Laserfiche WebLink
MOUNTAIN HOUSE SPECIFIC PLAN II <br /> The Mountain House Creek flood control improvements have previously been constructed <br /> as part of the development of Specific Plan I, including the outfall into Old giver. <br /> Improvements to the exlsting Levee and within the FEMA flood zone,to remove deve]aping <br /> portions from the flood zone,will be phased as necessary to provide flood protection from <br /> any given phase north of Byron Road. Specific phasing and improvements plans will be <br /> approved by the MHCSO prior to processing of changes to the flood insurance rate maps <br /> with FEIVIA. <br /> SPIE Implementation Measures <br /> 1. Phasing and Coats. All Implementing projects shall corn pty with the <br /> applicable requirements of the Public Financing Plan and Technical Report, <br /> Master Acquisition and Reim bursementAgreement between the MHCSD and <br /> Trimark Corn munMas, Master Plan Developraeint Agreement between San <br /> Joaquin County and T-FiFRafl SCR t9iJfM4es Cthe Master aevelor�er, <br /> MHCSD Capfta!Improvement Program,and applicable development fee <br /> Ordinances. <br /> 2. Flood Protection PhasingPlans. Specific flood control phasing and <br /> Improvement plans far areas contained within the FEMA 104 year flood <br /> areas,sh;II be approved by the MHCSD Prior to processing of permits to <br /> amend FEMA Maps, <br /> 1611) OPERATIONS AND MAINTENANCE <br /> Master Plan Summary <br /> Storm drainage and flood protection facklitles will be maintained by the MHG5D. A <br /> channel maintenance plan will be prepared prior to the submittal of the flrsl development <br /> permit and will include a program to monitorsedimentatton buildup for Mountain House <br /> Creek and drainage charinels. Maintenance pemanrtel,vehicles,and equipment may be <br /> shared with other facility mairitenanw crews to achieve staffing efficiency and cost <br /> reduclicos. These maintenance costs have been incorporated in the flscal analysis <br /> presenled In the PFP. <br /> SPII Implementation Measures <br /> 1. Operations and Maintenance_ All Implement!ng projects shall comply with <br /> the appiicahle requirements&the Public Financing Plan and Technical <br /> Report,Maste r Acq u is i6 on and Rel mburfsemant Agreement between the <br /> MHCSD and Trimark Communities,Master Plan development Agreement <br /> Gatween San Joaquln County and Trimark-Csmmun4ties;-LLCthe Master <br /> Dt velg er,MHCSD Capital Improvement Program,and applicable <br /> development fee Ordinances. <br /> CRAPTER FIFTEEN STOMIA DRXNAGE AND FLOOD 11114TEC10N PAGE 15.15 <br /> Ravisad iY1 V200T <br /> Resolution Template 01/2017 <br />