My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0039719
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
134
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0039719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2021 4:57:47 PM
Creation date
10/28/2021 8:13:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0039719
PE
4373
STREET_NUMBER
134
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95337-
APN
20014012
ENTERED_DATE
6/18/2019 12:00:00 AM
SITE_LOCATION
134 N AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geocon will retain Cascade Drilling (C574 9381 10) and McMillan's Well Service, LLC. for the well <br /> destruction activities. Prior to destruction activities, the pump assembly will be removed and disposed of <br /> properly. The field staff will note the material of the casing, measure the diameter of the well, depth to <br /> groundwater, and total depth of the well. Measurements will be used to confirm specifications for wells <br /> that have well construction records. Measurements from wells with unknown specifications will be used <br /> to create well specifications. At each well, Cascade will perforate the well casing using depth-discrete <br /> explosive charges packed with projectiles. Explosive charges connected to detonating cord will be placed <br /> from the bottom of each well casing to the surface at 10-foot intervals. After the explosive charges are <br /> placed, a neat cement grout will be pumped into each well to the surface with tremie pipe. When the <br /> grout level stabilizes in each well, the charges will be detonated perforating the well casing and permitting <br /> neat cement to enter into the formation. Following blast perforation, additional grout will be added to <br /> each well as necessary. The following table summarizes the approximate amount of explosives and grout <br /> required for each well. <br /> Estimated Approximate Initial Grout <br /> Well ID Diameter Total Depth Estimated Amount of Volume <br /> (in) (ft bgs) Charges Required (gallons) <br /> 495 8 175 17 456 <br /> _ ........ . ... ... .. _..._... ._..._ ..._........... .............. _ __ ........................ ........... _. ..........................................................................._. <br /> 11717 6 170 17 249 <br /> -----........... . .. ... ......... _....... .... ........... ....... .I ... ............ ............... <br /> 17737 6 55 5 80 <br /> _ ........_.._._... . ....... .................................. .... ..... . ..... . .... _...................... <br /> 17821 6 115 11 168 <br /> -- - -............. _.__ ._.._._... .............-............_ ......—- _ ..... .. . ........ .......... .. ...___.. . ........ <br /> 17904 5.5 69.6 6 85 <br /> _. . ...__.._.. ....__ _ ..........................._......... <br /> 17926 4.75 69 6 63 <br /> 17933 _ 5.5 83 8 102 <br /> 17950 6 59 5 86 <br /> ....... _...... <br /> 17793 Unknown Unknown <br /> 17850 Unknown Unknown <br /> ...._. .....-___ _ ._...... <br /> 17883 Unknown Unknown 1 charge per 10 feet of well 5.8 gallons of grout per <br /> 17899 Unl<nOWn Unknown depth cubic foot of well volume <br /> 17911 Unlmown Unknown <br /> .......-_..... <br /> _............ _ <br /> 2145 Unknown Unl<nown <br /> Geocon Project No.S1358-03-05 -2- June 13;'019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.