . WITH CONTROL PANEL, 208 VOLTS, 3 PHASE, 60 HERTZ. REFRIGERATION SYSTEM SHALL BE EGENERAL CONTRACTOR SHALL PREPARE AND WEATHER PROOF THE PLATFORM AND CURBED OPENINGS FOR REFRIGERATION I1DN PIPING AND <br />�-- <br />THE ENTIRE FRAME SHALL BE PRE -ASSEMBLED, WELDED, GLEAMED, AND PRIMED AND POWDER COATED EPDXY ENAMEL AND BAKED. ELECTRICAL CONDUIT. ROOF PAD TO BE CONSTRUCTED OF HEAVY DUTY STEEL FRAMING, AND THE FINISHED HEIGHT DICTATED PER <br />THE CONDENSER SHALL BE SECTIONAL. REMOVABLE, WITH RIFLED TUBE SLOTTED FINNED AND SHALL BE DESIGNED FOR 2O ETD. LOCALCODES. <br />CONDENSER FAN MOTORS SHALL BE MOUNTED ON THE TOP OF THE ENCLOSURE FOR BETTER HEAT DISCHARGE. F. PROVIDE SHEET METAL CAP WITH 2 HIGH PITCH POCKET COLLAR AND WATER TIGHT SOLDERED JOINTS. <br />G GENERAL CONTRACTOR TO ALLOW 3'-0" (36") OF CLEAR SPACE AROUND ROOF PAD FOR MAINTENANCE <br />REFRIGERATION LINE SEQUENCE 1. E�ERM�Ifl,NITS H. ALL COR~ DRILLING REQUIRED FOR REMOTEREFRIGERATION PIPING WORK BY THE REFRIGERATION CONTRACTOR, Is IN THE GENERAL P <br />CA <br />A. AIR-COOLED CONDENSING KNITS SHALL BE HERIaIATICfGLACIER SCROLL TYPE (CQPELAI�ID). EACH UNIT SHALL BE EQUIPPED WITH AND <br />SCOOP OF WORK. COORDINATE EXACT LOCATION AND NUMBER OF PENETRATIONS `NTH TIME REFRIGERATION CONTRACTOR <br />RIGH -LOW PRESSURE CONTROL, LIQUID LINE DRIER, SIGHT GLASS, HEAD PRESSURE CONTROL, TIME CLOCKS AND PUMP DOWN SOLENOIDS. ANY COMPLY E WITH ALL BUILDING <br />S REQUIREMENTS FOR BE RAY OF SLAB PRIOR TO WORK. <br />B. ALL COMPRESSOR UNITS SHALL BE NEW FACTORY ASSEMBLED TO OPERATE WITH THE REFRIGERANT SPECIFIED IN THE ENGINEERING I. ANY ATTACHMENT TO E3UILDING STRUCTURE FOR LOAM BEARING WEIGHT TO �3E PROVIDED AND REFRIGERATION <br />CO-ORDINATED BY GENERAL CONTRACTOR, <br />SUMMARY SHEET. REFRIGERANT R -404A SMALL BE USED ON ALL. COMMERCIAL TEMPERATURE UNITS AND LOW TEMPERATURE UNITS. J. GENERAL CONTRACTOR TO BACKFILL ALL PITCH POCKETS TO TOP WITH TAR OR PITCH AFTER REFRIGEr?ATION AND ELECTRICAL LINES <br />HAVE BEEN RUN. <br />REFRIGERATION I I� E I AT 11� I g1P� 2. REEFRIIGEERATION CONTRACTOR r r : z <br />..� . Cry t'.^, -i' <br />t ! t A. ALL REFRIGERANT LINES SHALL BE EXTENDED TO ONE SIDE OF THE PACKAGE IN A NEAT AND ORDERLY MANNER. SUCTION LINES MUST A. REFRIGERATION CONTRACTOR SHALL RUN ALL REFRIGERATION L3NES WHICH EXTEND DOWN THRU WALL(S) BEFORE WAL(S) ARE CLOSED <br />F57.0 P I II""" I ! � GCONNECTION SEQUENCE BE INSULATED WITH ARMAFLEX (1- THICK FOR LOW TEMP, 3,6'4" THICK FOR MEDIUM TEMP). UIQ MEN CONDUIT IS NOT PROVIDED. <br />B. ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH CLAMPS. B. REFRIGERATION CONTRACTOR TO SEAL BOTH ENDS OF CONDUIT NTH FOMOFIL AFTER ALL LINES HAVE BEEN RUN. 0 1 4 � I 6. . <br />C. SILVER SOLDER AND/OR SIL -FOS SHALL BE USED FOR ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT ACCEPTABLE. IF PULL. BOX(E5) ARE SPECIFIED, THEY MUST BE A MINIMUM 12-x 12". <br />D. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI. C. REFRIGERATION CONTRACTOR SMALL INSULATE ALL. REFRIGERATION SUCTION LINES. LA-� r ,AFTER THE CONDENSING UNIT AND COIL NAVE BEEN CONNECTED, THE BALANCE OF THE SYSTEM SHALL BE LEAKED TESTED WITH ALL D. REFRIGERATION CONTRACTOR SMALL VERIFY LOCATION OF BLOWER COILS) AND COMPRESSORS) FOR ALL„ REFRIGERATED AREAS. E r <br />VALVES OPENED. E. REFRIGERATION CONTRACTOR SHALL VERIFY LOCATION OF PITCH POCKET(S) FOR REFRIGERATION LINE PENETRATION THRU ROOF WITH <br />GENERAL CONTRACTOR. GENERAL CONTRACTOR TO INSTALL ALL PITCH POCKETS. <br />3. 9999ILQL-PAHEL F. CONTRACTOR SHALL USE ONLY CLEAN DEHYDRATED, SEALED REFRIGERATION GRADE A.C.R. COPPER TUBING OR TYPE "Le. <br />A. THE PACKEAGE SMALL HAVE A FACTORY MOUNTED AND PRE -WIRED CONTROL PANEL COMPLETE WITH MAIN FUSED DISCONNECT. USE ONLY LONG RADIUS ELBOWS TO REDUCE FLOW RESISTANCE AND LINE BREAKAGE. <br />COMPRESSOR CIRCUIT BREAKERS, �RDNlAOLLdDTHE RLSTPAORPY€PRCORN1O G. SII�E{AIFLRREFRIGERANT PIPING. SOFT SOLDER I5 NOT ACCEPTABLE, <br />REFRIGERATION CONTRACTOR TO CAPITAL ENGINEERING <br />B. A�FMEpA P?ApLEhdE 1MtLRS�BE USED <br />SUPPLY ANIS MOUNT (4) 5/16-0 CONTROL AND DEFROST HEATER BETWEEN AND THE DEFROST CLOCK AND THE REFRIGERATION FIXTURES, ALL IN ACCORDANCE WITH H. ALL PIPING MUST BE SUPPORTED WTH HANGERS THAT CAN WITHSTAND THE COMBINED WEIGHT OF TUBING, INSULATION, VALVES, ANY CONSULTANTS, INC. <br />MOUNTING BOLTS WITH LOCK THE WIRING DIAGRAM ARID PER LOCAL CODES. FLUID IN THE TUBING. 11020 SUN CENTER Da. STe.100 <br />I. USE DRY HYDROGEN IN TIME COPPER TUBING DURING BRAZING TO PREVENT FORMATION OF COPPER OXIDES. LIQUID AND SUCTION LINES RANCHO COt DOVA, CALIFORNIA <br />WASHERS AND HEX NUTS4. JAEEr 9AV= MUST BE FREE TO EXPAND INDEPENDENTLY OF EACH OTHER. DO NOT EXCEED 100 FEET WITHOUT A CHANGE IN DIRECTION OR AN 916.851.35001rwn.capital-engineering.00m <br />TYPICAL AT FOUR PLACES COILS REFRIGERATION AND ELECTRICAL A. EACH SYSTEM AND EVAPORATOR IS SKIPPED UNDER NITROGEN PRESSURE. OFFSET, PLAN PROPER PITCHING, EXPANSION ALLOWANCE, AND P -TRAPS AT THE BASE OF ALL SUCTION RISERS AND AT EVERY 15 FEET ANO 150605.00 <br />TO PENETRATE UP THRU CEILING USE CAUTION AND EXERCISE SAFETY AT ALL TIMES WHEN PREPARING FOR FINAL HOOK-UP, OF EVERY VERTICAL RISE. INSTALL SERVICE VALVES AT SEVERAL LOCATIONS FOR EASE OF MAINTENANCE. THESE VALVES MUST BE F00089WE DESIGNER PaC=T Na <br />(MINIMUM) -0--- 12" MINIMUM APPROVED FOR 450 PSE WORKING PRESSURE. M3M qp 7W FOODSENIM 000.LTAWS <br />S. J. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI WITH ALL VALVES OPEN AND HELD FOR 12 HOURS >t Y t T9444TIOML <br />1B" MAXI UM ELECTRONIC LEAK DETECTORS SHALL BE USED TO LOCATE ALL LEAKS. <br />� A. EVAPORATIVE COILS SHALL BE DIRECT EXPANSION TYPE, FABRICATED OF COPPER TUBES WITH ALUMINUM FINS. ALL EVAPORATIVE COILS K. COMPLETE SYSTEM SHALL BE EVACUATED TO 50f5 MICRONS WITH VACUUM PUMP BEFORE CHARGING TIME SYSTEM. <br />-- PENETRATION THRU WALK-IN BOX'S SHALL BE PROVIDED WITH SOLENOID VALVE, THERMOSTATIC EXPANSION VALVE, AND ELECTRONIC THERMOSTAT, PIPED AND WIRED TO THE L. ONCE SYSTEM I& CHARGED ANY DUNNING, ADJUST ALL CONTROLS __ VACUUM <br />INCLUDING PRESSURE CONTROLS, EXPANSION VALVES, Copyright @ 2013 Rainfor Grab Architects. All rights reserved. Reproduction of mese plans, either in whole or in part, including any forrrl <br />CEILING TO BE SE=ALED BY JUNCTION BOX FOR POSITIVE PUMP DIED of p y prior pel�nission, is strictly prohibited. <br />B. EVAPORATIVE COILS SHALL BE EQUIPPED WITH ENERGY SAVING "EC" MOTORS. THERMOSTATS, ANIS TIME CLOCKS.. RETURN AFTER 24 HOURS TO VERIFY PROPER OPERATION OF SYSTEMS. copying and/or reparati�3n of derivative works thereof, for an reason without rlor written <br />REFRIGERATION CONTRACTOR M. REFRIGERATION CONTRACTOR TO PROVIDE AND INSTALL. DRAIN LINE HEATER NTH INSULATION IN FREEZER TO BE CONNECTED BY <br />ELECTRICAL CONTRACTOR. <br />N. REFRIGERANT SUCTION LINES OUTSIDE OF REFRIGERATED COMPARTMENTS, NOT RUN IN CONDUIT, SHALL BE INSULATED BACK TO <br />LOGEJEN REQUIRED AT ALL SUCTION COMPRESSOR WITH ARMSTRONG ALMA -FLEX AP -25/50 FOAMED PLASTIC INSULATION OR EQUAL IN ACCORD WITH DIRECTION OF THE <br />LINES EXITING OUT FROM REFRIGERATED MANUFACTURER. MINIMUM THICKNESS SHALL BE 3/4 INCH FOR COMMERCIAL TEMPERATURE AND 1.0 INCH FOR LOW TEMPERATURE. <br />O. FILL ROOF REFRIGERATION AND ELECTRICAL PITCH POCKETS WITH FOAM ANY SEALANT. <br />UNITS AND FIXTURES P. REFRIGERATION CONTRACTOR TO SEAL ALL REFRIGERATION LINE PENETRATIONS MADE THRU WALK-IN COOLERS/FREEZERS, AND <br />�_,.,,,�„„,,., REFRIGERATED BASE SECTIONS OF° COUNTERS. <br />WALK-IN BOX'S NOTE: 3. ELECDTFtICDAL Cf9NTRAM APPI<UVAL <br />EACH DRAIN LINE A. ELECTRICAL CONTRACTOR TO PROVIDE MAIN TOWER FOR THE REFRIGERATION PACKAGE AND CONNECT CONTROL AND DEFROST SYSTEMS. <br />CEILINGMAN�°ECA UNIFIED SCHOOL DISTRICTDISTRICT�AIR FLOW �1-- 0011.TO RUN SEPERATELY B. ELECTRICAL CONTRACTOR TO PROVIDE S -WIRE COLOR -CODED SERVICE FROM THE TIME CLOCK AT THE REFRIGERATION SYSTEM. <br />C. ELECTRICAL CONTRACTOR TO CONNECT DRAIN -LINE BEATER IN 'TETE FREEZER. <br />D, ALL ELECTRICAL WIRING AND INSTALLATION SHALL BE ACCORDANCE NTH THE WIRING DIAGRAM AND PER LOCAL CODES. DATE <br />3/4" NPT DRAIN E. IF CONTRACTED, ELECTRICAL CONTRACTOR TO INSTALL ALL CONDUITS FOR REFRIGERATION LINES IN WALLS, PRIOR TO WALLS ARE <br />DRAIN LINE TO EXITMAXIMUM DRAIN PENT: TRA11ON THRU WALK-IN CLOSED UP. ALL PULL BOXES MUST BE A MINIMUM OF 12"x 12". <br />( BOX'S MALL TO BE SEALED 4. LINCOLN E.S. �CAFETERIA <br />45` AT BACK OF COIL, (MINIMUM BOX'S <br />PLUMBING CONTRACTOR TO PROVIDE TYPE "M" COPPER DRAIN LINES FOR WALK-IN REFRIGERATOR AND FREEZER, EACH WITH A COPPER <br />1%2" DOWN PER FOOTS DRAIN COPPER DRAIN LINE BY J®BSITE UNION FITTING MOUNTED UNDERNEATH THE COIL (FOR DISCONNECTING AND SERVICING PURPOSES), WITi'I THE DRAIN LINE PITCH DAWN CLASSROOM MODERNIZATION, <br />LINE TO EXIT FROM FREEZER PLUMBER AT A MAXIMUM 45' ANGLE, AND PENETRATE OUT OF THE WALK-IN BOX AT THE NEAREST LOCATION AS POSSIBLE. THE DRAIN LINE TO <br />Y AL i� -fI�I Oil ATEARLIEST PITCHED 1/2 INCH PER FOOT OF RUN. IN FREEZER, HEATED DRAIN LINE MUST BE INSULATED TO PREVENT FREEZING. TRAP DRAIN LIMES <br />POSSIBLE DISTANCE. <br />MINIMUM 3 f 4" SPACE <br />OUTSIDE DR IN REFINE AT RATED SPACE TO AVOID ENTRANCE N OF WARM ANY MOISTNT AIS, INCREMENT � .CAFETERIA <br />ANY DRAIN LINE ATTACHED TO WALL OF THE WALK-IN -II�i CQX IultlST BE tOiJIVTEY MINIMUM 3/4 AWAY (GAP) FOR CLEANING PURPOSES. <br />REQUIRED FOR CLEANING B. CONTRACTOR TO PROVIDE INDIVIDUAL. DRAIN LINE FOR EACH EVAPORATOR UNLESS OTHERWISE CALLED FOR IN THE PLANS, <br />JOBSITE PLUMBER TO CLAMP AND C. ALL GINGPLUMBING INSTALLATION SHALL BE IN ACCORDANCE WITH LOCAL CODES. MANTECA <br />UNIFIED <br />SCHOOL DISTRICT <br />MWUI'QI ON D, PLUMBING CONTRACTOR TO SUPPLY ANY MOUNT UNION FITTING AT EACH WALK-IN BOX EVAP BLOWER COIL"S DRAIN LINE FOR SERVICING <br />DRAIN LINE TO BE SECURE DRAIN LINE IN PLACE PURPOSES. <br />SUPPLIE=D AND INSTALLED LINCOLNCALIFORNIA <br />BY ,uzBSITE PLUMBER `P' TRAP BY SITE PLUMBER <br />WALK-IN BOXyS <br />INSULATED WALL----'-. PROVIDED AIR GAF' <br />WALK-IN BOX'S FLOOR (SPACING) BETWEEN DRAIN <br />RECEPTACLE AND DRAIN <br />LINE <br />DRAIN RECEPTOR, FLOOR <br />SINK, ETC. <br />REFER TO 2/FS4.0.0 FOR LOCATION <br />PROJECT NAME. <br />�K■T�7 � i �■� <br />Vi <br />IMIr► r s. <br />"PRODUCTION DEAD TIME: <br />4--6 WEEKS AFTER RECEIPT <br />OF APPROVED DRAWINGS AND <br />PURCHASE ORDER. <br />SEND APPROVED DRAWING TO <br />"KATHERINE SANCHEZ" <br />APPROVE BY: --- ............:..W.--------- <br />ISATE.._.....__�,.�..._�.._...�..�...........a..�,...........�......_..� <br />DRAWN AMD <br />NO <br />Revision AMID 15-1207 <br />CHECKED DATE <br />AMD 06-26-15 <br />SCALE SHEET <br />As indicated <br />