My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014469
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100205
>
SU0014469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:29 PM
Creation date
10/15/2021 3:46:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014469
PE
2608
FACILITY_NAME
PA-2100205
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> Mountaln House Transportatlan Improvement Fee Ordinance and Technical <br /> Report Dated March 99,2000,the applicable provisions of the Master <br /> Acquisition and Reimbursement Agreement between the MHCSD and <br /> Ts§og4 C mmurt tlgs,"Ib&Master Develouet,and Section 3.8.12 of the <br /> Master Plan Dave lopmentAgreement between San Joaquin County and <br /> THRIar4 C4rfaMUFfi vttte Master Developer. <br /> 9,d COUNTY ARTERIALS <br /> Masker plan Summary <br /> The Master Plan requires Mountain House to adequately plan for and assign fair shire <br /> responsibility to all County Arterials that may be significantly impacted by the community. <br /> Courity Arterials addressed by the Master Plan Include all non-freeway roadways external <br /> to the community plus those Arterials that carry County and Mountain House traffic directly <br /> through the community. Specifically,these include Byron Road, Mountain House <br /> Parkway,and Grant Lin®Road, Also included are roads Imated within Alameda and <br /> Contra Costa Counties and the City of Tracy, <br /> It is assumed that- <br /> Designated improvements to County roadways are In6Rnded to maintain LOS C during <br /> peak periods on all roads except&tate facilities,which may operate at LOS P.and <br /> Courcy road segments which function as Mountain House Gateways. <br /> Mountain House Getaway road segments include Grant Line goad from the County <br /> line to Mountain House Parkway; Mountain House Parltwsy fratn Byron Road to 1-205; <br /> and Byron Road from the County line to Wlcklund Road. <br /> IWtn the community is determined by the County to be the primary new traffic contributor, <br /> the community will be responsible for initiating trWci studies and imprnvernents consistent <br /> with Master flan Table 9_2r County Arterial Road Improvements. Improvements will be <br /> subject to the provisions of the County's offset mitigation program and cast relmbursemerd <br /> program. <br /> Each Specific Plan and accompanying environmental review will assess the transpprt&tian <br /> impacts of Mountain House development on other Counties and cfties. <br /> Plan VescriptSon <br /> The MHCSD Transportation Improvement Fee and the Sara JoagWn County Traffic Impact <br /> Mitlgation Fee have already identified the major improvements,casts and fair share <br /> obligations for all major transportation facilities for SPIT. As a supplernentto these adopted <br /> programs,the MHCS0 has performed an additional traffic sludy as part of SPil which <br /> confirms ll7e adequacy of these improvement programs and funding mechanisms, The <br /> fMEHC5I]Traf v Study further confirmed which components of the community buikkout <br /> system are likely to be completed as part of the implementation of SPII,as depicted on <br /> Figure 9.1, <br /> As part cf implementing projects contained within Sell.the MHCSD will perform detalIW <br /> traffic studies to identify the specifiv Improvements and related phasing of SPII roadways <br /> which may be necessary to support such implementing projects. As part of the approval of <br /> these Implementing projects the MHCSD Will condition such approvals to implernant.as <br /> warranted on a phased basis,the specific system Improvements that the projects trigger3, <br /> eorsisterrl with Gammunity AppfoVals, $ince the specific transportation triggers for the <br /> community transportation Improvements Mill be determined as part of implementing protect <br /> CHAPTER NINE TRANSPORTATY)N AND CIRGt TION PAGF9.1 <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.