Laserfiche WebLink
SAN 10AQ U I N Environmental Health Department <br /> ----C O U N T Y Jasjit Kang, REHS, Director <br /> lVreatness grows here. Muniappa Naidu, REHS,Assistant Director <br /> 9 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng, REHS <br /> Melissa Nissim, REHS <br /> Steven Shih, REHS <br /> Michelle Henry, REHS <br /> February 22, 2022 <br /> To: San Joaquin County Community Development Department <br /> Attention: Giuseppe Sanfilippo Cll�d <br /> From: Aldara Salinas; (209) 616-3019 <br /> Environmental Health Special ist/A <br /> 'p�d� <br /> RE: PA-2100238 (UP), Early Consultation, S00014456 (2625) <br /> APN: 212-020-07, 12925 W. Bethany Rd., Tracy <br /> The following requirements have been identified as pertinent to this project. Other requirements may also <br /> apply. These requirements cannot be modified: <br /> 1. Applicant shall contact Robert McClellon, Program Coordinator, Small Public Water System <br /> Program, at (209) 468-0332, to determine if the proposed well can be permitted as a public water <br /> system prior to issuance of building permits. If a public water system is required, applicant shall <br /> submit a Small Public Water System preliminary technical report to the California State Water <br /> Resources Control Board, Division of Drinking Water (Water Board) at least six months before <br /> initiating construction of any water related improvement, as defined. The issuance of a permit to <br /> operate a small public water system by the local primacy agency (EHD) is prohibited without the <br /> concurrence of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br /> Drinking Water at (209) 948-3963 concerning the requirements for preliminary technical report <br /> submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, a <br /> permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to issuance of building permits. To issue a permit to operate, concurrence from the <br /> Water Board is required. A yearly permit to operate a public water system will be required by the <br /> EHD prior to sign off of the certificate of final occupancy (San Joaquin County Development Title, <br /> Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health <br /> and Safety Code, Section 116525 116570. <br /> 2. A soil suitability and nitrate loading study incorporating proposed staff and customer use shall <br /> be submitted to the Environmental Health Department, indicating that the area is suitable for <br /> septic system usage. The studies must be approved by the Environmental Health Department <br /> prior to issuance of building permit(s). (San Joaquin County Development Title, Section 9- <br /> 1105.2(d)). The fee will be based on the current schedule at the time of payment. <br /> The sewage disposal system shall comply with the onsite wastewater treatment systems <br /> standards of San Joaquin County prior to approval. A percolation test conducted in accordance <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />