Laserfiche WebLink
Lincoln Elementary School - SUBMITTAL NO. <br />Cafeteria Replacement <br />Architect's Project #15-1207 Re -Submittal of Original No. <br />-jSA File/Appl. # Date: <br />1. SUBMITTAL TRANSMITTAL <br />To: Rainforth ■ Grau ■ Architects <br />Contractor: <br />2407 J Street, Suite 202 <br />Civil: <br />Sacramento, CA 95816 <br />Attn.: Anthony Herrera <br />Contact: <br />Sub Contractor: <br />Please submit only one <br />trade per submittal! <br />Contact: <br />Business Name <br />Address <br />City, State Zip <br />Description Of Submitted Materials: <br />Specification Section <br />Quantity Number Name Description <br />Architect's Received Stamp <br />Civil: <br />Contractor Statement: <br />This submittal has been reviewed and approved with respect to the means, methods, <br />techniques, and procedures of construction, safety precautions, and program incidentals <br />thereto. This submittal complies with the contract documents and comprises no variations <br />thereto, unless accompanied by a substitution request. <br />' By: Date: <br />Architect's Received Stamp <br />2_ TRANSMITTAL TO CONSULTANT(S): <br />Date: <br />Consultant's Received Stamp <br />Architect's Received Stamp <br />Civil: <br />Struct: <br />Mech: <br />Elect: <br />Other: <br />3. RE -TRANSMITTAL TO CONTRACTOR: <br />❑ NO EXCEPTIONS TAKEN ❑ REJECTED ❑ FURNISH AS CORRECTED <br />❑ SUBMIT SPECIFIED ITEM ❑ REVISE AND RESUBMIT ❑ NO ACTION REQUIRED <br />Corrections or comments made on the shop drawings during this review do not relieve the Contractor from compliance with requirements of the Drawings and <br />Specifications. This general check is only for the review of conformance with the design concept of the project and general compliance with the information <br />given in the Contract Documents. The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes <br />and techniques of construction, coordinating his work with that of all the other trades, and performing his work in a safe and satisfactory manner. <br />Rainforth ■ Grau ■ Architects By: Date: <br />Comments: <br />qpp .gnprifiratinn Sprtinn n13nn fnr ttsF? of this fnrm <br />i:11207 fincoln as - cafeteria replacementl4.06 projmanlsubmttl. docx <br />Distribution: <br />Date: <br />Copies to: <br />Contr: <br />PI: <br />Owner: <br />File: <br />Other: <br />