My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCRETE FORMWORK <br />Section 03100 <br />15-1207 <br />C. Shop Drawings: Submit showing all parts, connections and anchorages, adjacent materials, <br />fully dimensioned and noted. <br />D. Submit executed Guarantee of Contractor/Subcontractor per Article 1.06. <br />1.06 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.05. <br />1.07 REFERENCES AND STANDARDS <br />A. California Building Code, current edition, (CBC) as adopted by the Division of the State <br />Architect (DSA). <br />B. ACI 3,10.— I( dl AC -1 2 <br />C. ACI 347 "Recommended Practice for Concrete Formwork". <br />D. American Plywood Association (APA). <br />E. West Coast Lumberman's Association (WCLA). <br />1.08 ADEQUACY AND INSPECTION <br />A. Design, erect, support, brace and maintain formwork and shoring to safely support all vertical <br />and lateral loads that might be applied until such loads can be carried by concrete. <br />B. Notify Inspector, Architect, Structural Engineer and DSA at least 48 hours prior to placing of <br />concrete. <br />1.09 FIELD MEASUREMENTS <br />A. Make and be responsible for all field dimensions necessary for proper fitting and completion <br />of work. Report discrepancies to Architect before proceeding. <br />1.10 PROJECT RECORD DOCUMENTS <br />A. Provide per Section 01700, Contract Closeout. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Form Material (Concrete Exposed to View): 5/8" (min) APA B -B Ply -form, steel or Sonotubes. <br />B. Form Material (Concrete concealed from View): 5/8" (min) APA B -B Plyform, steel or 1 x 8 <br />DF. No. 2 or better. <br />C. Form Ties: Snap off metal of fixed length: leaving no metal within 1-1/2 inches of surface <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.