Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN 11 <br /> �.5 PHASiNG AND COSTS <br /> Master Plan Summary <br /> Electrical power distribution will be installed on an as-needed basis as part of the on-site <br /> roadways. The only exoeptlons to this incremental construction have been the extension <br /> o4 the initial temporary service lines for the first Specific Plan and the slfing and <br /> construction of the permanent oomnlunity electrical substation_ The initial service line <br /> extensions will require accelerated plarining and construction to coincide with the start of <br /> resid"ial development. <br /> Natural gas will also be provided on an as-needed basis as part of the on-site roadways. <br /> However,Vie relocation of the existing gas line from Mountain House parkway to Central <br /> Parkway will require detailed planning and phasing. <br /> Telecommunications will also he provided on an as-needed basis and will be developed <br /> along wittl on•sita roadways. <br /> Plan Description <br /> The Master Plan rggltirements related to phasing and oasts will tie implemented by Sell <br /> through the implementation measure listed below. <br /> SPIT'Implementation Measures <br /> 1, Phasing and Costs. All implementing projects shall comply with the <br /> applicable requirements of the Public Financing Plan and TechnIca I Report, <br /> Master Acquisition and Reimbursement Agreement between the MHCSO and <br /> Trimark Communities, Master Plats Dave lopment A g reem ent between San <br /> Joaquin County and Tel FRaFolk 0rRumitles;ILL 2the Masker Developer, <br /> M4CSU Capital Improvement Program,and applicob le development fee <br /> Ordinances. <br /> C MAPTER EIGHT ENERGY AND TELECOMMUNICATIONS PAGE 8.10 <br /> Resolution Template 01/2017 <br />