My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0524783
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 4:31:19 PM
Creation date
11/1/2021 4:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524783
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0016638
FACILITY_NAME
GREIF STOCKTON
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
800 W CHURCH ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Additional Requirements for Destruction of Cathodic Protection Wells in Urban Areas. The <br /> following additional requirements shall be met at each well site in urban areas,unless otherwise <br /> approved by the enforcing agency: <br /> (1) The upper surface of the sealing material shall end at a depth of 5 feet below ground <br /> surface, and, <br /> (2) If the casing was not extracted during destruction and sealing operations,a hole shall <br /> be excavated around the well casing to a depth of 5 feet below ground surface after <br /> sealing operations have been completed and sealing materials have adequately set and <br /> cured. The exposed well casing shall then be removed by cutting the casing at the <br /> bottom of the excavation. The excavation shall then be backfilled with clean, native <br /> soil or other suitable material. <br /> G. Temporary Cover. The well borehole and any associated excavations shall be covered at the <br /> surface to prevent the entry of foreign material, water, pollutants, and contaminants and to <br /> ensure public safety whenever work on the well is interrupted by such events as overnight <br /> shutdown,poor weather,and required waiting periods to allow setting of sealing materials and <br /> performance of tests. The cover shall be held in place or weighted down in such a manner that <br /> it cannot be removed except by equipment or tools. <br /> -74- <br />
The URL can be used to link to this page
Your browser does not support the video tag.