Laserfiche WebLink
g . A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> h . The applicant shall install the following improvements prior to issuance of any building permits : <br /> 1 . Convert the intersection of 1 - 5 Southbound Ramps and Roth Road to an all -way stop <br /> controlled intersection . <br /> 2 . Install a " Trucks - No Right Turn " sign on Frewert Road at the intersection with Manthey Road <br /> and the project site driveway onto Manthey Road . <br /> i . The applicant shall pay the following fair share contributions prior to the issuance of any building <br /> permits : <br /> 1 . $ 186 , 468 for the realignment of Harlan Road and Roth Road corridor improvements . <br /> j . The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more . Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval , <br /> prior to release of building permit . ( Development Title Section 9 - 606 ) <br /> k . This project is subject to the NPDES Region -Wide Permit requirements and shall comply with the <br /> following conditions . Prior to release of the building permit , plans and calculations shall be <br /> submitted and approved by the Public Works Department — Water Resources Division ( 209 -468 - <br /> 3605 ) : <br /> 1 . Treatment : A registered professional engineer shall design the site to treat the 85th percentile <br /> storm as defined in the County ' s 2023 Storm Water Quality Control Criteria Plan ( SWQCCP ) . <br /> 2 . Hydromodification : A registered professional engineer shall design the site to comply with the <br /> volume reduction requirement outlined in the County ' s 2023 SWQCCP . <br /> 3 . Trash : A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County ' s 2023 SWQCCP . <br /> I . Prior to release of the building permit , the owner shall enter into an agreement with San Joaquin <br /> County for post-construction maintenance of stormwater quality facilities . <br /> m . Applicant shall file a Notice of Intent ( NOI ) with the State Water Resources Control Board ( SWRCB ) <br /> and comply with the State " General Permit for Storm Water Discharges Associated with <br /> Construction Activity " . The Waste Discharge Identification Number ( WDID ) , issued by SWRCB , <br /> shall be submitted to Public Works for file . Contact the SWRCB at ( 916 ) 341 - 5537 for further <br /> information . <br /> n . Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan ( SWPPP ) to Public Works . A copy of the approved SWPPP and all required <br /> records , updates , test results and inspection reports shall be maintained on the construction site <br /> and be available for review upon request . <br /> 3 . ENVIRONMENTAL HEALTH DEPARTMENT ( Staff Contact : [ 209 ] 468 - 3420 ) <br /> a . A soil suitability and nitrate loading study incorporating proposed staff and customer use shall be <br /> submitted to the Environmental Health Department , indicating that the area is suitable for septic <br /> system usage . The studies must be approved by the Environmental Health Department prior to <br /> issuance of building permit ( s ) . ( San Joaquin County Development Title , Section 9 - 1105 . 2 ( d ) ) . The <br /> fee will be based on the current schedule at the time of payment . <br /> PA-2100226 , Zone Reclassification No . PA-2100227 , & Use Permit No . PA-2100228 — Conditions of <br /> Approval 4 <br />