Laserfiche WebLink
Geocon will retain Cascade Drilling (C574 938110) and McMillan's Well Service, LLC. for the well <br />destruction activities. Prior to destruction activities, the pump assembly will be removed and disposed of <br />properly. The field staff will note the material of the casing, measure the diameter of the well, depth to <br />groundwater, and total depth of the well. Measurements will be used to confirm specifications for wells <br />that have well construction records. Measurements from wells with unknown specifications will be used <br />to create well specifications. At each well, Cascade will perforate the well casing using depth -discrete <br />explosive charges packed with projectiles. Explosive charges connected to detonating cord will be placed <br />from the bottom of each well casing to the surface at 10 -foot intervals. After the explosive charges are <br />placed, a neat cement grout will be pumped into each well to the surface with tremie pipe. When the <br />grout level stabilizes in each well, the charges will be detonated perforating the well casing and permitting <br />neat cement to enter into the formation. Following blast perforation, additional grout will be added to <br />each well as necessary. The following table summarizes the approximate amount of explosives and grout <br />required for each well. <br />DiameterEstimated <br />Well ID <br />t�n) <br />Total Depth <br />ft b <br />( 5 g) <br />Estimated Amount of <br />Charges Required <br />Approximate Initial Grout <br />Volume <br />(gallons) <br />495 <br />_ . _........... ..... .. <br />8 ._.... ..... <br />175 <br />-..... __ . _. _. _.... _.................. <br />17 <br />... ........................... _ ......... __ <br />456 <br />........_ _ ..._-_... _..... _ _.. _._......... <br />11717 <br />6 <br />170 <br />17 <br />.. _. _.__ ... _.... <br />249 <br />17737 <br />-- <br />6 ..... <br />55 <br />5 <br />.......... .. ---.. _. <br />_................._ <br />80 <br />------- - -_._...... _....... - ...... _ <br />17821 <br />_... _-...._._ <br />6 <br />115 ....... <br />11 <br />_...... ....._._ _._........... ........ _............... <br />..... ........_. <br />168 <br />...... .. _-... ....... _............ .__................. <br />17904 ......... _ <br />.._... ___ 5.5 <br />69.6 <br />6 _...... ....... ...... _......... <br />_... <br />.. ................. 85 <br />17926 __............. <br />4.75 <br />69 <br />................ .... <br />_ 6 <br />_..................... .......... <br />_.......... 63 <br />17933 <br />--.._._... __..._... _....... _.. <br />---.._.....5.5 <br />83 <br />8 <br />..... _...................... .-..._..._..._._.__..._.....__...._.................. I.............. <br />............. .......................... _..... _..... <br />102 <br />_......-- - ..._ <br />17950 <br />- __._............... <br />6 <br />- <br />59 <br />...... --- _... <br />5 <br />__..... _ _._ ........ <br />.._....._........ ......... ......._......._...._................._._.... <br />.__.._........__...._ 86 <br />17793 <br />--....._.._........... <br />Unknown _. <br />Unknown <br />_....... _...... .11 - ........ .._._._... <br />17850 <br />- ---l- -- .... <br />Unknown <br />......... <br />Unknown <br />..-_.—._.... _.. <br />17883 <br />Unknown <br />Unknown <br />_..... __...... .-- <br />1 charge per 10 feet of well <br />5.8 gallons of grout per <br />17899 <br />Unknown <br />Unknown <br />depth <br />cubic foot of well volume <br />.. _. .. <br />17911 <br />_ _ <br />Unluiown <br />.._._...... .._. <br />Unknown <br />2145 <br />Unknown <br />Unknown <br />Geocon Project No. 51358-03-05 - 2 - June 13, 2019 <br />