Laserfiche WebLink
Drill Hole <br />--11111111-111111 E1111 <br /> 111111111111 _111111-111111 <br />Cement-Grout---IM <br />All drill holes will be advanced using <br />a truck-mounted drill rig usinghollow- <br />stem auger drilling methods. <br />All drill holes will be destroyed <br />immediately upon completion of <br />logging and sampling. Destruction <br />will occur by: <br />N.) <br />(-7! <br />ES- <br />C7I cement grout from the drill hole <br />G bottom to the ground surface. <br />1. Backfilling the hole using <br />DRILL HOLE DESTRUCTION DETAIL <br />11111 110 11M1111— m-m111111 <br />Gillson Trucking Facility <br />S2-J2 Engineering, Inc. <br />Stockton, California <br />Plate No. <br /> <br />BAJADA Geosciences, Inc. <br />Project no <br />1801 0111