My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disabled Veteran Business Enterprise 11 <br />June 2007 <br />Section 6 <br />Role of Construction Management <br />School Districts <br />Some school districts choose to contract with a Construction Management firm (CM) to perform certain <br />functions of a project. Subcontractors working on these projects will contract directly with the school dis- <br />trict and are treated as prime contractors for purposes of the Disabled Veteran Business Enterprise (DVBE) <br />requirements. Each contract must either meet the participation goals or the good faith effort criteria in <br />order to be eligible for an award, School districts and/or CM firms may assist the bidders that are seeking to <br />comply with the DVBE requirements by developing a list of subcontractors/suppliers that could be solicited <br />for participation. Tills list of interested subcontractors/suppliers would then be passed on to the plan hold- <br />ing contractors. Tice CM may assist In the coordination of forms required for submittal by the contractor/ <br />subcontractor/supplier. <br />The CM firm may use Parts I and II of the Prime Bidder Good Faith Effort Worksheet, to develop a list of <br />interested subcontractors/suppliers. <br />Part i—Contacts <br />The CM firm may make the required contacts listed in this part to obtain lists of subcontractors/suppliers <br />that may be solicited to participate. <br />Part ti—Advertisements <br />The CM firm may advertise in trade and focus papers. The advertisement must comply with the require- <br />ments listed in this part of the form and include a list of the plan holding contractors that will be using <br />subcontractors/suppliers. <br />The CM firm must provide all "plan holding" contractors with the documentation of the above process to <br />include on their Prime Bidder Good Faith Effort Worksheet. <br />Part ill—Solicitations <br />This part must be independently performed by each pian holding contractor. 'The requirements of this part <br />would Include inviting subcontractors/suppliers to bid, listing each DVBE contacted and indicating if the <br />firm will be used or why it is not being used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.