Laserfiche WebLink
FOOD SERVICE <br />EQUIPMENT <br />Section 11400 <br />15-1207 <br />Remote refrigeration systems as manufactured by Cooltec Refrigeration Corp. Custom Multi -Circuited <br />refrigeration package shall be furnished as complete refrigeration systems to service walk-in freezer <br />Item No. 2 and walk-in refrigerator Item No. 3 as shown. <br />Contractor shall furnish and install, where shown on plans, U.L." Air-cooled Remote Refrigeration <br />Package as shown on drawings. Refrigeration system shall be housed in a weather protected <br />enclosure. The frame, enclosure, and panels shall be fabricated of galvanized steel. Entire frame shall <br />be pre -assembled, welded, cleaned, and painted with a prime coat of zinc chromate then finished with <br />a coat of baked enamel epoxy based paint. The condenser shall be sectional, removable multi -circuited <br />with rifled tube slotted finned and shall be designed for 201FTD. Condenser fan motors shall be <br />mounted on the top of the enclosure. <br />1. REFRIGERATION UNITS <br />A. Air-cooled condensing units shall be hermetic/glacier scroll type <br />(Copeland). Each unit shall be equipped with high -low pressure control, <br />liquid drier, sight glass & head pressure control, time clocks and pump <br />down solenoids. <br />B. All compressor units shall be new factory assembled to operate with the <br />refrigerant specified in the engineering summary sheet. Refrigerant R - <br />404a shall be used on all commercial temperature units and low <br />temperature units. <br />2. PRE -PIPING <br />A. All refrigerant lines shall be extended to right side of the package in a <br />neat and orderly manner. Suction lines must be insulated with Armaflex <br />(1" thick forlow temp, 3/4" thick for medium temp). <br />B. All tubing shall be securely supported and anchored with clamps. <br />C. Silver solder and/or sil-fos shall be used for all refrigerant piping. Soft <br />solder is not acceptable. <br />D. All piping to be pressure tested with nitrogen at 300 PSI. After the <br />condensing unit and coil have been connected, the balance of the system <br />shall be leak tested with all valves open. <br />3. CONTROL PANEL <br />A. The package shall have factory mounted and pre -wired control panel <br />complete with main disconnect breaker switch, compressor circuit <br />breakers, fuses, contactors and time clocks wired for single point <br />connection. <br />B. Electrical contractor shall provide and install main power lines to panel <br />and provide wire harness wiring for control and defrost heater between <br />and the defrost clock and the refrigerant fixtures, all in accordance with <br />the wiring diagram and local codes. <br />23 <br />