LEGEND & SYMBOLS: COLD WATER LINE SIZING:
<br /> WATER HEATER WORK SHEET:
<br /> 1. SP/WP SOIL/WASTE 8. PREP-SINK PREPARATION SINK REVISIONS
<br /> PIPE LINE WATER SUPPLY FIXTURE UNITS (DFU)
<br /> 9. G/T G/T GREASE TRAP (RE: CPC 2019 TABLE 6103) FIXTURES NO. OF X GPH = GPH By
<br /> 2. VP VENT PIPELINE . COMPARTMENT
<br /> 10. W/H w/H WATER HEATER
<br /> 3. FCO O FLOOR CLEAN-OUT FIXTURE QUANTITY X FIXTURE UNIT TOTAL 3-TUB SINK (POT-PAN) 3 25 75 GPH 1
<br /> 11. VTR VENT THRU ROOF (WSFU) (WSFU) ix
<br /> 4. W/CO O WALL CLEAN-OUT
<br /> 12. CWL COLD WATER LINE 3-TUB SINK 1 3 3 PREPARATION SINK 1 10 10 TYPICAL FLOOR SINK
<br /> 5. F.S. F1 FLOOR SINK W/DOME STRAINER
<br /> 13. HWL HOT WATERLINE HAND SINK 2 5 10 "
<br /> 6. F.D. �®; FLOOR DRAIN PREP SINK 1 3 3 2°INDIRECT WASTE -
<br /> FINISH DRAINS AT LEAST
<br /> 7. H.S. HAND SINK 14. GPL GAS PIPE LINE MOP SINK 1 3 3 LAVATORY SINK 1 5 5 1"OVER FLOOR SINK TOP
<br /> MOP SINK 1 10 10 G C TO GROUT IN
<br /> GAP BETWEEN
<br /> GENERAL NOTES: HAND SINK 2 2 4 SINK&FLOOR
<br /> A) ALL F/D SHALL HAVE TRAP PRIMER LAVATORY 1 1 1 TOTAL FLOW GPH = 110 GPH
<br /> B) ALL WASTE PIPING SHALL DRAIN WITH "' PER FOOT. WATER CLOSET 1 2.5 2.5 FLUSHED WITH FLOOR
<br /> C) THE PLUMBING CONTRACTOR SHALL VERIFY THE ------------------------------------------------------------------------------------------------
<br /> EXISTING MAIN WASTE LINE LOCATION. TOTAL FIXTURE UNITS = 16.5 WSFU COMPUTING THE BTU INPUT:
<br /> NOTE: WATER LINE SIZE NEEDED: 1 INCH TOTAL SINK GPH 110 X 0.60 = 66 GPH
<br /> ALL PIPE INSULATION SHALL COMPLY WITH TABLE 4-22, FOR AREAS FOR FLOOR SINK
<br /> 2019 NONRESIDENTIAL COMPLIANCE MANUALNOTE: THE GENERAL CONTRACTOR SHALL VERIFY THAT COLD TOTAL FLOW RATE = 66 X 660 = 43,560 BTU MIN IS FULLY ACCESSIBLE
<br /> WATER SUPPLY LINE SHALL HAVE BACK FLOW PREVENTION
<br /> DEVICE OR INSTALL NEW ONE PER PLUMBING CODE. FLOOR SINK DETAIL 00
<br /> PLUMBING NOTES: (PER CPC TABLE 6-5)
<br /> WASTE LINE & VENT LINE SIZING:
<br /> 1). PLUMBING CONTRACTOR SHALL EXAMINE ALL EXISTING PLUMBING SYSTEM AND DRAINAGE FIXTURE UNIT (DFU) �
<br /> EXISTING LOCATION OF MAIN SEWAGE LINE. THE PLUMBING CONTRACTOR TO BE (RE: CPC 2019 TABLE 702.1) z Ov
<br /> VERIFY EXACT LOCATION & DEPTH OF POINTS OF CONNECTION TO EXISTING 2
<br /> UTILITIES. � O
<br /> 2). PIPING SHOWN ON PLAN IS DIAGRAMMATIC. CONTRACTOR SHALL DETERMINE 1/2" Q
<br /> TABLE FIXTURE QUANTITY X FIXTURE UNIT TOTAL (n � M
<br /> EXACT LOCATION TO AVOID ANY CONFLICT WITH EXISTING CONDITIONS, FIXTURE UNIT ABLE FOR DETERMINING WATER PIPE AND METER SIZES - �,�
<br /> 3). PLUMBING COMBINE VENTS TO BE MINIMIZE NUMBER OF ROOF PENETRATION DFU W �
<br /> w - 7
<br /> SIZE PER CODE. VENTS NOT PERMITTED WITHIN 10' OF HVAC AIR INTAKE OR BUILDING CW Z � z
<br /> MAXIMUM ALLOWABLE LENGTH IN FEET(meters) 3-TUB S/S SINK 1 3 DFU U 3 DFU U
<br /> WINDOWS. WHERE POSSIBLE, LOCATED VENTS THROUGH ROOF AT REAR SIDE METER AND SUPPLY TRAP PRIMER VALVE (D
<br /> OF BUILDING. EACH FIXTURES SHALL BE PROPERLY VENTED. ALL VENTS SHALL BE
<br /> STREET AND 40 60 so 10o Iso 200 250 300 400 Soo boo 700 soo 90 SUPPLY TO FREQUENTLY (IN WALL BEHIND ACCESS PANEL) ~ o cA
<br /> USED FIXTURE U) w
<br /> SERVICE, BRANCHES, " " � � p
<br /> TERMINATED IN ACCORDANCE WITH UPC. INCHES INCHES (12) (18) (24) (30) (46) (6I) (76) (9I) (122) (152) (183) (213) (244) (274 PREP-SINK 1 3 3 LLJ
<br /> 4). THE HOT WATER PIPE TOBVE WRAPPED WITH A MINIMUM OF 1" THICK R-7.7 INSULATION. Pressure Range-30 to 45 psi(207 to 310 kPA)** 0 LU
<br /> STORAGE TYPE WATER HEATERS FOR DOMESTIC WATER HEATING MUST BE %4 iZ*** 6 s 4 3 2 I I 1 0 0 0 0 0 o MOP SINK 1 3 3Uj 0 J
<br /> WRAPPED WITH AN INSULATION BLANKET HAVING ON R-VALUE OF 16 OR GREATER. %4 Y4 16 16 14 12 9 6 s s 4 4 3 2 2 2 Q a Q
<br /> 5). PLUMBING FIXTURES SHALL BE MEET ACCESSIBLE CODE OF 2019. �4 1 z9 2s z3 21 17 1s 13 12 10 s 6 6 6 6 HAND SINK 2 1 2
<br /> ) MAXIMUM OF 8 FLOOR DRAIN W
<br /> 6). FLOOR DRAINS IN TOILETS & IN THE INFREQUENT USED AREAS. THE F/D SHALL BE 1 1 36 31 27 25 20 17 15 13 12 10 s 6 6 6 o
<br /> PROVIDED WITH AN APPROVED TRAP PRIMER. %4 1%4 36 33 31 2s 24 z3 21 19 17 16 13 12 1z 11 LAVATORY 1 1 1
<br /> 7). FOR ALL FIXTURES THAT GO TO THE FLOOR SINK THE DRAIN PIPE SHALL HAVE A 1" M
<br /> 1 1%4 54 47 42 38 32 28 25 23 19 17 14 12 12 11 1/2" FINISHED FLOOR
<br /> MIN.
<br /> AIR GAP FROM THE FLOOR SINK. 1% 1y478 68 57 48 38 32 28 25 21 18 15 12 12 11 WATER CLOSET 1 4 " 4 "
<br /> 8). INSTALL or VERIFY THE EXISTING CONDENSATION LINE FOR THE A/C UNIT ON ROOF 1 1VZ ss 84 79 65 56 48 43 38 32 28 26 22 21 20
<br /> TOP TO HAVE A MIN. OF 3/4" COPPER PIPE WITH A TRAP TO SEWER LINE. 1Y2 IY2 150 124 105 91 70 57 49 45 36 31 26 23 21 20 FLOOR SINK 6 2 12 r-
<br /> 9). INSTALL HORIZONTAL DRAINAGE PIPING WITH A SLOPE OF 1/4" PER FOOT. 2 1Vz 151 129 129 110 so 64 53 46 38 32 27 23 z1 20 z O
<br /> 10). INCOMING WATER PRESSURE IN EXCESS OF 80 PSI SHALL INSTALL AN APPROVED 1 2 85 ss 85 85 85 ss 82 so 66 61 57 52 49 46 ------------------------------------------------------------------------------------------------ / LO
<br /> PRESSURE REGULATOR. TOTAL FIXTURE UNITS = 28 DFU
<br /> n a 1/3"COPPER"X" / Q
<br /> INDOOR WATER USE EFFICIENCY WITH CGBSC SECTION 5.303.3, GAS CONSUMPTION: NOTE: ALL VENT LINE SIZES ARE: 2" CONNECT TO FLOOR DRAINNOTE: z O
<br /> PROVIDED W/1/2"PRIMER TAP N
<br /> A) LAVATORIES SINK - 0.5 GPM @ 60 PSI TRAP PRIMER VALVE AND DISTRIBUTION UNIT LCL U
<br /> ITEM APPLIANCES B.T.U. BY PRECISION PLUMBING PRODUCTS INC.
<br /> FOR DRAIN & VENT LINE CAPACITY OREGON #1 CORROSION RESISTANT BRASS
<br /> B) WATER CLOSET- 1.28 GALLONS/FLUSH (RE: CPC 2016 TABLE 703.2) TRAP PRIMER W/A COPPER RESERVOIR AND Q O
<br /> A PVC DIAPHRAGM. r
<br /> C) KITCHEN FAUCETS: SHALL HAVE MAX.FLOW RATE OF NOT MORE THAN 1 DEEP FRYER 2X 105,000 " '^
<br /> PIPE SIZE INCHES 1-1/4" 1-1/2" 2" 3" 4" 5" 6" V♦ p
<br /> 1.8 GALLONS PER 60 PSI 2 2 BURNER WOK 240,000 W
<br /> 3 STOCK POT 158,000 " (MAX. FLU UNIT) TRAP PRIMER PIPING DETAIL o
<br /> D) URINAL-0.125 GALLON/FLUSH 4 GRIDDLE 90,000 "
<br /> VERTICAL 1 22 163 48 4 256 600 1380 NOT TO SCALE
<br /> 5 RICE COOKER 34,000 C =
<br /> LU T116 WATER HEATER 65,000 HORIZONTAL 1 1 83 35 4 216 5 428 5 720 5 Z
<br /> PIPE MATERIAL SCHEDULE 7 HVAC 60,000 Z Q
<br /> (MAX.LENGTH) 45 65 85 212 300 390 750
<br /> LU z
<br /> SERVICE UNDERGROUND ABOVE GROUND VERTICAL (FEET) ULU
<br /> #4 REBAR @ 24
<br /> HORIZONTAL(UNLIMITED) "O.C. DOWEL INTO CONERETE SLAB W Q
<br /> TOTAL BTU = 857,000 BTU
<br /> COLD & HOT WATER HARD TEMPER, COLD HARD TEMPER, COLD W/SIMPSON SET-XP EPDXY(ICC ES ESR 2508) 6" 0
<br /> DRAWN COPPER DRAWN COPPER FOR VENT PIPE EMBEDMENT MIN 0
<br /> TUBE TYPE "K" TUBE TYPE "L" GAS LINE SIZING: MAX. UNITS 1 83 24 84 256 600 1380 (N)2500 PSI CONERETE 0- 00
<br /> MAX LENGTHS,(FEET) 45 60 120 212 300 390 510
<br /> SANITARY WASTE CAST IRON/ABS CAST IRON/ABS 6" (E)SLAB
<br /> STORM DRAIN CAST IRON CAST IRON RATE OF CONSUMPTION 857,000/1,000 = 857 CFH
<br /> PLUMBING NOTES
<br /> GAS BLACK STEET MAIN GAS LINE LENGTH TO METER = 70 FT.
<br /> INDIRECT DRAIN HARD TEMPER, COLD DRAWN COPPER 12-
<br /> (E) DIRT
<br /> TUBE TYPE "M" GAS LINE SIZE = 211 INCH /������ �� �� ��
<br /> GRAVEL �QROFESSIONq�
<br /> A o y F�
<br /> ALL HOSE BIBB SHALL HAVE NON-REMOVABLE VACUUM BREAKERS. _SAND VAPOR BARRIER,6 MIL. `'` F �?
<br /> AND NO PARALLEL VENT IS ALLOW
<br /> ABLE
<br /> No.
<br /> SCHEDULE 40 METALLIC PIPE[NFPA 54:TABLE 6.2(b)] CONCRETE SLAB REPAIR DETAILS 6-30-21
<br /> PLUMBING FIXTURES SCHEDULE GAS: NATURAL, NOTE: sTgTF of ca�F���\P
<br /> NO SPECIAL INSPECTION IS REQUIRED
<br /> ID DESCRIPTION WATER PIPE DRAIN TO REMARKS MODEL# INLET PRESSURE: LESS THAN 2 psi FOR EPDXY REBAR DOWELS.
<br /> FIXTURE SIZES SANITARY PRESSURE DROP: 0.5 in W.C.
<br /> COLD HOT WASTE #4 REBAR @ 24"O.C. DOWEL INTO CONE
<br /> 3-TUB SINK 1/2" 1/2" YES ADVANCE TABCO #FC-3-1818-24RL SPECIFIC GRAVITY: 0.60
<br /> Designed by : T.W
<br /> PREP-SINK 1/2" 1/2" YES YES INDIRECT DRAIN #FC-1-1818 PIPE SIZE(inch) ` COUNTERTOP
<br /> HAND SINK 1/2" 1/2" YES ADVANCE TABCO PS-60 NOMINAL: 1/2 3/4 1 11/4 11/2 2 21/2 3 4 to Date : Oct 5, 2020
<br /> WATER HEATER 3/4" 3/4" P/T RELEASE TO THE MOP SINK. ACTUAL ID: 0.622 0.824 1.3049 1.380 1.610 2.067 2.469 3.068 4.026
<br /> WITH EXPANSION TANK PHEEM RCD-50T-60F6 Scale : AS SHOWN
<br /> MOP SINK 112° 112° YES FLORESTONE #MSR 2424 LENGTH (ft) CAPACITY IN CUBIC FEET OF GAS PER HOUR
<br /> Drawn : W.P.D.
<br /> TOILET BOWL 1/2" 1/2" YES 1.28 GAL./FLUSH KOHLER K-3544 10 172 360 678 1,390 2,090 4,020 6,400 11,300 23,100
<br /> RESTROOM LAV. 1/2" 1/2" YES INSULATE HOT/COLD/WATER PIPE&"P" 20 118 247 466 957 1,430 2,760 4,400 7,780 15,900 MIXING VALVE CHROME PLATED BRASS Job
<br /> TRAP LINE SET TEMP TO 120°.0.4 GPM KOHLER K-2005 j TAILPIECE & P-TRAP
<br /> 30 95 199 374 768 1,150 2,220 3,530 6,250 12,700
<br /> URINAL 3/4" YES 0.125 GALLON FLOW PER MINUTE 40 81 170 320 657 985 1,900 3,020 5,350 10,900 1/2" HOT WATER SUPPLY-,,, 1/2" COLD WATER SUPPLY SHEET
<br /> FLOOR DRAIN YES ZURN Z 415 50 72 151 284 583 873 1,680 2,680 4,740 9,660
<br /> FLOOR SINK YES ZURN Z 566 60 65 137 257 528 781 1,520 2,430 4,290 8,760
<br /> 70 60 126 237 486 728 1,400 2,230 3,950 8,050 1/4 TURN CHROME 1/4" TURN CHROME PLATED BRASS STOP PLATED BRASS STOP P 1
<br /> �
<br /> FOR URINAL,INSTALL THERMOSTATIC MIXING VALVE LIMIT TO 120°F AND HAMMER ARRESTOR. 80 56 117 220 452 677 1,300 2,080 3,670 7,490
<br /> NOTE: 90 52 110 207 424 635 1,220 1,950 3,450 7,030
<br /> 1: WATER PIPE MATERIAL TO BE COPPER. 100 50 104 195 400 600 1 MIXING VALVE DETAIL FOR LAVATORY SINK 2: VENT PIPE MATERIAL USE ABS '160 1'840 3'260 6'640 OF SHEETS
<br /> 3: WATER PIPE MATERIAL USE COPPER TYPE M ABOVE FLOOR,COPPER TYPE K BELOW FLOOR 125 44 92 173 355 532 1,020 1,630 2,890 5,890
<br /> 4: ALL HOSE BIBB SHALL HAVE NON-REMOVABLE VACUUM BREAKERS
<br /> 5: GAS PIPE MATERIALS USED BLACK IRON. 150 40 83 157 322 482 928 1,480 2,610 5,330