Start of Construction(Month/Year): Gross Acres:
<br /> 3 End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
<br /> First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces):
<br /> Building Square Footage: Number of Dwelling Units:
<br /> Start of Construction(Month/Year): Gross Acres:
<br /> End of Construction(Month/Year): Net Acres(area devoted to buildings/structures):
<br /> 4 First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces):
<br /> Building Square Footage: Number of Dwelling Units:
<br /> Additional sheets for phasing information can be found on the District's website at www.valleyair.orarlSR.
<br /> M. Mn-Site Emission Reduction (Mitigation
<br /> Listed below are categories of possible mitigation pleasures for applicants to implement that will reduce a project's impact on air
<br /> quality. Check"Yes"next to any measure that will be utilized for this project,and please complete the corresponding page in this
<br /> form to identify specifics related to that measure, If a category is not applicable to the project,check"No"and provide justification
<br /> for not selecting the pleasure. Also,the applicant is encouraged to provide any mitigation measures including supporting
<br /> documentation that are not listed on this application form for District consideration. For reference,see www,valleyair.orgllSR for
<br /> potential additional miti iation measures.
<br /> Clean Construction Fleet Mitgation Measure below can be selected for all development types
<br /> 1.Clean Construction Fleet(Note:Making a commitment to using less polluting construction equipment)
<br /> ❑ Yes,please complete mitigation measure 1 below
<br /> ❑X No,please provide justification why not selected:Project is limited in size and construction time,unknown contractor
<br /> Operational Mitgation Measure below can be selected for all development types,except for transportation and transit projects
<br /> 2.Clean On-Road Trucks (e.g.Heavy Duty Trucks,Medium Duty Trucks,and Light Duty Trucks)
<br /> Note: Operational fleet will use zero and/or near-zero emissions for all or part of its activities.
<br /> ❑ Yes,please complete applicable mitigation measure 2a through 2c below
<br /> ❑X No,please provide justification why not selected. Project intended to only provide parking for trucks
<br /> 3.On-Site Zero Emission Off-Road Vehicles and Equipment(e.g. electric forklifts and electric yard trucks)
<br /> ❑ Yes,please complete applicable mitigation measure 3 below
<br /> X❑ No,please provide justification why not selected: Project intended to only provide parking for trucks
<br /> 4.Solar Panels(e.g. incorporate solar panels in the project)
<br /> ❑ Yes,please complete applicable mitigation measure 4 below
<br /> ❑ No,please provide just(cation why not selected.-
<br /> 5.
<br /> elected:5.Electric Vehicle(EV)Chargers(e.g.incorporate onsite EV charging infrastructure)
<br /> ❑ Yes,please complete applicable mitigation measure S below
<br /> Q No,please provide just f cation/why not selected; No solar panels are proposed,as no new or expanded buildings are proposed
<br /> 6.Clean Lawn and Garden Equipment(e.g.eletric mowers,electric leaf blowers,electric trimmers,etc.)
<br /> ❑ Yes,please complete applicable mitigation measure 6 below
<br /> 0 No,please providejustifrcation why,not selected. project intended to only provide parking for trucks
<br /> 7. Land Use/Location (e.g, increased density,improve walkability design, increase transit,etc.)
<br /> ❑ Yes,please complete applicable mitigation measures 7a through 7f below
<br /> Q No,please provide justification why not selected., Project is truck terminal in rural area;no nearby urban development
<br /> 8. Neighborhood/Site Enhancements(e.g.improve pedestrial network,traffic calming measures,NEV network,etc.)
<br /> ❑ Yes,please complete applicable mitigation measures 8a through 8c below
<br /> ❑X No,please provide justification why not selected: Project is truck terminal in rural area;no nearby urban development
<br /> 9. Parking Policy/Pricing(e.g.parking cost,on-street market pricing,limit parking supply,etc.)
<br /> ❑ Yes, please complete applicable mitigation measure 9a through 9e below
<br /> ❑X No,please provide justification why not selected: Project intended to provide parking for trucks; parking programs not available
<br /> 10. Commute Trip Reduction Programs(e.g.workplace parking charge,employee vanpool/shuttle,ride sharing program,etc.)
<br /> ❑ Yes,please complete applicable mitigation measures IOa through IOf below Project does not include typical work hours and associated
<br /> © No,please provide just(cation why not selected: commute patterns.Therefore,project does not warrant parking and trip reduction programs.
<br /> 11, Hearth(e.g.woodstoves or fireplaces)
<br /> ❑ Yes,please complete mitigation measure I I below
<br /> X❑ No,please provide justification why not selected: Project does not include tivoodstoves or rrreplaces.
<br /> 12. Exceed Title 24(e.g.exceed California Title 24 required energy efficiency for building(s)associated with the project)
<br /> ❑ Yes,please complete applicable mitigation measures 12 below
<br /> Q No,please provide justification why not selected. Project will comply with Tile 24 as required.
<br /> Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 WWW.valleyair.orollSR
<br /> Page 3 of 13 Revised August 30,2022
<br />
|