CAST -IN-PLACE CONCRETE <br />Section 03300 <br />15-1207 <br />radius x'/2" deep groover or edging tool. Joints to be clean cut, straight, parallel or square <br />with respect to concrete walk edge. Tool all edges of exposed expansion joints, control <br />joints, walk edges, and wherever concrete walk adjoins other material or vertical surfaces. <br />Saw Cut, 1/8 inch x 1/4 slub thickness: Must be performed within eight hours of <br />completion of finishing. Do not make saw cuts if aggregate separates from cement <br />paste during cutting operations. Prevent marring of surface finish. Fill with flexible <br />sealant. <br />D. Exposed Concrete Surface Finishing (not including top surface of slabs): Remove fins and <br />rough spots immediately following removal of forms from concrete which is to be left exposed. <br />Damaged and irregular surfaces and holes left by form clamps and sleeves shall be patched <br />with grout. Tie wires are to be removed to below exposed surface and holes pointed up with <br />neat cement paste similar to procedure noted under "Patching" below. Removal of tie wires <br />shall extend to distance of 2" below established grade lines. Ends of tie wires shall be cut off <br />flush at all other, unexposed locations. Care shall be taken to match adjacent finishes of <br />exposed concrete surface. After patching, all concrete that is to remain exposed, shall be <br />sacked with a grout mixture of 1 -part cement, 1 1/2- parts fine sand and sufficient water to <br />produce a consistency of thick paint. After first wetting the concrete surface, apply mixture <br />with a brush and immediately float entire surface vigorously using a wood float. Keep damp <br />during periods of hot weather. When set, excess grout shall be scraped from wall with edge <br />of steel trowel, allowed to set for a time, then wiped or rubbed with dry burlap. Entire finishing <br />operation of any area shall be completed on the same day. This treatment shall be carried to <br />4" below grade, and all patching and sacking shall be done immediately upon removal of the <br />forms. <br />3.05 CURING <br />A. Concrete in Forms: Keep forms and top on concrete between forms continuously wet until <br />removal of forms. Maintain exposed concrete in wet condition for 14 days following removal <br />of forms. <br />B. Do not subject concrete to design loads until concrete is completely cured, and until concrete <br />has attained its full specified twenty-eight (28) day compressive strength or until twenty-one <br />(21) days after placement, whichever is longer. <br />C. Interior Slabs: shall be cured utilizing Wet Curing Blanket. For slabs utilizing a Moisture <br />Barrier Admixture within the concrete mix, Contractor must confirm with admixture <br />manufacturer, that the Wet Curing Blanket may be omitted. <br />D. Exterior Slabs: Cure utilizing Curing Compound. If applicable, the Contractor shall verify <br />that the approved Curing Compound is compatible with the approved colorant system. <br />Upon completion of job, wash clean per manufacturer's recommendations. <br />E. No Curing Compound shall be applied to areas scheduled to receive resilient track <br />surface including, curbs, ramps, run ways, etc. <br />3.06 DEFECTIVE CONCRETE <br />A. Determination of defective concrete shall be made by the Architect. His opinion shall be final <br />in identifying areas to be replaced, repaired or patched. <br />9 <br />