My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014469
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100205
>
SU0014469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:29 PM
Creation date
10/15/2021 3:46:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014469
PE
2608
FACILITY_NAME
PA-2100205
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MQUNTAIN HOUSE SPECIFIC PLAN I I <br /> CHAPTER FIVE: rEDUCATION,CHILD GARE AN❑ LIBRARY SERVICES <br /> 6.1 INTRODUCTION <br /> This chapter summarizes Master Plan provisions related to education,child care,and <br /> librafy"rviu@s,and states bath the Plan Description and Implementation Measures for SP <br /> II_ Additional information may Le found in Chapter Three: Land Use and Chapter Four: <br /> DevOopment and Nsign. <br /> 5.2 SCHOOLS <br /> Master pian Summary <br /> The school district serving Mountain House Is the Lammersville Jnifiad-School District for <br /> grades K-8 and for grades 9-12. The district will provide the schools as needed. lnterlm <br /> facilities at existing schools wiR be provided Wp re the fast on-site schools are completed. <br /> The+.ammunity will be designed for integration of school and other eommunity facilities for <br /> compatible joint operation and shared maintenance costs. Links between stftal facilities <br /> and other services acid users are to be promoted for a variety of uses as outlined in N,e <br /> Master Plan.. <br /> �wEleyui►K-d Schools are to be sited to serve the ninElen proposed family <br /> neighborhoods and the two mixed active adult and family neighborhoods, Neighborhoods <br /> J and K,which Will share one K-$school. The K-8 sites will be located in Neighborhood <br /> Canter's wilfin 1%miles walking distance of the substantial msioriCy of homes In the <br /> neighborhood to faailtate pedest4ari circulation and relnforce neighhorhood structure. 14-a <br /> school core faailltfes will be lacated as Far as practical from cornmerciel areas, be bantered <br /> from commercial usea with playl`aelds and park,And have access tram differer7 streets. <br /> Each site will contain up to 16 acnes. In addition,aach K-8 School will have shared use fff <br /> an adjacerd 2.4 acres of neighborhood park for athletic fields that is sepat;ated from the <br /> school core facillt6as by latltiscaping,trees,or low fencing that allows convenient access. <br /> Each K-S school will accommodate the student generation of its neighborhood,targeted to <br /> an optimum of approximately 750 students,wiRh a maximum Of 870 students. <br /> As required by the Master Plan.the Lammersville Unified School( strict has prepared a <br /> comprehensive report on educational tadlitles for the entire Mountain House community. <br /> The report,Master EdueaflonM SAecificalions for KC-U Elementary SchoRis in the Mountain <br /> House Masle!'Plani,addresses education program,building program,implemanlatlarl <br /> strategics,acrd background information- School facility construction plans are phased and <br /> MI be triggered by development rn lestohea outlined by the report. <br /> One high sLtool will be sited in Mountain House to provide efficient access to all portions <br /> of the community and serve the expected distribution of high school students. The high <br /> school site will contaln up to 46.5 acres and be ptanrled to accopnmadate 2,300 to 21404 <br /> students. Land and funding for the schools shall be provided as described in the Public <br /> FinanCing Plan.School Factlities Master Plarr$acid School Funding agreements. <br /> All school sites will be Ionated to avoid pubiic health and safety hazards and land use <br /> contlicts and enable joint use of park5,IlUraries,tlluseurns,and other public services <br /> whenever passible. The Master Plan sets forth school siting Criteria Consistent with State <br /> requirements that are to be implemented by subsequent Specific Pians. A five-acre <br /> school service support center fe.g.trarispartetion,warehouse,and maintenance yard)wall <br /> be provided in the Old River Industrial Park Administrative offices will be provided as <br /> specified Irl the Schaal Faaillffes Master Plan. <br /> C14APTER FIVE_ EDUCATION.CHILD CARE AND t.15RARY Sr;RVICa PAGE 51 <br /> Revised 11f5 GI I? <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.