Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) DSL Tank <br /> Are both vent and tank riser piping ® Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model OPW <br /> What is the OPE response when ® Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> vent piping that may interfere with ® No ❑ No ❑ No ❑ No <br /> the OPE operation? <br /> At what level in the tank is the 85 inches <br /> OPE set to activate? Inches from <br /> What is the percent capacity of the 94.5 % <br /> tank at which the OPE activates? <br /> Is the OPE in proper operating ® Yes ❑ Yes ❑ Yes ❑ Yes <br /> condition to respond when the ❑ No ❑ No ❑ No ❑ No <br /> stored substance reaches the <br /> designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ❑ Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />