<br /> PLUMBING FIXTURE SCHEDULE PLUMBING LEGEND
<br /> JOHNSON A419 T LEG LEER -
<br /> 110V 110V BREAK PUMP HOT LEG ON HI
<br /> TEMP O
<br /> MARK MAKE/MODEL TRIM ACCESS❑RIES MUA-1 1/2` HWR LINE
<br /> H❑SEBIB FLUE
<br /> BENEKE 523 ELONGATED SYMBOL DESCRIPTION SYMBOL DESCRIPTI❑N 1-1/4' HWS TC o
<br /> WC-1 KOHLER K-3609 1.28 GPF 17" ADA TANK TYPE ELONGATED WATER CLOSET, N
<br /> 495-2121-00 POLISHED CHROME HANDLE, BRASSCRAFT KTSR10FC SEAT, NON LOCKING PROVIDE LEAD SAFE s0 DA PER � NO
<br /> STOP, B1-12DLF HOSE, WAX RING, RIGHT HAND 12"RI, LOOSE KEY, COVER, RI PER ADA ---CW COLD WATER LINE �� BALL VALVE <= 4", GATE VALVE>4" WITH PENETRATIONS
<br /> AT 1-1/4 CW LINE p7 ,
<br /> COLOR BY ARCHITECT. REQT'S ALL PIPE PENETRATI❑NS 0) co r-
<br /> --HW HOT WATER LINE �0� BALANCING VALVE SOV U N
<br /> L-1 KOHLER K-2196 SELF RIMMING LAVATORY, ZURN Z-7440-FC 0.5 GPM WF FAUCET, RI PER ADA 1/2'x3' LAG BOLT rn
<br /> TO BLOCKING IN WALL CIRCUIT SETTER
<br /> PENNINGT❑N ZURN ZW1017 MIXING VALVE, DEARB❑RN 76OW-1 GRID DRAIN & PVC REQUIREMENTS IIIIIII TD TRENCH DRAIN S� GAS COCK 2' DRAIN ALANCING VALVE < — p p 0)
<br /> EMBED 2'
<br /> 4-
<br /> VITREOUS P-TRAP BRASSCRAFT KTSRIOFC STOPS & B-16A SUPPLY HOSES 2002 fn -
<br /> 1/2' CW BELOW V J
<br /> CHINA P-TRAP & ANGLE STOP INSULATION. COLOR BY ARCHITECT, SS SANITARY SEWER AC ABOVE CEILING ROOF 18 GAx2' WIDE STRAP SENSOR N&A419 nn ll O X
<br /> TWV-1 WILKINS (ZURN) TEMPERING HOT WATER VALVE FOR PUBLIC RESTR❑❑MS, 3/4" MNPT, SET AT 120 DEG F MAX GL GREASE LINE BFF BELOW FINISHED FLOOR E V A P COOLER PIPING TOP LOCAOF TANTE 12' K S❑V W (n LL 0
<br /> 34-ZW1017M PROVIDE UNIONS ON EACH SIDE OF VALVE, TEMPERATURE TYP
<br /> 3/4' TPR LINE
<br /> L-2 ADVANCE-TABC❑ — DETAIL PO 4
<br /> WCP-1 CIRC
<br /> 10"x14"x5" SINK BOWL WITH SOAP DISPENSER, PAPERY❑WEE FURNISHED BY OTHERS —HV HORIZONTAL VENT AFF ABOVE FINISHED FLOOR T❑ MS- UMP �
<br /> 7-PS-80/7-PS-1 DISPENSER, 2 WELDED 7-3/4" HIGH SIDE SPLASHES, SPLASH AND INSTALLED BY 3 CHK VALVE Q O
<br /> 7 SD— STORM DRAIN LINE BFG BELOW FINISHED GRADE
<br /> MOUNTED 4 ❑.C. GOOSENECK FAUCET W/ AERATOR AND BUILT-IN PLUMBING CONTRACTOR GAS LINE W/6' DRIP TYP < — ZEA �
<br /> OVERFLOW, LEG - SEE FLOOR � C0 Q
<br /> —C — CONDENSATE DRAIN MV MIXING VALVE PLAN FOR slzEs �
<br /> 3CS-1 ADVANCE TABC❑ 3 COMPARTMENT POT SINK COMPLETE WITH ADVANCE TABC❑ 15" REFER TO KITCHEN 4# LEAD JACKET - : ti
<br /> SWING SPOUT, 18x18 SINK BASINS, 2-24 DRAIN BOARDS, DRAWINGS FOR EXACT —MA — MEDICAL/DENTAL AIR WC WATER CL❑SET HOT MOP INTO ROOF � +'
<br /> BEND TOP OVER PIPE AND (� d)
<br /> SIZE EXTEND 2" INTO OPENING SECURE BASE � O
<br /> —V— VACUUM UR URINAL T❑ DECK W/ 3/8•x3'
<br /> 2CS-1 ADVANCE TAB(❑ 2 COMPARTMENT POT SINK COMPLETE WITH ADVANCE TAB(❑ 15" REFER TO KITCHEN °R LAG BOLTS, 2x2x1/4• T-1 O �'
<br /> SWING SPOUT, 18x18 SINK BASINS, 24" DRAIN BOARD. DRAWINGS FOR EXACT RUBBER RING FLASHING CLIPS - EMBED LAGS" 12•M N Z
<br /> �� ��� SI E V, VR, VTR VENT, VENT RISER, VENT THRU ROOF L LAVATORY AND CLAMP FOR METAL ROOFS w/ \ I�
<br /> 2' INTO BLOCKING
<br /> HOSE CLAMP AROUND PIPE EXTEND 6" AFR 1-1/4' CWS
<br /> z 00
<br /> PS-1 GSW SE15151L 1 COMPARTMENT PREP SINK COMPLETE WITH SWING SPOUT, 15x15 REFER TO KITCHEN —SSD — SANITARY SEWER DROP S SINK FINISHED ROOF - SEE ARCH I�
<br /> SINK BASIN, 15" DRAIN BOARD DRAWINGS FOR EXACT DWGS - FLASHING INSTALLATION SHALL Q
<br /> SIZE RWL RAIN WATER LEADER MS SERVICE/MOP SINK MATCH ROOFING MANUFACTURERS
<br /> � 1 DETAILS TO MAINTAIN WARRANTY
<br /> B -1 S -A A-181 - 1 xl 17 A TA P D TA NL S S EE (SS) SINK (S ) IN W J P WH-1,2 MOUNTING 0
<br /> � �� =G -�� 3�D AI H K- 7 2- N I L L V A E 1, M RD ROOF DRAIN DF DRINKING FOUNTAIN TTACH SUPPORT TO BLOCKING DETAIL PQ (�
<br /> AERATOR GOOSE NECK FAUCET, BRASSCRAFT KTSR17FC STOPS & AD AREA DRAIN FHS FIRE HOSE STANDPIPE8xi LAGS FOR WOOD
<br /> B-16A SUPPLY HOSES PLUMBEX 2002 P-TRAP & ANGLE STOP F\;8x1- •sM SCREW FOR STEEL
<br /> INSULATI❑N. CB, DI CATCH BASIN (DROP INLET) INV INVERT ELEVATI❑N
<br /> MS-1 KOHLER WITBY ENAMELED CAST IR❑N MOP SINK, CORNER UNIT W/INTEGRALBLOCKING AS
<br /> CO CLEAN OUT FG FINISH GRADE 1/2' BALL VALVE y +�
<br /> K-6710 STRAINER AND DRAIN, PIPE, ZURN Z-841M1-RC-WHK-5H FAUCET. REQUIRED AD-1 c w v +�
<br /> COLOR BY ARCHITECT, I� WC❑ WALL CLEAN OUT CUT OFF P❑INT - CDP 12x12 MIN .y cru -0 a
<br /> CUT OPENING IN ROOF TRAP PRIMER FITTING m *' d x
<br /> AD-1 KARP DSC 214M GRAY PRIMERED ACCESS DORS - SEE DRAWINGS FOR TYPE OF PAINT TO MATCH -0 Q
<br /> FCO FLOOR CLEAN OUT POINT OF CONNECTION - POC MINIMUM 2" LARGER THAN PIPE 2-4 FLOOR DRAINS 3 3 L
<br /> LOCKING MECHANISM, UNLESS OTHERWISE NOTED, FURNISH DOORS ARCHITECTURAL SURFACES, REFER TO STRUCTURAL/ARCD DWGS �� u s w o o Q
<br /> WITH SLOTTED 1/4" LOCKS, MIN SIZE IS 12x12. COLOR BY 1s GA PIPE BRACE IF OPENING IS LARGER THAN 8"� 3/8' CU LINES �, 0 L r
<br /> ARCHITECT, YC❑ YARD CLEAN OUT AD ACCESS DOOR - SEE SCHEDULE FOR TYPE WITHIN 24' OF ROOF TO TRAP PRIMER Q w v m'3 c I c
<br /> DECK 2 REQUIRED ROOF UP THROUGH FITTING ON FD-1 o 5 � .2
<br /> TP-1 PPP INC, PR❑VIDE DU- ACCESSORY WHERE PRIMER IS USED FOR MORE THAN MOUNT IN WALL BEHIND FD FLOOR DRAIN CI CAST IRON E °
<br /> PR-500 PRIME ONE DRAIN, AD-1 WITH SOV. TRAP PRIMER 2 E S r •S
<br /> RITE � FS FLOOR SINK CENTER LINE PIPE CLAMZ PO c d 0
<br /> DETAIL a ;a c3a 0 Q O
<br /> FD-1 ZURN ZN415 TYPE B STRAINER FLOOR DRAIN, 2" OUTLET, TRAP PRIMER FITTING. TP TRAP PRIMER VALVE HDR HEADER VENT FLASHING 8 9 m y 2 v U)
<br /> � •- r-
<br /> CW, D, R — COLD WATER (DROP) (RISER) DN DOWN DETAIL PQ FOR FLOOR SINKS LOCATED m r m 3 3 m E
<br /> FS-1 ZURN 12x12 SANI-FL❑R RECEPTOR W/ALUM DOME STRAINER, MOUNT LIP 1" - FS-1 �
<br /> " U E v v v v v v v v UNDER WORK CABINETS
<br /> WH-1 S T WATER HEAT HW,D,R,RT— HW SUPPLY (DROP) (RISER) (RETURN) MBH THOUSANDS OF BTU PER HOUR1-4"
<br /> 2"
<br /> SUF100 95 . EQUIPMENT BASE TO BE
<br /> THW—T — TEMPERED HOT WATER (115° F) NIPC NOT IN PLUMBING CONTRACT GAS ANSUL VALVE INKCHED AROUND FLOOR
<br /> WH-2 STATE 120 MBH INPUT 60 GAL HOT WATER HEATER COMPLETE WITH ANODE, ABOVE CEILING
<br /> G, LPG— NATURAL GAS (PROPANE)<5PSI HW HAND WASH STATI❑N SEE PLAN FOR GRATE
<br /> ARRANGEMENT
<br /> WH-3 STATE 6 GALLON ELECTRIC WATER HEATER, 1650W, 208V 1PH, WITH ANODE OPERATING WT=80# PULL STATION - TYPICAL FLOOR SINK
<br /> HPG — HIGH PRESSURE GAS(PROPANE) >SPSI HS HOSE STATION MUNT ON WEST
<br /> END C❑❑KEINE w/DOME STRAINER Q
<br /> SEE DRWGS FOR
<br /> IWH-1,2,3 TAKAGI 510C SINGLE P❑INT USE INSTANTANEOUS HOT WATER HEATER, MODEL 510C, - CA COMPRESSED AIR HWG HOT WATER GENERATOR G) LOCATION PLAN VIEW W
<br /> 10 GPM, 80°F RISE, 120V, 1A. 199 MBH INPUT, SET LEAVING WATER HB HOSE BIBB BV BALL <5" BUTTERFLY >5" VALVE > W
<br /> TEMP AT 120°F MAX, FULL SIZE MIN. 1" AIR GAP REMOV. GRATE FOR
<br /> SEE GAS SIZES
<br /> FOR SOV, FOR EACH TO FLOOR SINK ACCESS TO CLEAN
<br /> © UNDER PLUMBING CONTRACT —SCW — SOFT C❑LD WATER LINE BRANCH SIZES T❑ TOP RIM DOME STRAINER
<br /> S A \^/- G N C PTA��'�E��A/�'�U ��_n_n_��_n_n_n_n_n_ EACH APPLIANCE GAS APPLINCE IN 0
<br /> C❑❑KEINE &1 EQUIP.
<br /> HWCP-1 B&G BRONZE BRONZE TRIM AND BRONZE IMPELLAR, SNAP ON AQUA STAT, SNAP ❑N INSTALL CIRCUIT SETTER S❑V SHUT ❑FF VALVE — SHW — SOFT H❑T WATER LINE
<br /> CIRCULAT❑R, TIMECL❑CK, 120V, 1/12 HP, 2 GPM@12' HD, IN LINE, SET AT 120°F GAS GAS GAS G.C. TO GROUT I FLUSHED WITH FLOOR O ICS
<br /> NBF-10S/LW M❑ FADER GAP BETWEEN SINK u J
<br /> STRAP-1 HOLDRITE WATER HEATER STRAP - ATTACH TO BLOCKING IN WALL WITH 12• AFF & FLOOR W0
<br /> QS-50 5/16"x3" LONG LAG SCREWS INCLUDED WITH KIT, SECTION _
<br /> WHS-1 HOLDRITE SUSPENDED WATER HEATER PLATFORM, MAX CAPACITY 40 GAL WH, FIXTURE CONNECTION SCHEDULE Q Z U Q
<br /> #40-SWHP MOUNT BOTTOM OF UNIT 7'0" AFF. SUSPENDE FROM FRAMING WITH PLUMBING SANITARY WATER GAS HEADER 9 E S-1 M❑U N T I N G 3 U
<br /> 1/2" ATR, ANCHOR WH-1 TO BLOCKING IN WALL USING 2 STRAP-1'S. FIXTURE SEWER VENT COLD HOT DETAIL P� DETAIL PO W
<br /> MAX SUSPENDED WT=375#. WATER CLOSET FV 3" 2" 1" -
<br /> LUG 2" BELOW FINISH
<br /> WATER CLOSET FT 3" 2" 1/2" - P
<br /> GRADE OR FLOOR u
<br /> PLUMBING NOTES GAS URINAL FV 2" 1-1/2" 3/4" - 3/4' HWS (E)ROOF TRUSSES
<br /> 5 PSI SERVICE - 2-1/2" AND SMALLER SHALL BE SCH 40 3/4' CWS - 24" OC
<br /> URINAL FT 2 1-1/2 1/2 - ROAD PAVEMENT WHERE LL 0
<br /> ALL WORK SHALL CONFORM TO THE FOLL❑WING CODES; GI SCREWED PIPE AND FITTINGS. 3" AND LARGER SHALL BE SEE DETAIL 'A' SEE DETAIL 'A' APPLICABLE ( n
<br /> SCH 40 WELDED PIPE AND FITTINGS, EXPOSED PIPE SHALL LAV 2" 1-1/2" 1/2" 1/2" FOR ATTACHMENT FOR ATTACHMENT v O
<br /> BAR SINK 2" 1-1/2" 1/2" 1/2" 1/2'x3" LAG BOLT SOV SOV TO STRUCTURE TO STRUCTURE 6" THICK 3RI DIAMETER a.
<br /> 2016 CBC BE GALVANIZED, BURIED PIPE SHALL BE COVERED WITH oNCRETE RING WITH z
<br /> CLASSROOM SINK 2" 1-1/2" 1/2" 1/2" TO BL❑(KING IN WAL 1-#4 BAR IN CENTER
<br /> 2016 CPC X-TRU C❑AT, ALL PIPE INSIDE BUILDING SHALL BE EMBED 2' - -
<br /> 2016 CMC WELDED, KITCHEN SINK 2" 1-1/2" 1/2" 1/2" '
<br /> MOP SINK 3" 2" 3/4" 3/4" ; CONCRETE BOX LABELED SEWER
<br /> 2016 CEC 7" WC SERVICE - SCH 40 GALVANIZED IRON PIPE AND \ -I oR'
<br /> FITTINGS OUTSIDE BUILDING AND SCH 40 BLACK IRON PIPE TRAP PRIMER - - 1/2" - ® ® ® BRASS CLEANOUT Box
<br /> CONTRACTOR SHALL KEEP ALL INSTALLATION INSTRUCTIONS INSIDE BUILDING. PAINT WHERE EXPOSED TO INTERIOR - - IN FINISHED FLOOR
<br /> FD -2" 2" 1-1/2" 18 GAx2` WIDE STRAP � i /
<br /> FOR PLUMBING FIXTURES, ACCESS DORS, SEALING FINISHES. FD-3" 3" 2" - _ LOCATE 12' FRO i �� s"� PVC SLEEVE WITH 4"�
<br /> TOP OF TANK � CLEANOUT RISER PIPE
<br /> MATERIAL, FIRE STOPPING, ETC, ONSITE IN WATERPROOF FLOOR SINK 2" 2" 1-1/2" - -
<br /> POUCHES FOR THE INSPECTING AUTHORITY FOR THEIR TEST 7-11" WC GAS AND LPG LINES USING AIR AT 15 PSIG FLOOR SINK 3" 3" 1-1/2" - - 3/4" TPR LINE B-LINE VIBRACLAMP - BVT _ LONG SWEEP 'L'
<br /> 12' AX SERIES CLAMP TO BE USED ON 90 DEGREE
<br /> REVIEW, OBSERVE FOR 24 HOURS FOR LEAKAGE. TEST ALL GAS SHOWER- RES. 2" 1-1/2" 1/2" 1/2" TO MS--'-,,, 21• AX ALL COPPER PIPE AND
<br /> LINES WITH HIGHER PRESSURES THAN 11" WC AT 1,5 TIMES EYEWASH 2" 1-1/2" 1/2" - FITTINGS INVERT - SEE PLAN
<br /> INSULATION W/ WHITE ASJ FOR SIZES
<br /> PLUMBING CONTRACTOR SHALL SUBMIT 7 SETS OF WORKING PRESSURE, MINIMUM PRESSURE OF 50 PSIG, HOLD - - - - - WHERE REQUIRED - INSTALL
<br /> SUBMITTALS FOR REVIEW AND COMMENT BY THE ENGINEER TEST FOR 24 HOURS. SET TER HEATER IN ALUMINUM JACKET WHERE SEE PLUMBING FLOOR
<br /> AND ARCHITECT OF RECORD FOR THE FIXTURES LISTED AND DR N PAN - RUN EXPOSED TO THE WEATHER, PLAN FOR SIZE
<br /> DRA AND DAYLIGHT PROVIDE LABELS FOR
<br /> PROJECTTHE ERIAL TO BE USED AND HALL MAKE THE APPROPRIATON THIS FIXTURES E CHANGES AS ROUGH IN ALL ACCESSIBLE FIXTURES PER THE DETAILS OVER MS- 6' IN ERVICE AND FLOW DIRECTION CLEANOUT T❑ GRADE 4
<br /> IWH-1 CW/HW W/MIN 1" HIGH LETTERS
<br /> DIRECTED BY THE ENGINEER AND ARCHITECT AT NO FOUND IN CBC CHAPTER 11, THE ARCHITECTURAL DRAWINGS AND GAS PD
<br /> ADDITI❑NAL COST TO THE OWNER, AND LOCAL CODE REQUIREMENTS, NOTIFY ARCHITECT IN MOUNT N48' DETAIL
<br /> WRITING OF CONFLICTS, AFF PLUG 2" BELOW FINISH
<br /> MATERIALS: W -3 ON PLATFORM PER
<br /> GRADE OR FLOOR
<br /> DETAIL 12/P0.
<br /> (N 4 6 (t 6 1 -
<br /> COLD AND HOT WATER SUBMITTALS i ROAD PAVEMENT WHERE
<br /> TYPE 'L' COPPER ABOVE GROUND AND TYPE 'K' BELOW, PR❑VIDE SEVEN SETS OF SUBMITTALS FOR REVIEW, 3 ci INTEGRAL GAS APPLICABLE
<br /> FURNISH SHUTOFF VALVES WHERE SHOWN, SHUT OFF 3/4' T&P RELIEF = VALVE AND 6" THICK 36" DIAMETER W
<br /> VALVES SHALL BE BALL TYPE WITH TEFLON SEATS, INSTALLATION - SPILL PLANTER
<br /> rp,
<br /> EX ASSEMBLY WH-3 MOUNTING 11 1-s/8'UNISTRLIT ONCRETE RING WITH
<br /> IN PLANTER 1/2' ALL THREAD ROD 1-#4 BAR IN CENTER
<br /> STAINLESS STEEL BALL, AND DOUBLE ❑-RING STEM 1/4 BRACE ALL PIPE AND DUCT SYSTEMS PER SMACNA SEISMIC DETAIL PO (ATR) WITH DOUBLE NUT
<br /> TURN. VALVES TO BE RATED FOR WOG SERVICE. PR❑VIDE RESTRAINT GUIDELINES INCLUDING CHANGES OF DIRECTION 1' H&CW LINES AND LOCK WASHER AT AT CONCRETE sox LABELED SEWER
<br /> DIELECTRIC UNI❑NS AT ALL DISSIMILAR METAL C❑NNECTI❑NS, AND CHANGES IN ELEVATI❑N OF MORE THAN 10', FROM 1-1/4' INE - SEE STRUT AND ANGLE CLIP oa
<br /> INSULATE HOT WATER SUPPLY AND RETURN LINES W/1" HEADER TO IWH-1 6' DRIP LEGFOR SIZES SEE DETAIL 'A' BRASS CLEANOUT BOX ( )
<br /> LINE SIZE AND ROUTING FOR ATTACHMENT SEE DETAIL 'A' IN FINISHED FLOOR lJ J
<br /> FIBERGLASS ASJ MEETING THE REQUIREMENTS OF T-24 CPVC INSTALLATION ; © TO STRUCTURE FOR ATTACHMENT Li Q W
<br /> MANDATORY FEATURES, INSTALLATION OF CPVC FOR NEW AND REPLACEMENT TO STRUCTURE L PVC SLEEVE WITH 4"�
<br /> IWH— PIPING DETAIL 13 (E)ROOF FRAMING - 2x6 �� 0 �� CLEANOUT RISER PIPE
<br /> SYSTEMS MUST COMPLY WITH THE REQUIREMENTS AS STATED DETAIL PO WOOD JOISTS, 24' ❑C
<br /> SCH 40 CPVC BELOW GRADE OUTSIDE, SIZE AS INDICATED IN CHAPTER 6 AND INSTALLATI❑N STANDARDS IAPM❑ "
<br /> ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE HIS IS-20-2005, ALL PROCEDURES MUST BE FOLLOWED FOR A STRAP-1 W/ (6)#12X1TEK SCREWS INTO 16x8' GA GI 2WAY CI IAPMO --1U LL-1O
<br /> WORK WITH OTHER TRADES, CONTRACTOR SHALL DISINFECT FLUSHING AND WORKER SAFETY MEASURES. INCLUDED ARE - BACKING PLATE - DO NOT ® ® APPROVED CLEANOUT a_ � C:) Z
<br /> WATER LINES PER AWA GUIDELINES AND PR❑VIDE THREE THE PENALTIES AS STATED ON CHAPTER 6 (g), ANY USE DRILL TYPE SELF INVERT E SEE PLAN
<br /> C❑PIES FROM AN INDEPENDENT TEST LAB. WATER SHALL BE CONTRACTOR OR SUBCONTRACTOR FOUND TO HAVE FAILED TO -11' TAPPING -- FOR SIZES
<br /> 14 GA GI BACKING LATERAL OR L❑NGITIDUNAL BRACE - SIZE SEE PLUMBING FLOOR
<br /> TESTED FOR WATER BORNE BACTERIUM, SPORIDIUM AND COMPLY WITH THE VENTILATION GLOVE OR FLUSHING PLATE BLOCKING AND SPACING PER SMACNA TABLES PLAN FOR SIZE
<br /> OTHER PATHOGENS AT THE TIME OF OCCUPANCY AND REQUIREMENTS OF SECTION 1,22 OF APPENDIX I OF THIS STEEL STUD -3/4" PLYWOOD. ATTACH TO 5-7,6-7- OR 7-7 OR CPC TABLE 3-1 AND
<br /> CERTIFY THE SYSTEM PASSED THESE TESTS, CODE, INSTALLATI❑N STANDARDS FOR (PVC SOLVENT FRAMING FRAME W/ 8d AT 6" 3-2. BRACE ONLY REQUIRED WHEN PIPE
<br /> CEMENT HOT AND COLD WATER DISTRIBUTION SYSTEMS, 2x4 FRONT LEDGER O.C.(EDGE) & 12" O.C. IS MORE THAN 12" BELOW STRUCTURE 2-WAY CLEANOUT j �S\ON A� F,L
<br /> W/2(3) 3/8" LAG (FIELD) DETAIL
<br /> TEST WATER LINES AT 1,5 TIMES WORKING PRESSURE FOR IAPM❑ IS-20-2005 SHALL BE SUBJECT TO THE PENALTIES BOLTS INTO LEDGER ( 2.2x1/4"x2" LONG ANGLE P� qL
<br /> LEAKS, NOT TO EXCEED 100 PSIG, HOLD PRESSURE FOR 24 ON HEALTH AND SAFETY CODE, DIVISI❑N 13, PART 15 W/2-1/2" EMBEDMENT CLIP - ATTACH AT
<br /> HWCP-1
<br /> 2x4 LEDGER W/ MIDPOINT OF PURL❑IN
<br /> HOURS. CHAPTER 6 SECTION 17995, 14 GA GI BACKER PLATE HANGER ROD - SEE CPC TABLE 3-1
<br /> 6 12X3" TEK WITH 1/2' x2` LONG LAG ET-1 - 1 GALLON "
<br /> O# 2x4 LEDGER ❑R SMACNA SEISMIC RESTRAINT * �c�
<br /> BOLT, EMBED 1-1/2' MIN. EXPANSION TANK
<br /> SCREWS INTO 16x8" GUIDELINE TABLES 5-7,6-7 OR 7-7
<br /> SEWER AND RWL'S - ABS PIPE AND FITTINGS ABOVE AND IN ADDITION IF DURING THE CONDUCT OF ANY BUILDING NO. M29759 Q
<br /> GA GI BACKING PLATE FOR HANGER ROD SIZES AND CPC
<br /> BELOW GRADE, CI PIPE WITH ESCUTCHEONS WHERE INSPECTI❑N, THE BUILDING OFFICIAL FINDS THAT THE - DO NOT USE DRILL CLOSET TABLE 3-2 F❑R SPACING.�� BRACE T❑ RISE T❑ RUN REN. 6-30-18
<br /> (3)#10X3/4" SELF TAPPING 9
<br /> PROHIBITED BY CODE AND THE LOCAL JURISDICTI❑N, VENTILATION AND GLOVE REQUIREMENTS OF SECTION 1,2.2 TYPE SELF TAPPING WI TH PAN HEAD SCREWS THRU (SL SHALL BE N❑ CW
<br /> CLEAN❑UTS SHALL BE PROVIDED EVERY 100 FT AND AT OF APPENDIX I OF THIS CODE, SPECIAL REQUIREMENTS FOR 2x4 6'8 AFF BACKING PLATE AT EACH DOUBLE NUT AT HANGER MORE THAN 21 OR NO IN OF C PP,
<br /> EACH CHANGE OF DIRECTI❑N GREATER THAT 909. USE OF CPVC INSTALLATION WITHIN RESIDENTIAL BUILDINGS ARE WH-1 WATER MEATAL STUD INSULATION W/WHITE ASJ LESS THAN 1.2 CV BV
<br /> HEATER T❑
<br /> ABS PIPE IS LIMITED TO BUILDINGS 2 OR LESS ST❑RIES IN BEING VIOLATED, BUILDING OFFICIAL SHALL CITE THE FOR PIPE 1-1/2' AND SMALLER OR WH-1
<br /> 3/4" CALSILICA SUPPORT WHERE DOUBLE NUT AND WASHER
<br /> HEIGHT AND CANNOT BE USED WITHIN FIRE RATED CONTRACTOR OR SUBCONTRACTOR FOR THE VI❑LATI❑N UNDER PLYWOOD (E) FLOOR SLAB REQUIRED - INSTALL ALUMINUM
<br /> ASSEMBLIES. ALL SEWER LINES SHALL BE SLOPED AT A THE CALIFORNIA PLUMBING CODE. TOP JACKET WHERE EXPOSED TO THE DOUBLE NUT AND WASHER__ DRAWN: NR
<br /> MINIMUM OF 1/4" PER 1'. 7WEATHER, PROVIDE LABELS FOR ET-1, HWCP-1 PIPING 6
<br /> SERVICE AND FLOW DIRECTI❑ DETAILPO DATE : SEPT. 18, 2019
<br /> S
<br /> VENT LINES - SEE SEWER LINES. W/MIN 1' HIGH LETTERCLEVIS HANGER JOB # 2018-026 REVISED : NOV. 10,2019
<br /> HVAC CONDENSATE DRAIN LINES - TYPE 'M' COPPER PIPE CLEVIS HANGE D ETA L 'A'
<br /> AND FITTINGS INSIDE BUILDING AND SCH 40 PVC PIPE SECTION 'A/ GDMD ENGINEERING, INC
<br /> OUTSIDE BUILDING, PR❑VIDE CLEANOUT AT EACH CHANGE
<br /> OF DIRECTI❑N AND AT COIL CONNECTI❑N. PIPE SUPPORT HANGER AND T R A P E E Z E - WOOD 1 Mechanical and Safety Engineers
<br /> TEST SS AND RWL'S DRAIN LINES PER SECTION 7022 AND WATER HEATER SHELF ERAMING PLAN 12 DETAIL 212 W Pine St, Ste 4
<br /> 11062.2 RESPECTIVELY. TEST CONDENSATE DRAIN LINES DETAIL Lodi, Ca 95242
<br /> PO
<br /> USING SECTI❑N 1106,2,2 Ph 209-367-0899 P 0
<br /> Fax 209-367-0898
<br /> E-mail:gdmdengrinc@sbcglobal.net