My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL REQUIREMENTS <br />Section 01350 <br />15-1207 <br />2. Owner, in consultation with Architect reserve the right to reject proposed <br />substitutions where data for VOCs is not provided or where emissions of individual <br />VOCs are higher than for the specified materials. <br />3. Comply with the specified recycled content and other environmental requirements. <br />PART 3 - EXECUTION <br />3.01 FIELD QUALITY CONTROL <br />A. Building Flush Out: Just prior to Substantial Completion, flush out building air continuously <br />(i.e. 24 hours per day, seven (7) days a week) using maximum tempered outside air (or <br />maximum amount of outside air while achieving reasonable indoor temperature) for at least <br />fourteen (14) calendar days. If interruptions of more than a few hours are required for testing <br />and balancing purposes, extend flush out period accordingly in order to achieve the <br />minimum fourteen (14) calendar day building flush out period. <br />1. When Contractor is required to perform touch-up work, provide temporary <br />construction ventilation during installation and extend building flush -out by a <br />minimum of four (4) calendar days after touch-up installation is complete with <br />maximum tempered outside air for 24 hours per day. <br />2. If construction schedule permits, extend flush -out period beyond minimum building <br />flush out period for an additional 15 days. <br />3. Return ventilation system to normal operation following flush -out period to minimize <br />energy consumption. <br />3.02 CLEANING <br />A. Final Cleaning Environmental Issues: <br />1. Clean interior and exterior surfaces exposed to view; remove temporary labels, <br />stains, and foreign substances; polish transparent and glossy surfaces using <br />cleaning and maintenance products that conform to standards as described in Part 1 <br />of this specification. <br />2. Clean equipment and fixtures to sanitary condition using cleaning and maintenance <br />products that conform to standards as described in Part 1 of this specification. <br />3. Vacuum carpeted and soft surfaces with high efficiency particulate arrestor (NEPA) <br />vacuum. <br />4. If ducts were not sealed during construction, and contain dust or dirt, clean ducts <br />using HEPA vacuum immediately prior to Substantial Completion and prior to using <br />ducts to circulate air. Oil film on sheet metal shall be removed before shipment to <br />site. However, ducts shall be inspected to confirm that no oil film is present. Remove <br />oil. <br />5. Replace all air filters (i.e., pre and final filters) just prior to Substantial Completion. <br />6. Remove and properly dispose of recyclable materials using construction waste <br />management program described in specification section 01151 - Construction and <br />Demolition Materials Recycling Requirements. <br />3.03 PROTECTION <br />A. Environmental Issues: <br />Protect interior materials from water intrusion or penetration where interior products <br />are not intended for wet applications and are exposed to moisture. <br />C.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.