Laserfiche WebLink
CONSTRUCTION & DEMOLITION <br />MATERIALS RECYCLING <br />REQUIREMENTS <br />Section 01151 <br />15-1207 <br />b. Salvaging building materials or salvage items at an off site salvage or reuse <br />center (i.e. lighting, fixtures). <br />C. Recycling source separated materials on site (i.e. crushing asphalt/concrete for <br />base course, or grinding for mulch). <br />d. Recycling source separated material at an off site recycling center (i.e. scrap <br />metal or green materials). <br />e. Use of material as Alternative Daily Cover (ADC) at landfills. <br />f. Delivery of soils or mixed inerts to an inert landfill for disposal (inert fill). <br />g. Disposal at a landfill or transfer station (where no recycling takes place). <br />h. Other (describe). <br />Contractor's Reuse, Recycling, and Disposal Report must quantify all materials <br />generated in the Work, disposed in Class III landfills, or diverted from disposal through <br />recycling. Indicate zero (0) if there is no quantity to report for a type of material. As <br />indicated on the form: <br />2. Report disposal or recycling either in tons or in cubic yards. If scales are available at <br />disposal or recycling facility, report in tons; otherwise, report in cubic yards. Report in <br />units for salvage items when no tonnage or cubic yard measurement is feasible. <br />3. Indicate locations to which materials are delivered for reuse, salvage, recycling, <br />accepted as daily cover, inert backfill, or disposal in landfills or transfer stations. <br />4. Provide legible copies of weight tickets, receipts, or invoices that specifically identify the <br />project generating the material. Said documents must be from recyclers and/or disposal <br />site operators that can legally accept the materials for the purpose of re -use, recycling, <br />or disposal. <br />a. Indicate project title, project number, progress payment number, name of the <br />company completing the Contractor's Report and compiling backup documenta- <br />tion, the printed name, signature, and daytime phone number of the person <br />completing the form, the beginning and ending dates of the period covered on the <br />Contractor's Report, and the date that the Contractor's Report is completed. <br />PART 2 - PRODUCTS <br />(not used) <br />PART 3 - EXECUTION <br />3.01 SALVAGE, RE -USE, RECYCLING AND PROCEDURES <br />A. Identify re -use, salvage, and recycling facilities. <br />B. Develop and implement procedures to re -use, salvage, and recycle new construction and <br />excavation materials, based on the Contract Documents, the Contractor's Construction <br />Waste and Recycling Plan, estimated quantities of available materials, and availability of <br />recycling facilities. Procedures may include on-site recycling, source separated recycling, <br />and/or mixed debris recycling efforts. <br />4 <br />