Laserfiche WebLink
Agency responsible for <br />Ensuring Compliance: <br />...eporting Requirements: <br />Attachment B <br />Air Pollution Control District <br />Air Pollution Control District compliance report. <br />Mitigation Measure No. 114: Limit noise-Qenerating construction activities to the <br />hours of 7:00 a.m. to 5:00 p.m., Monday througK Friday. <br />Monitoring Agency: Building Inspection Division <br />San Joaquin County Community Development Dept. <br />Monitoring Schedule: Periodic, during construction. <br />Agency responsible for Environmental Health Division <br />Ensuring Compliance: San Joaquin County Public Health Services <br />Reporting Requirements: Environmental Health compliance report <br />Mitigation Measure No.11-2c During construction, locate fixed or portable noise <br />sources, such as air compressors and concrete pumpers, as far as possible from the <br />property line. <br />Monitoring Agency: Solid Waste Division <br />San Joaquin County Department of Public Works <br />`onitoring Schedule: Periodic, during construction <br />Agency responsible for Development Services Division <br />Ensuring Compliance: San Joaquin County Community Development Dept. <br />Reporting Requirements: None required. <br />Mitigation Measure No. 11-3: EcJuip all internal combustion engine -driven <br />equipment with mufflers which are m good condition. <br />Monitoring Agency: Northern Region <br />San Joaquin Valley Unified Air Pollution Control <br />District <br />Monitoring Schedule: Included in Permit to Operate <br />Agency responsible for Air Pollution Control District <br />Ensuring Compliance: <br />Reporting Requirements: Periodic Air Pollution Control District on-site <br />inspections as part of Permit to Operate <br />Mitiggaation Measure No.12-L- Confine the waste handling op��ation to the Transfer <br />Raulding. All doors, windows, and unsQeened openings should remain closed unless <br />wally in use. <br />MMP: 7-6-93 B-7 Page 7 of 9 <br />