My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THERMOPLASTIC MEMBRANE <br />ROOFING - ADHERED <br />Section 07541 <br />15-1207 <br />Roofing): <br />Sarnavap-10 is loose -laid over suitable substrate. Overlap all edges 4 inches and seal <br />with butyl tape. Extend Sarnavap-10 to perimeter and deck penetrations and seal to <br />provide continuity of the building's air/vapor envelope. Sarnavap-10 must be sealed on <br />the vertical surface at roof penetrations also. <br />B. Sarnavap Self -Adhered <br />1. Primer Application <br />The substrate must be clean, dry and free of dust, grease or other contaminants. Shake <br />well before using. Apply to clean and dry surfaces with a paint brush, roller or sprayer. <br />Application rates will vary depending on substrate. Sarnavap Self -Adhered vapor barrier <br />must be installed on the same day as the primer application. Acceptable substrates for <br />primer application include wood, concrete, lightweight concrete, gypsum boards and <br />decks. Drying time is typically 30 minutes to 3 hours. <br />Spraying equipment recommendations: <br />a) Spray tip size: between 20 and 25 mils. <br />b) Pressure: 1300 psi continuous <br />To Install: Follow membrane manufacturer's current installation requirements. <br />3.07 WOOD NAILER INSTALLATION <br />A. Install continuous wood nailers at the perimeter of the entire roof and around roof projections <br />and penetrations as shown on the Detail Drawings. <br />B. Nailers shall be anchored to resist a minimum force of 300 pounds per lineal foot (4,500 <br />Newtons per lineal meter) in any direction. Individual nailer lengths shall not be less than 3 <br />feet (0.9 meter) long. Nailer fastener spacing shall be at 12 inches (0.3 m) on center or 16 <br />inches (0.4 m) on center if necessary to match the structural framing. Fasteners shall be <br />staggered 1/3 the nailer width and installed within 6 inches (0.15 m) of each end. Two <br />fasteners shall be installed at ends of nailer lengths. Nailer attachment shall also meet the <br />requirements of the current Factory Mutual Loss Prevention Data Sheet 1-49. <br />C. Thickness shall be as required to match substrate or insulation height to allow a smooth <br />transition. <br />D. Any existing nailer woodwork which is to remain shall be firmly anchored in place to resist a <br />minimum force of 300 pounds per lineal foot (4,500 Newtons per lineal meter) in any direction <br />and shall be free of rot, excess moisture or deterioration. Only woodwork shown to be <br />reused in Detail Drawings shall be left in place. All other nailer woodwork shall be removed. <br />E. Stainless steel, corrosion resistant, fasteners are required when mechanically attaching any <br />Sika Sarnafil product to wood nailers and wood products treated with ACQ (Alkaline copper <br />Quaternary). When ACQ treated wood is used on steel roof decks or with metal edge <br />detailing, a separation layer must be placed between the metal and ACQ treated wood. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.