Laserfiche WebLink
HAZARDOUS MATERIALS <br />LEAD PAINT <br />Section 02076 <br />15-1207 <br />PART 1 - GENERAL <br />1.01 INCLUSION OF OTHER CONTRACT DOCUMENTS <br />A. The General Conditions, Supplementary Conditions and Division 1 are fully applicable to this <br />Section, as if repeated herein. <br />1.02 RELATED WORK SPECIFIED ELSEWHERE <br />A. Section 02072, Minor Demolition for Remodeling. <br />B. Section 09900, Painting. <br />1.03 SCOPE OF WORK <br />A. This specification section includes the Scope of Work and Lead -Based Paint Specification <br />Requirements for the handling, monitoring and clean-up of lead paint. <br />B. Contractor shall assume all existing paint on this project contains lead. <br />C. Contractor is to prepare existing painted surfaces for application of new painting or finishing <br />systems where called for elsewhere in these documents as described herein. <br />D. Contractor shall be responsible for properly disposing of all removed hazardous material and <br />provide certification of such to the Owner. <br />END OF SECTION <br />1.11207 LINCOLN ES - CAFETERIA REPLACEMEN714.06 PROJMAN102076 HAZARDOUS MAT ABATEMENT LEAD PAINT.DOC <br />Last Updated: 04/29/04 <br />