Laserfiche WebLink
recoup all or a portion of any over sizing costs, the developer may request the MHCSD to <br />process a reimbursement agreement pursuant to a MARA. <br />d. When public utilities are to be located outside public rights-of-way but within the Tentative <br />Map boundary, the developer shall provide public utility easements for these utilities. The <br />easements shall be shown on all Final Maps and Parcel Maps. <br />e. Prior to the submittal of improvement plans for the development, the developer shall <br />submit to the MHCSD composite schematic plans for intract storm drains, sanitary <br />sewers, and water distribution facilities. <br />f. Electrical transformers within residential Neighborhoods shall be in underground vaults, <br />subject to MHCSD and Modesto Irrigation District (MID) requirements. The developer <br />shall pay for any incremental costs relating to undergrounding transformers not paid for <br />by MID. <br />g. The developer shall fund, design and construct the required storm drainage system in <br />accordance with the requirements of the Storm Water Master Plan Update and the <br />MHCSD's Standards and Specifications to serve the Tracts unless otherwise required or <br />approved by the General Manager of the MHCSD. <br />h. The applicant shall construct catch basin filters and/or other source control Best <br />Management Practices (BMPs) for urban runoff from Tracts as determined by the <br />MHCSD. <br />i. MHCSD approved catch basin insert filters must be installed, intract and on the <br />arterials abutting the project, prior to construction. <br />ii. All intract filters must be maintained by the HOA. <br />50. Wastewater Treatment Plant: <br />a. Under the direction of the MHCSD, the applicant shall fund, design and construct a <br />phased expansion of the wastewater treatment plant (WWTP) of sufficient capacity to <br />serve this Tentative Map prior to reaching existing treatment plant capacity as determined <br />by the MHCSD. <br />b. The developer shall extend existing pipelines to the project site as shown on the Master <br />Sanitary Sewer Plan. <br />51. Water Treatment Plant: Under the direction of the MHCSD, the applicant shall fund, design and <br />construct a phased expansion of the water treatment plant (WTP), if applicable, to provide the <br />capacity needed to serve the project prior to reaching existing treatment plant capacity. Timing: <br />prior to Issuance of the first building permit <br />52. Traffic—Calming Circles: All proposed traffic circles shall conform to MHCSD traffic circle <br />standards. <br />53. The applicant shall comply with the requirements of the Transportation Demand Management <br />and Transit Plan (Hoyt, 1997) as administered by the MHCSD. Timing: ongoing. <br />54. Construction Emissions: The applicant shall implement the following: Regulation VIII Control <br />Measures of the SJVAPCD and applicable measures of the SJVAPCD Guide for Assessing and <br />Mitigating Air Quality Impacts. Timing: Note on improvement plans approved by the MHCSD for <br />Tracts. <br />55. Construction -Related Erosion: The applicant and/or contractor shall comply with applicable <br />NPDES General Construction Activities Storm Water Permit requirements established by the <br />Clean Water Act. Pursuant to the NPDES Storm Water Program, an application for coverage <br />Resolution Template 01/2017 <br />