Laserfiche WebLink
� EQUIPMENT SCHEDULE SYMBOL LEGEND Q 208v30 <br /> I HIGH TEMP (500 ) FLEX W/GR❑UND O <br /> MARK MAKE MODEL DESC. CAPACITIES AMB ELECTRICAL ACCESS❑RIES SYMBOL ITEM ABBREV. <br /> CONNECTOR WITH ROPE GASKET WIRE <br /> 102 ITEM QTY VOLT PH CLAMP FLEX CONNECTOR POSITIVE FLOW I` CD <br /> CFM HEAT COOLING T❑T/SENS RECTANGULAR DUCT SIZE T❑ DUCT W/ SS 1/2` WEATHERT❑P ❑R FLUE CAP 11 � 120v 10 11 N CD <br /> NET INSIDE DIMENSIONS WIDE HOSE CLAMPS W/GR❑UND �J N <br /> IN/OUT FAN AND BASE C❑UNTERFLASHING FUSED DISC BY WIRE LO O <br /> LINED DUCT WITH INSULATION O' , <br /> ELECTRICAL <br /> \ (E)RTU-1,3 CARRIER PACKAGE 1200 65 35.4 80 FLA 18.8 208V 3PH W/ ECONOMIZER - - SEE DRAWING FOR THICKNESS GASKET - HIGH 1' CLEAR SPACE CONTRACTOR0 coN ti <br /> TEMP RTV BETWEEN JACK AN <br /> > 5,6 48HCA04 GAS 0.5" 53 29.0 65 MCA 23, MOCP 30 HIGH STATIC MOTORr&RWSffffffSff_WMFLEXIBLE SUPPLY DUCT, CLASS 1 SEALANT FLUE/DUCT U N <br /> FLEXIBLE RETURN DUCT, CLASS 1 LINE EC❑N L❑GIC C:3 TON ELECTRIC AFUE 81% 15 SEER/12,5 EER ROOF CURB WT=700# VD - VOLUME DAMPER, REQUIRED NONE 18 GA ALL WELDED WEATHERT❑P W/18'0 FINISH ROOFING - ROLL RTU- BOARD <br /> FD - FIRE DAMPER FDR COLLAR WELDED T❑ DUCT, UP JACK AND ATTACH 12" UNIT < - - O -0 <br /> (E)RTU-2 CARRIER PACKAGE 2000 72 57.5 85 FLA 25.0 208V 3PH W/ ECONOMIZER FSD - FIRE SMOKE DAMPER FSD UNDER COUNTERFLASHING XFRMR � <br /> „ - VD ATTACH 18 GA VENTILATED RC RH G Yl Y2 Wl W2 C 24 UJ - U <br /> 5 TON 48HCDA06 GAS 0,5 56 47,2 65 MCA 28.5, MOCP 45 HIGH STATIC MOTOR CSFD - CEIL. FIRE SMOKE DAMPER CSFD ROOF CURB TO FAN BASE ROOF JACK - 24 GA U <br /> ELECTRIC AFUE 82% 12.45 EER 15.2 MD DM - MOTORIZED DAMPER MD DM W/3#10x1' SM SCREWS 2 NAIL TO ROOF W/ MIN C O X @ <br /> SEER ROOF CURB WT-770 EA SIDE OF FAN BASE 0- U) L� <br /> 4-2'lOd NAILS C <br /> DUCTWORK - GI SPIRAL PIPE , O <br /> (E)RTU-4 CARRIER PA 3 /H W ECONOMIZER A GA VENTILATED ROOF CURB <br /> TURNING VANES TV ATTACH VENTILATED N M C <br /> 3 TON 48HCA04 GAS 3 MOCP 30 HIGH STATIC MOTOR u CURB TO 18 GA ROOF CURB � > <br /> IC AFUE 81% 15 SEER/12,5 EER , 300 FIRST LETTER CEILING W/3#10xFOR TRUSSES 1' SM SCREWS SEE STRUCT DWGS DSD. SD Q O •0 <br /> 2 EA SIDE ❑F CURB BASE �\ O __ <br /> CS-4 LOCATION: FLOOR 26 GA GI AIR PRODUCTS SL 20 00 <br /> MUA-1 FRIGIKING MAKEUP 2160 - - - 115V 3PH SEE SEE CAPTIVEAIRE 12x12 WALL C❑UNTERFLASHING 2x BLOCKING BY RC RH G Y1 Y2 W1 W2 C <br /> 350FD AIR UNIT 0.5" CAPTIVEAIRE DRAWINGS WT=200# - ® CS-4 SECOND LETTER DE�ECT❑RTRIC SMOKE (n � <br /> SUPPLY FILL V❑ID SPACE W/ <br /> DRAWINGS I SERVICE: RETURN RIGID INSULATION HONEYWELL VISI❑NPR❑ 8000 WITH NC U N <br /> MUA-2 FRIGIKING MAKEUP 3802 - - - 115V 3PH SEE SEE CAPTIVEAIRE I0 NUMBER-TYPE: EXHAUST FINISH ROOFING - R❑LL FLUE OR ROUND _ AUTOMATED DEMAND RESPONSE O <br /> UP CURB AND ATTACH T❑ EXH, DUCTL10 FUNCTION SERIES Y AND W <br /> 650FD AIR UNIT 0.5" CAPTIVEAIRE DRAWINGS WT-320# SEE SCHED. NAILER TERMINALS T❑ MATCH UNITS O +� Z <br /> CR-1 300 - CFM, CUBIC FEET PER MINUTE 3/8'0x3-1/2' LAG BOLT - EMBED FIREX REMOTE <br /> - <br /> DRAWINGS TEST SWITCH <br /> PROVIDE VD'SLAT ALLKWYIES ANDTAPSSEE TRUCTPLACEWGS 4-12"� DUCT THRU R❑❑ 5 AND LED'S RED LED o U 000 <br /> SUPPLYING GRILLES AND REGISTERS FOR FOR TRUSSES DETAIL M HONEYWELL C7232C100A HORN/STROBE 0 I- <br /> EXHAUST F FAN SCHEDULE � CE-1 AIR BALANCING PER T-24. FRAMING C02 SENSOR, WALL RESET O <br /> (-� 4x BL❑CKING BY GC RC 0 IOVDC MOUNTED WITH 24AIR PRODUCTS <br /> � Q <br /> O THERMOSTAT, UNIT NO. 1-HR SHEET ROCK (SR)SHA T POWER MS-RH/KA/P/AT <br /> MARK MAKE MODEL DESC. CAPACITIES ELECTRICAL ACCESS❑RIES AND OPERATING WT# 18 GA WELDED DUCT <br /> ITEM QTY VOLT PH CONTROLS © ❑N © BYPASS, NITESTAT, CLOCK - GREASE TIGHT, 3" U� <br /> CFM "ESP RPM S❑NNES AIRGAP TO INSIDE SR WYE/ELBOW/SAMCNA DUCT SUPPORT <br /> RTU-1 S,6 THERMOSTAT <br /> ABBREVIATIONS W/OR WO SYMBOLS LINE OPENING WITH LOW LOSS 'T' 'A' OR 'B' <br /> KHF-1 CAPTIVEAIRE KITCHEN HOOD 2400 2.0 906 16.8 208V 3PH SEE SEE CAPTIVEAIRE 700# 5/8' TYPE 'X' SHEET FITTING BELOW DETAIL Mp <br /> USBI24DD-RM FAN CAPTIVEAIRE DRAWINGS - WITH W/ ROCK WHERE HOOD <br /> EXHAUST IR DUCT +� <br /> DRAWINGS WITH OUT WO GOES THRU KITCHEN 208v 30 <br /> U <br /> / <br /> ROOF 3M FIRE BARRIER W/GR❑UND uJ <br /> KHF-2 CAPTIVEAIRE KITCHEN HOOD 4469 2.5 1119 25 208V 3PH SEE SEE CAPTIVEAIRE 725# © 615C DUCT WRAP WIRE aNi a0i <br /> USBI24DD-RM FAN CAPTIVEAIRE DRAWINGS (A 0 .`�-°-° 0 x i <br /> DOWN DN <br /> A N S - GALVANIZED SHEET METAL GI W/GR❑UND 3 0 3 - L <br /> VD-- 5' MA FLEX 120v 10 0 0 y U Q <br /> KHF- THRU ROOF 8 FUSED DISC BY WIRE '� 0 0 Q I <br /> KHF-4 CA 5 1.0 1408 8 115V 3PH SEE _ s o <br /> ABOVE FINISHED FLOOR AFF ELECTRICAL y 0 s <br /> USBIIIDD-RM HOOD FAN E DRAWINGS DETAIL MQ CS- 4A.CS-1. DS-1 VD FURNISH AT ALL SUPPLY CONTRACTOR 0 y 0 `- <br /> - TITUS ❑R REGISTERS IN WYE OR TAP, .� ;v 3 0 <br /> DRAWINGS BELOW FINISHED FLOOR BFF EQUAL, WHITE DAMPER SHALL HAVE ami 2 m 1y m p <br /> F- M _ 3 0_ 0 1 0 5, 1/ HP 1 V FINISH, N❑ OBD, LOCKING QUADRANT ❑N 1" LINE ON LOGIC E m M 'a <br /> W ❑F W R O _ RTU- BOARD d p Q E i= <br /> BELOW FINISHED CEILING BFC SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER <br /> FLEX DUCT T❑ MAIN RUN T❑ BE UNIT B a, ,� d c <br /> NCH036 SW, WEATHER H❑USING ON FLOOR PLANS SHAFTS, XFRMR L 0 3 L CL <br /> MIN 3'2" LENGTH S❑ THAT THE RC RH G Y1 Y2 W1 W2 C 24 R 0 O <br /> BDD - BACK DRAFT DAMPER, LOW LEAK - ABOVE FINSHED CEILING AFC DUCT SIZE AND INSULATION c d m 7) <br /> BS - BIRD SCREEN VALUE IS SHOWN ON ALL DUCTS PLYW❑❑D/SKIP C d -0 w -0 0 - U) <br /> NEW DUCTWORK AND MAX LENGTH TO BE 10'0' FOR SHEETING ROOF @ 1E R 3 3 m <br /> PR❑VIDE FANS W/TEFC AIR COOLED MOTORS, ROLLER TYPE DOOR SWITCH, NSF AND UL LISTED, WATERTIGHT ❑SHPD AND 5'0' FOR ALL OTHERS. ATTACH TO (E) JOISTS a <br /> JUNCTION BOX, CONTROLS AND STARTER PANEL, COLOR BY ARCHITECT. -X-X DEMOLITION TO BE REMOVED TBR 12' GI DUCT EXTENSION WITH 1-#10x1-1/2' DSD, SD <br /> ABOVE CEILING 2x2x1/8" ANGLE FASTAP SCREW, <br /> DIFFUSER/REGISTER SCHEDULE DUCTWORK EXISTING (E) INSULATI❑N, FLEX -ATTACH TO J❑IST AIR PRODUCTS SL 2000 <br /> DUCT TO MAIN RUN W/2-1/4'0x2' LAGS 40 41 40 40 PH❑TELECTRIC SMOKE <br /> 4 <br /> EMBED 1-1/2' MIN T DETECTOR MARK MAKE DESCRIPTIO FACE BLOW DAMPER COLOR REMARKS POINT OF CONNECTION POC 24 GAUGE GI REGISTER NC <br /> CUT OFF POINT COP <br /> MODEL N MOUNT OPERATING WT f CAN DOUBLE NUTTED ALL DUCT STRAP RC RH G Y1 Y2 wl w2 c <br /> CS-4 TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE SCREW CAN TO THREAD ROD WITH PER CMC <br /> HONEYWELL VISI❑NPR❑ 8000 WITH <br /> TDC-3-A4 SUPPLY T-BAR BRANCH BRANCH/BRANCH DUCT FURNISHED BY OTHERS FBO BLOCKING - 4 TOTAL SQ 1-b"xl-�"x6" AUTOMATED DEMAND RESPONSE FIREX REMOTE <br /> WASHER TO SUPPORT FUNCTI❑N SERIES Y AND W TEST SWITCH W <br /> CS-4A TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE - UP THROUGH ROOF UTR STRAP ,❑R, TERMINALS TO MATCH UNITS AND LED's GRN LJEDORED LTDC-6-A4 SUPPLY SURFACE BRANCH BRANCH/BRANCH DUCT UNLESS OTHERWISE NOTED UON 1- 'x24 GA HORN/SREOBE O W <br /> + CR-1 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD IN WYE BELLY BAND AIR PRODUCTS <br /> RETURN T-BAR BRANCH BRANCH/BRANCH DUCT C CONDENSATE, OVERFLOW C, OF z AROUND PIPE MS-RH/KA/P/AT <br /> A DUCT SUPPORT � � O <br /> )E CR-2 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD IN WYE HWS HEATING WATER SUPPLY, RETURN HWS,HWR LREGISTER - SEE PLAN <br /> RETURN SURFACE BRANCH BRANCH/BRANCH DUCT FOR SIZES - PROVIDE PLYWOOD/SKIP RTU-2,3,4 THERMOSTAT 2 _ N <br /> CHWS CHILLED WATER SUPPLY, RETURN CHWS,CHWR SHEETING ROOF <br /> DS-1 TITUS TMRA ADJUSTABLE DUCT 11 -WAY JIN DUCT WHITE 4#, MOUNT PER DETAIL 1/2' SOUND LINER IN 2x2x ' ANGLEA <br /> DROP FACE 5/MO MACHINE BOLT MB REGISTER CAN - ATTACHTO DETAIL IVIG I I O <br /> JOIST/TRUSS <br /> ROUND w/ 8"xl-1/2" <br /> CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED G,LPG NATURAL GAS, LPG LINE G, LPG LAG BOLT <br /> CEILING REG DETAIL EMBED 1' MIN CR-1 RA PLENUM <br /> IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID - ALL THREAD ROD ATR 4-#12GA CEILING WIRES TO O Q <br /> SYSTEMS, D❑UBLE NUTTED ALL SUPPORT 1' THICK DUCT BOARD / /l / <br /> DETAIL M D 3/8'x2' LAG BOLT ELBOW AND REGISTER, ATTACH V J �J <br /> RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS - OUTSIDE AIR OSA EMBED PINT❑ THREAD ROD WITH SQ REGISTER TO T-BAR W/(2) I I <br /> SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES CONFIRM REGISTER JOIST/TRUSS 1-�'xl-J'x6' WASHER #7x1/2' S/M SCREWS THRU I I I <br /> SAS FEET PER MINUTE FPM 1- 'x1- 'x18 GA TO SUPPORT STRAP OUTLET FLANGE TO GRID RUNNER <br /> FINISH (MILL OR PAINT) WITH ARCHITECT PRI❑R TO ORDERING SLOTS. MUA- SEISMIC BRACE ON OPPOSITE CORNER <br /> + NO SCREW HOLES DUCT TEMPERATURE SENSOR DTS 12 GA < CLIP - ATTACH -LOCATE EVERY 40' 1- 'x24 GA BELLY <br /> TO EC - 2#8 SM SCREWS DRAIN - SEE PLUMBING AND AT CHANGES IN BAND AROUND PIPE NECK SIZE Q:� O <br /> HVAC Notes cements, latex, etc, shall be made of materials with a FLEXIBLE DUCT CONNECTOR FC EACH POST ABOVE WATER LINE FOR C❑NTINUATI❑N DIRECTI❑N OF PIPE - DUCT IS EXPOSED " <br /> IN PAN, 2-1/4` LAGS TO 0 <br /> 1. Furnish and install all ductwork in accordance Flame spread <=25 and smoke <=50. - _ PLYWOOD EMBED 1` - SEAL �1 0 <br /> FLEX DUCT LATERAL BRACE 80' N <br /> with the latest editions of CMC (SMACNA dLAL A <br /> duct 12. It is the responsibility of the Mechanical Contractor PENETRATIONS WATER TIGHT x Z <br /> construction standards). to coordinate the installation of his work includingSTEAM PIPE S 4x BLOCKING FOR DRAIN ❑C AND AT CHANGE <br /> LATERAL BRACE OF DIRECTI❑N (U <br /> 2. All pipes, ductwork and conduit shall be installed and equipment substitutions with the other trades OR 6' GA CHANNEL 40' ❑C AND AT <br /> seismically braced per SMACNA's Seismic Restraint including but no limited to electrical, fire sprinkler, STEAM CONDENSATE SC SET BLOCKING IN MASTIC CHANGE OF 2'x24 GA GI DUCT SUPPORT STRAP <br /> Guidelines, ❑SHPD pre-approval, #R0010, framing and plumbing, 1-1/8' PLYWOOD TOP W/ DIRECTION WITHIN 2' OF REGISTER - MIN FLEX <br /> p pp g p g' MAKEUP WATER CW 24 GA GI COVER - ATTACH DUCT LENGTH IS 3'2' S❑ THAT ALL (� <br /> 3, All contractor furnished equipment installation and 13. Insulate all ductwork per the T-24 energy TOP T❑ cuR6 w/1/4'x2" LAGS DUCTS SHALL DISPLAY THE DUCT <br /> startup instructions shall be kept with the piece of requirements found in the T-24 compliance report, Da SHUT OFF/BALL VALVE By 24' ❑C ALL SIDES IZE AND INSULATION VALUE AND <br /> equipment in weatherproof ouches until final All ductwork shall be tested for leaks with a maximum 'B' SEISMIC ANCHORAGE DETAIL MAX LENGTH IS 10' FOR OSHPD, 5'0" <br /> p p 14 GA GI ROOF CURB FOR ALL OTHERS, ALL ELBOW <br /> - DUCT SMOKE DETECTOR DSD �� <br /> inspection, After final inspection, three Sets of Static pressure in the duct of 1,10", maximum leakage 12" MIN HT PR❑VIDE INTERNAL r RADIUS'S TO BE 1,5 DUCT DIAMETER, <br /> operation, installation, maintenance and start-up shall not exceed 4% of the total supply and return SUPPORT EVERY 54' DUCT D U P P❑RTS 6 FLEX DUCT TURNS TO BE 2.0 DUCT <br /> instructions shall be given to the Owner for each air volumes, NON-STANDARD ABBREVIATIONS: 26 GA GI DETAIL MQ DIAMETER <br /> LASHING <br /> - ROOF TOP UNIT C❑UNTERF <br /> piece of equipment per the Ca Green Building Code, 14. Contractor shall label all equipment with unique RTU RTU - HEATPUMP FAN COIL FILL ERF SPACE W/ AT CEILING SYSTEM <br /> 4. All Fire and Fire Smoke Damper installation identification using plastic engraved plates with 1/2" SCHPFC - SELF CONTAINED HEAT RIDGID INSULATI❑N B-LINE B359 TWO HOLE <br /> instructions shall be made available to the inspecting tall lettering indicating the equipment number and PUMP FAN COIL FINISH R❑❑FING - ROLL 9011C❑NNECT❑R - ATTACH TO <br /> UP CURB AND ATTACH T AIR OUTLET - WT<10# <br /> authorityfor their review, state the areas served b the equipment, See CEF - CEILING EXHAUST FAN NAILER SIDE ❑F EVAP COOLER W/2 14' <br /> yMACHINE BOLTS WITH WASHERS. #7 SM SCREW OR #12 <br /> 5. All penetrations through fire rated assemblies Shall specifications on dREF - ROOF EXHAUST FANwgs. 3/8'0x3-1/2' LAG BOLT - EMBED GA SLACK WIREON <br /> OHP - OUTDOOR HEAT PUMP PROVIDE 14'0x2" LONG D❑BLE OPPOSITE CORNERS <br /> be fire stopped and sealed with a material that 15. All flex duct will be stretched as tight as possible CU - CONDENSING UNIT 3' MIN, PLACE 48'❑C NUTTED CLOSED EYE FOR CHAIN <br /> meets Or exceeds the `T' ratingof the assembly and a5 per manufacturers Listing to avoid all kinks FC - FAN COIL SEE STRUCT DWGS TO ATTACH TO CONNECTOR NOTE; <br /> y p g FOR TRUSSES SECURE CEILING OUTLET TO S.A.T. <br /> penetrated, Materials to be used for sealing shall and sagging, PROVIDE HOLDDOWN AT EACH CEILING GRID WITH (2) #10x1/2' S/M <br /> be coordinated with the General Contractor to 16. All smoke detectors shall be tested as required with 4x BL❑CKING BY Ge CORNER. STAND WILL PREVENT SCREWS THRU OUTLET FLANGE TO <br /> provide One brand onsite, an approved smoke system per the City Of Lodi's UNIT FROM AND CHAIN MOVINGWILL LATERALLY PREVENT UNIT GRID RUNNER <br /> AND 2) #12AT GO AA SLACK <br /> 6. Install all pipe and duct insulation materials per T-24 standards In the presence of the inspector Or fire �FROM TIPPING. UNIT WEIGHT WIRES ATTACHED TO STRUCTURE l/ / Q <br /> requirements, All material to be installed shall meet Marshall, MUA- CURB M❑U N T 1 Q ////// WITH STAND 650# ABOVE USING CLOSED LOOP EYEBOLTS, U LL-1 <br /> CBC flame and smoke requirements per note 11, 17. All systems shall require an air balance report upon DETAIL ^ WIRE AND SCREWS ARE REQUIRED ON <br /> q p y q p p M� 14'TURNBUCKLE - TIGHTEN CHAIN ALL REGISTERS, <br /> 7. All work on this project shall conform to the final inspection. Submit reports on NEBS or NABC TILL SNUG AGAINST SIDE OF Z `� <br /> following codes: forms an independent certified air balance showing EVAP COOLER U� <br /> system has been balanced and OSA quantities set to 1-i'A'O SOLID CHAIN CUT TO Q U) <br /> 2016 CBC that shown on drawings, LENGTH AND WELD ATTACHMENT <br /> 2016 CPC 18. Condensate drain lines installed in direct or indirect LINKS CLOSED T-BAR REGISTER n�3 = LL] Q LL] <br /> 2016 CMC sunlight shall be UV resistant CPUC or PVC pipe and WELD 14'0x1" CLOSED EYE TO DETAIL M� <br /> 2016 CEC shall be painted to protect from UV radiation, ANGLE IR❑N STAND <br /> 2016 CALIFORNIA GREEN BUILDING CODE, 19. Seal all joints and seams with DP-1010 duct sealer, SEE RA5,6,7 AND 8 FOR ANGLE W U LL <br /> J O <br /> IRON STAND CONSTRUCTION AND 208V, 240V SYSTEM <br /> 8. All wye branches connected to a diffuser, grille or T-24 MECH AND PLUMBING MANDATORY FEATURES ATTACHMENT DISCONNECT (42' FOR 480V U� C:) Z <br /> register shall have a manual volume damper installed SYSTEM) <br /> in the wye branch. ❑BD's shall only be used when 1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY cIL I <br /> wye branches will be installed over inaccessible ceiling PER SECTI❑N 1102 - SEE SCHEDULES ON M-0. MUA-1 SEISMIC HOLD D❑WN 7 <br /> areas or in the slab of the building, Dampers shall 2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTI❑N <br /> DETAIL <br /> be fabricated of the same gauge as the duct with 1" 120.2 FOR THERMOSTATS AND DDC CONTROLS - SEE M� ELECTRICAL PANEL OR UNIT �ONAI <br /> standoff, locking quadrant, and handle, Fasten red DETAILS ON MO. <br /> DISCONNECT �,`' G. <br /> ribbon to handle to mark location, 3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION DEDICATED CLEAR �G <br /> 9. All pipe to be schedule 40 with screwed fittin 1103 s, . UNOBSTRUCTED WORKING SPACE <br /> a5 <br /> 9 p p g IN FRONT OF PANEL, � � <br /> All air conditioning/refrigeration condensate drain 4. USE OF PILOT LIGHTS ON HVAC, GAS C❑❑KING POOL AND FLOOR/ROOF TO STRUCTURAL <br /> Lines shall be schedule 40 PVC run to the an SPA HEATERS PROHIBITED PER SECTION 110,5 MEMBER ABOVE PER NEC110-16 <br /> approved tor, Set pipe on redwood blocks with 5. LAVAT❑RIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP 384-4, VERIFY ALL POSSIBLE U7 NO. M29759 Q <br /> pprovereceptor, p p CONFLICTS WITH OTHER TRADES REN. 6-30-18 <br /> 24 ga GI cover unless otherwise shown differently on AT 1102F OR LESS PER SECTION 110.3 - SEE PLUMBING PRIOR TO ROUGHING IN THE <br /> drawings, SCHEDULE PANEL BOARD OR DISC❑NNECT. <br /> 10, Provide smoke detectors in the supply air duct on all 6. VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR OF C IN, <br /> units when the aggregate cfm exceeds 2000 cfm of BALANCE <br /> all equipment serving a room or more than one room 7. NATURAL VENTILATI❑N PER 120,1,1o,1 N/A ELECTRICAL PANEL/DISCONNECT <br /> and the room has no direct exits to the exterior, 8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0 4 <br /> Duct smoke detectors shall be installed after the AND NOTES, DETAIL MO 7DRAWN: NR <br /> supply fan before any branch takeoffs, When more 9. SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See SEPT. 18, 2019 <br /> than one unit serves a TI space and the aggregate schedules on M-0 <br /> cfm of the units serving the TI space exceeds 2000 10, ISOLATION AREA DEVICES PER 122,g N/A JOB # 2018-026 REVISED : NOV. 10,2019 <br /> cfm, all HVAC equipment shall have duct smoke 11, PIPE INSULATI❑N PER 120,3,8 SEE NOTES, TABLE 120,3-A <br /> detectors, All duct smoke detectors shall be wired 12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE <br /> to shut down all units when a single unit alarms. M-0, NOTES AND SPECIFICATI❑NS GDMD ENGINEERING, INC <br /> 11. All exposed ductwork shall be GI pipe and fittings. 13. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END Mechanical and Safety Engineers <br /> Line all rectangular duct with insulation with the OF PROJECT PER SECTION 120,5, 120.7 AND 120.8 - SEE <br /> R-vlaue listed in T-24 for the location of the duct T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE 212 W Pine St, Ste 4 <br /> (attic, conditioned or outside), All duct materials SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC Lodi, Ca 95242 <br /> from insulation to mastics including but not limited to AND PLUMBING SYSTEM, AND FOR EACH HVAC AND Ph 209-367-0899 <br /> sheet metal, insulation, liners, plastics, rubber PLUMBING PIECE OF EQUIPMENT, <br /> Fax 209-367-0898 M 0 <br /> E-mail:gdmdengrinc@sbcglobal.net <br />