My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GLAZING <br />Section 08800 <br />15-1207 <br />3.05 CURE, PROTECTION AND CLEANING <br />A. Cure glazing sealants and compounds per manufacturer's instructions and <br />recommendations. <br />B. Protect exterior glass from breakage immediately upon installation by attachment of crossed <br />streamers to framing held away from glass. Do not apply markers of any type to surfaces of <br />glass. <br />C. Protect finished surfaces from scratches, abrasions and other damage; marred or damaged <br />work will be rejected. <br />D. Remove and replace glass which is broken, chipped, cracked, abraded, or damaged in other <br />ways during the construction period at no additional cost to the Owner. <br />E. Maintain glass in a reasonably clean condition during construction, so that it will not be <br />damaged by corrosive action and materials which might contribute (by wash -off) to the <br />deterioration of glazing materials and other work. <br />F. Wash and polish glass on both faces not more than 4 days prior to Owner's acceptance of <br />the work in each area. Comply with glass manufacturer's recommendations. <br />END OF SECTION <br />1:11207 lincoln es - cafeteria replacementl4.06 projman108800 glazing. doc <br />Revised: March 24, 2014 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.