SUPPLEMENTARY CONDITIONS <br />Section 00800 <br />15-1207 <br />unavoidable. The granting of an extension of time because of unavoidable delays shall <br />in no way operate as a waiver on the part of the Owner of the right to collect liquidated <br />damages for other delays, or of the right to collect other damages, or of any other rights <br />to which the Owner is entitled. <br />ADD the following paragraphs: <br />§8.3.4 Delays shall be reviewed against the project schedule submitted by the Contractor at <br />project commencement and shall be considered only if the affected item is within the <br />critical path, at time of delay. Contractors shall make all efforts to identify such items <br />which may cause delay early in the project to avoid such delays. The lack of a project <br />schedule, as described elsewhere, shall void claims for delay unless the Architect <br />determines the delay is justified. <br />§8.3.5 Liquidated Damages: The number of calendar days required to complete the project <br />along with critical milestones are listed in the "Bid Form" and the "Agreement", and, <br />because actual damages for delay in completion of the work cannot be determined, the <br />amount, if any, that may be assessed as liquidated damages for each day's delay <br />beyond the scheduled completion date is also stated on the "Bid Form" and the <br />"Agreement". <br />ARTICLE 9 PAYMENTS AND COMPLETION <br />§9.3 APPLICATION FOR PAYMENT <br />§9.3.1 DELETE this paragraph in its entirety and SUBSTITUTE the following: <br />§9.3.1 At the conclusion of each month or as agreed between the Owner and Contractor, the <br />Contractor shall present for review and certification of the Project Inspector an itemized <br />Application and Certification for Payment, prepared in accordance with the accepted <br />schedule of values. The Project Inspector shall provide written certification by way of <br />signature presented on the application. Once certified by the Project Inspector the <br />Contractor shall submit to the Architect, seven (7) wet signed and notarized copies of the <br />certified Application and Certification for Payment. Such application shall be supported <br />by such data substantiating the Contractor's right to payment as the Owner or Architect <br />may require, such as copies of requisitions or invoices from subcontractors and material <br />suppliers, and shall reflect, total complete to date, total remaining through completion <br />and retainage for each line item. <br />Application for payment shall be prepared for only those materials and equipment <br />incorporated into the work in their final locations and shall not include request for <br />payment of materials or equipment stored on or off site, unless previously agreed to in <br />paragraph 9.3.2. Contractor shall provide a notarized lien waiver for all work included in <br />each payment application. <br />Prior to submitting application for payment to the Architect, all estimates of work <br />performed during the preceding calendar month and all requests for payment <br />thereof or for partial payment on account of equipment delivered but not installed <br />as herein provided shall be certified and countersigned by the Project Inspector. <br />22 <br />