My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
750
>
1600 - Food Program
>
PR0161533
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 7:17:05 PM
Creation date
10/15/2021 3:39:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0161533
PE
1632
FACILITY_ID
FA0001342
FACILITY_NAME
MUSD-LINCOLN SCHOOL
STREET_NUMBER
750
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118001
CURRENT_STATUS
01
SITE_LOCATION
750 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2850
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACOUSTICAL CEILINGS <br />Section 09510 <br />15-1207 <br />Tested per International Code Council - Evaluation Services - AC 156 Acceptance <br />Criteria for Seismic Qualification Testing of Non-structural Components as evidenced <br />by International Code Council Evaluation Report, ESR -1308. <br />G. Provide completely designed system complying with requirements of CBC Section 808, ASTM <br />C635, ASTM C636 and DSA Interpretation Regulation 25-2.13. <br />1.04 SUBMITTALS <br />A. Refer to Section 01300. <br />B. Manufacturer's Data: Submit list and complete descriptive data of all products proposed for <br />use. Include manufacturer's specifications, published warranty or guarantee, installation <br />instructions, and maintenance instructions. <br />C. Samples: The following samples are required. Submit per Section 01300. <br />1. Submit sample for each type of grid member, grid accessory and ceiling panel to <br />Architect for review. <br />2. Manufacturer's full range of colors for Architect's selection. <br />D. Shop Drawings: Show all parts, connections and anchorages and suspension system details. <br />Submitted system shall comply with general design requirements per Article 1.12 below. <br />Dimensioned reflected ceiling plans indicating location of light fixtures, mechanical air -supply <br />and return outlets and other items which affect ceiling will be required where proposed <br />installation deviates from that indicated in the contract documents. <br />E. Submit executed Guarantee of Contractor/Subcontractor per Article 1.05. <br />F. Submit additional information as applicable and as described in Article 1.03. <br />G. Test Report on load capacities. <br />1.05 GUARANTEE <br />A. Refer to General Conditions and Section 01300. <br />B. Submit fully executed Guarantee with submittal package required by Article 1.04. <br />C. Provide a written warranty executed by the manufacturer, agreeing to repair or replace <br />acoustical panels and ceiling grid that fails within the warranty period. Failures include, but <br />are not limited to:. <br />1. Acoustical Panels: Sagging and warping of standard panels as a result of defects in <br />materials or factory workmanship. In addition, acoustical panels that are designed to <br />resist the growth of micro-organisms and installed with manufacturer's suspension <br />system and which exhibit any visible sag and fail to resist the growth of mold/mildew and <br />gram positive and gram negative odor and stain causing bacteria. <br />2. Grid System: Rusting and manufacturer's defects <br />D. Warranty Period HumiGuard (or approved equal): <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.