My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014470
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2600 - Land Use Program
>
PA-2100206
>
SU0014470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:48:57 PM
Creation date
10/15/2021 3:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014470
PE
2638
FACILITY_NAME
PA-2100206
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205-
APN
15518002
ENTERED_DATE
10/14/2021 12:00:00 AM
SITE_LOCATION
1810 E HAZELTON AVE
RECEIVED_DATE
10/7/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Timing: Improvement Plans, Building Permits. <br />18. Design Guidelines: All proposed single family development and all proposed commercial <br />development shall comply with the applicable provisions of the Master Developer Trimark r,,,,,m ,„;+;oma <br />LLC Single Family Residential Design Manual and the Commercial, Office & Industrial Design Manual, <br />as amended. For lands controlled by Shea Homes, compliance shall be evidenced by written approval <br />by Shea Homes or its Design Review Committee, in its sole discretion. For lands controlled by Trimark <br />Communities, LLC, compliance shall be evidenced by written approval by Trimark Communities, LLC or <br />its Design Review Committee, in its sole discretion. For non -Trimark properties, compliance shall be <br />determined by San Joaquin County. [Specific Plan II Implementation Measure 4.3.3 (1)] <br />Timing: Condition shall be met prior to issuance of building permits. <br />19. PLEP Requirement: For the purposes of the Public Land Equity Program (PLEP), the public land <br />dedication requirement for the Tentative Map for Neighborhoods I and J (minus the remainder parcel) is <br />168.89 acres, whereas the actual amount of public land identified in the PLEP Technical Report for said <br />Tentative Map is 70.60 acres. The resulting Public Land Deficit is, therefore, 98.29 acres. The <br />subdivider shall correct said Public Land Deficit by using one or more of the following methods: 1) <br />Dedicating Public Land which is not on the shown on the Tentative Map but which is within the <br />Mountain House Community to the Applicable Public Agency, sufficient in acreage to meet said Public <br />Land Deficit; 2) transferring fee title ownership of Private Land which is not needed for public facilities or <br />services but which is within the Mountain House Community to MHCSD, sufficient in acreage to meet <br />said Public Land Deficit; and/or 3) submitting land vouchers to the MHCSD, sufficient in acreage to <br />meet said Public Land Deficit. (Mountain House Development Title, Chapter 9-1245M regarding the <br />Public Land Equity Program, and Chapter 9-110M regarding definitions for "Public Land Deficit", <br />"Applicable Public Agency", "Private Land", and "land voucher".) If the PLEP, which includes the PLEP <br />Technical Report, is revised prior to the approval of the first Final Map, the subdivider shall comply with <br />the methods for correcting any Public Land Deficit that are specified in said revised PLEP. <br />Timing: Condition shall be satisfied prior to approval of the first Final Map, or as required by the <br />Applicable Public Agency. <br />20. Assessor Parcel No. 209-030-19: APN 209-030-19 shall be shown on the Final Map. Access shall be <br />provided on the Final Map by a 25 foot wide access easement from proposed Great Valley Parkway <br />improved with a 20 foot wide paved road with drainage. Any adjacent commercial uses shall require <br />discretionary review. The subdivider shall ensure that existing utilities to the site shall be maintained. <br />This condition becomes void if the parcel is merged with the surrounding parcel. <br />AGRICULTURAL RESOURCES <br />21. Agricultural Operation Phasing: An Agricultural Buffer and Conversion Phasing Plan shall be <br />submitted to the Community Development Department and approved by the Director. The plan shall <br />incorporate the following: <br />• Phasing of areas from agricultural to urban use — locations and time frames; <br />• Irrigation water supply and service plan approved by BBID; <br />• BBID encroachment permits; <br />• Temporary buffering that includes a 100 -foot setback between the edge of development and <br />ongoing agricultural operations as the project builds out; <br />• Permanent setbacks; <br />• Landscape buffers; and <br />• Fencing, signage or other suitable measures to minimize noise, spray drift and limit the <br />potential for trespass on agricultural lands and BBID facilities. <br />In addition, the plan shall address the following: <br />• Chemical applications <br />• Dust management <br />Timing: Condition shall be met prior to approval of the first Final Map. [MP policies 3.2.4 g), h) and i] <br />Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.