Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> Mountaln House Transportatlan Improvement Fee Ordinance and Technical <br /> Report Dated March 99,2000,the applicable provisions of the Master <br /> Acquisition and Reimbursement Agreement between the MHCSD and <br /> Ts§og4 C mmurt tlgs,"Ib&Master Develouet,and Section 3.8.12 of the <br /> Master Plan Dave lopmentAgreement between San Joaquin County and <br /> THRIar4 C4rfaMUFfi vttte Master Developer. <br /> 9,d COUNTY ARTERIALS <br /> Masker plan Summary <br /> The Master Plan requires Mountain House to adequately plan for and assign fair shire <br /> responsibility to all County Arterials that may be significantly impacted by the community. <br /> Courity Arterials addressed by the Master Plan Include all non-freeway roadways external <br /> to the community plus those Arterials that carry County and Mountain House traffic directly <br /> through the community. Specifically,these include Byron Road, Mountain House <br /> Parkway,and Grant Lin®Road, Also included are roads Imated within Alameda and <br /> Contra Costa Counties and the City of Tracy, <br /> It is assumed that- <br /> Designated improvements to County roadways are In6Rnded to maintain LOS C during <br /> peak periods on all roads except&tate facilities,which may operate at LOS P.and <br /> Courcy road segments which function as Mountain House Gateways. <br /> Mountain House Getaway road segments include Grant Line goad from the County <br /> line to Mountain House Parkway; Mountain House Parltwsy fratn Byron Road to 1-205; <br /> and Byron Road from the County line to Wlcklund Road. <br /> IWtn the community is determined by the County to be the primary new traffic contributor, <br /> the community will be responsible for initiating trWci studies and imprnvernents consistent <br /> with Master flan Table 9_2r County Arterial Road Improvements. Improvements will be <br /> subject to the provisions of the County's offset mitigation program and cast relmbursemerd <br /> program. <br /> Each Specific Plan and accompanying environmental review will assess the transpprt&tian <br /> impacts of Mountain House development on other Counties and cfties. <br /> Plan VescriptSon <br /> The MHCSD Transportation Improvement Fee and the Sara JoagWn County Traffic Impact <br /> Mitlgation Fee have already identified the major improvements,casts and fair share <br /> obligations for all major transportation facilities for SPIT. As a supplernentto these adopted <br /> programs,the MHCS0 has performed an additional traffic sludy as part of SPil which <br /> confirms ll7e adequacy of these improvement programs and funding mechanisms, The <br /> fMEHC5I]Traf v Study further confirmed which components of the community buikkout <br /> system are likely to be completed as part of the implementation of SPII,as depicted on <br /> Figure 9.1, <br /> As part cf implementing projects contained within Sell.the MHCSD will perform detalIW <br /> traffic studies to identify the specifiv Improvements and related phasing of SPII roadways <br /> which may be necessary to support such implementing projects. As part of the approval of <br /> these Implementing projects the MHCSD Will condition such approvals to implernant.as <br /> warranted on a phased basis,the specific system Improvements that the projects trigger3, <br /> eorsisterrl with Gammunity AppfoVals, $ince the specific transportation triggers for the <br /> community transportation Improvements Mill be determined as part of implementing protect <br /> CHAPTER NINE TRANSPORTATY)N AND CIRGt TION PAGF9.1 <br /> Resolution Template 01/2017 <br />