Laserfiche WebLink
Mitigation Measure No. 64: <br />--ea cleaning. <br />,monitoring Agency: <br />Monitoring Schedule: <br />Agency responsible for <br />Ensuring Compliance: <br />Reporting Requirements: <br />Mitigation Measure No. 6-5: <br />and equipment washdown. <br />Monitoring Agency: <br />Monitoring Schedule: <br />Agency responsible for <br />Ensuring Compliance: <br />_porting Requirements: <br />Attachment B <br />A street sweeper should be used for road and paved <br />Northern Region <br />San Joaquin Valley Unified Air Pollution Control <br />District <br />Periodic during operations. <br />Local Enforcement Agency <br />San Joaquin County public Health Services <br />Periodic under the Air Pollution Control District <br />Permit to Operate. <br />A water recycling system should be utilized for truck <br />Environmental Health Division <br />San Joaquin County Public Health Services <br />Review of Construction Documents (Plans and <br />Specifications) <br />Environmental Health Division <br />San Joaquin County Public Health Services <br />Certificate of Occupancy <br />Mitigation Measure No. 6-6: Landscaping should utilize drought tolerant plants <br />and use water efficient irrigation. <br />Monitoring Agency: Development Services Division <br />San Joaquin County Community Development Dept <br />Monitoring Schedule: Review of Construction Documents (Plans and <br />Specifications) <br />Agency responsible for Development Services Division <br />Ensuring Compliance: San Joaquin County Community Development Dept <br />Reporting Requirements: Certificate of Occupancy <br />Mitigation Measure No. B -L- Design the structure in conformance with all <br />applicable building codes to support the anticipated earthquake loads. If strong ground <br />shaking occurs during construction, repairs may need to be performed at that time. <br />Monitoring Agency: Building Inspection Division <br />San Joaquin County Community Development Dept <br />MMP: 7-93 B11 Page 4 of 9 <br />