Laserfiche WebLink
THERMOPLASTIC MEMBRANE <br />ROOFING - ADHERED <br />Section 07541 <br />15-1207 <br />U. The Applicator shall conduct fastener pullout tests in accordance with the latest version of the <br />SPRI/ANSI Fastener Pullout Standard to verify condition of the deck/substrate and to confirm <br />expected pullout values. <br />V. The Sarnafil membrane shall not be installed under the following conditions without <br />consulting Sika Sarnafil's Technical Dept. for precautionary steps: <br />1. The roof assembly permits interior air to pressurize the membrane underside. <br />2. Any exterior wall has 10 percent or more of the surface area comprised of opening doors <br />or windows. <br />3. The wall/deck intersection permits air entry into the wall flashing area. <br />W. Precautions shall be taken when using Sarnacol adhesives at or near rooftop vents or air <br />intakes. Adhesive odors could enter the building. Coordinate the operation of vents and air <br />intakes in such a manner as to avoid the intake of adhesive odor while ventilating the <br />building. Keep lids on unused cans at all times. <br />X. Protective wear shall be worn when using solvents or adhesives or as required by job <br />conditions. <br />Y. Sarnafil membranes are slippery when wet or covered with snow, frost, or ice. Working on <br />surfaces under these conditions is hazardous. Appropriate safety measures must be <br />implemented prior to working on such surfaces. Always follow OSHA and other relevant fall <br />protection standards when working on roofs. <br />1.06 BIDDING REQUIREMENTS <br />A. Pre -Bid Meeting: <br />A mandatory pre-bid meeting shall be held with the Owner's Representative and involved <br />trades to discuss all aspects of the project. The Applicator's field representative or roofing <br />foreman for the work shall be in attendance. Procedures to avoid rooftop damage by other <br />trades shall be determined. <br />B. Site Visit: <br />Bidders shall visit the site and carefully examine the areas in question as to conditions that <br />may affect proper execution of the work. All dimensions and quantities shall be determined <br />or verified by the Applicator. No claims for extra costs will be allowed because of lack of full <br />knowledge of the existing conditions unless agreed to in advance with the Owner or Owner's <br />Representative. <br />1.07 WARRANTIES <br />A. Sika Sarnafil System Warranty (only products purchased from Sika are covered under <br />System Warranty) <br />Upon successful completion of the work to Sika Sarnafil's satisfaction and receipt of final <br />payment, the Sika Sarnafil System Warranty shall be issued. <br />B. Applicator/Roofing Contractor Warranty <br />9 <br />