Laserfiche WebLink
From: Cole jr, Russell P <Russell.Coleir@BNSF.com > <br />Sent: Saturday, February 27, 2021 5:22 PM <br />To: Muro, Claudia [EHD] <cnnuro@sigoy.org> <br />Subject: FW: Incident Report Update - FXFZ974615 (4638449) At STOIMF-CA (Origin: LOGPARKAN-KS) , Case Number: <br />Case - 5467177 <br />CAUTION: This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br />sender and know the content is safe. <br />Russ Cole <br />BNSF Railway <br />LARS Manager - Stockton, CA <br />209-460-6184 <br />From: Cole jr, Russell P <br />Sent: Saturday, February 27, 2021 2:11 PM <br />To: ChemicalManagement@corp.ds.fedex.com ; jim.clark@fedex.com ; FXF-RAIL@corp.ds.fedex.com ; <br />ben.seymore@fedex.conn <br />Cc: CSFedEx <CSFedEx@BNSF.com >; Bauer, Gregory D <Gregory.Bauer@bnsf.com >; LARS DL CIS Adnnin <br /><LARSDLCISAdmin@BNSF.com >; Rossi, Kimberly A <Kimberly.Rossi@bnsf.com >; LARSMBSF <LARSMBSF@bnsf.com >; <br />Rothwell, Luke T <Luke.Rothwell@BNSF.com >; BB.DP.LARS Group <BB.DP.LARSGroup@BNSFRailway.onmicrosoft.com >; <br />LARS DL SW <LARSDLSW@BNSF.com >; Carter, Jeffrey D <Jeffrey.Carter@bnsf.com > <br />Subject: Incident Report Update - FXFZ974615 (4638449) At STOIMF-CA (Origin: LOGPARKAN-KS) , Case Number: Case - <br />5467177 <br />FedEx Team, <br />On 2021-02-27 this shipment arrived at destination in Stockton CA and was <br />reported as a possible leaking load upon deramp. Personnel reported a dry <br />blue powder on the under side of the container and railcar. This shipment was <br />listed as containing hazmat. Patriot environmental was dispatched to inspect <br />and remediate. Upon arrival, contractor performed an exterior inspection <br />which revealed dried blue residue on the under side of the container. An <br />interior inspection was also performed and that resulted in finding several 55 <br />gallon drums of "Agritec Algaecide", a corrosive pesticide that had leaked <br />from caps that were loose. Contractor estimated that a total of 1/2 gallon of <br />product leaked over several drums. Contractor cleaned affected exterior and <br />interior areas of the trailer, cleaned and tightened drum caps, and sealed caps <br />with duct tape to prevent them from loosening during further transit. <br />Contractor completed remediation and departed facility at approximately <br />13:30. <br />This incident is deemed a shipper responsibility and FedEx will be <br />responsible for all costs associated with inspection and remediation. <br />In addition, please be advised that some counties in the State of California <br />will send BNSF Railway an invoice for their activity/handling/response <br />charges associated with a leaking shipment. It is not uncommon for BNSF <br />Railway to receive these invoices several months after incident occurrence, <br />2