My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014455
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
212
>
2600 - Land Use Program
>
PA-2100228
>
SU0014455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 7:35:14 AM
Creation date
11/2/2021 10:16:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014455
STREET_NUMBER
212
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
APN
19123011, 12, 14
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
212 W FREWERT RD
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emissions Estjmator Worksheet <br /> AppGcantlBusiness Name: 0960 Freight Lines,Inc. <br /> Project Nacre: DBBC Freight Lines Truck Terminal <br /> Project Location: 150 W.Frewert Road in Lathrop <br /> Oistrict Project 16 NO.: 20230309 <br /> Project Construction Emissions <br /> Ir applicant selected Construction fll an Fleet Mitigation Measure-Please select"Yes"from dropdown menu No T <br /> NOx PM10 Total Achieved 0-Site Reductions Itons} <br /> Achieved Required Achieved tD-DDOO <br /> Unmitigated Mitigated Unmitigated Mitigated <br /> Project ISR Con stmeti°n On ilt4 off-site Erniuion Reductions On-site Emission Reductions <br /> Baselinet9 So"Im D7 m n, rn Baseiinei'7 Baselin em m 39 [3R Phase NOs PM10 <br /> Phase Name Phase Start Date Reductions Reductions Required by Ruk Reductions Required by Rule <br /> Upy) crpn (tons} (tons) (rpy) R1°') (t-,l <br /> OSBG Raght Lines,Inc, 1 Vlyd024 0.5332 0.5332 DWoo 0.1066 0.fom 0.0249 46249 0.0000 401t2 1 OA000 0.0000 <br /> 2 MODDD 0.0009 0.u0Do D.D000 au" 2 0.0210 0.0000 <br /> 3 40000 40900 0.DWD 0.0000 0.0000 0.0000 0.0000 <br /> 4 0.0000 0.00DD 0.0000 D.D000 0.0000 4 0.0000 oJ3030 <br /> 5 0.0000 0.0000 0.4600 0.0000 0.0006 5 0.{7000 1 0.0000 <br /> 6 44000 mODDO 0.0r100 D.0600 DDnw 40000 6 09000 4[1000 <br /> T acow e.W00 0.0000 00067 1)n000 k00W 7 0.0000 0.0000 <br /> a 0.0000 0.0000 0.0000 a 0.0000 0.0000 <br /> 9 0.0000 0.0000 0.4000 0.4000 D.D000 0.0000 9 0.0000 0.0000 <br /> lD mWW 0.0000 D.W00 D.ODW D.11000 O.DDDD 10 0.0000 0.0000 <br /> Total 0.5332 1 0.5332 1 0.0000 1 0.1066 0.1066 4.0249 0.0249 6.13601) 0.0112 1 0.112 Total 0.0210 0.0000 <br /> Project Operations Emissions(Area+Mobile) <br /> NOx PMI O Total Required Offsite Reductions(tons) <br /> Average Average <br /> Achieved Required TORI Annual Achieved Required Total Annual <br /> Unmitigated Mitigated Emission Ltnmitgated Mitgaletl Emission <br /> Plot ISR Operation on�ite orf-sae Emission on-site off-site Emission <br /> Baserneni SaselineN Redactions easeffneni Baselinem Reductions <br /> ISR Phase NOs PM10 <br /> Phase Name Phase Start Date Reductionsn7 Reductions76i Retluctianz Reductions^7 Reductionsjl7 Reductions <br /> UPY) fTPY) (tons) (inns Required by Required by UPh'7 (TPYI Required by Required 6 <br /> Ru[eas (tons) [tons] Ruletq y <br /> Ru1em R�m <br /> 1 60000 40000 0.0000 0.0000 0.0000 4.0000 0.0000 0.0000 1 0.1065 0.0312 <br /> DBBC Fr6glt Lina.Inc(KI-HHO•HHD) 2 121V2024 219,1 21961 0.0210 14566 5.4776 0.5476 0.0900 0.0970 mom 0.45W 0.4500 0.0450 2 5.4568 0.4500 <br /> 3 Mom Lom 0.0000 O.OWD 9.0000 D.DIM D.DD00 u.ouuo 3 0.0000 0.0000 <br /> 4 6umo 0.0000 (0)" me" D.gWO O.aWO D.0000 umaw 4 0.0000 0.0000 <br /> 5 mowu 0.o00D 0.00m 0.0000 mown moow D.D000 0.0000 5 0.0000 0.0000 <br /> 6 0.00m O.Oom mom 0.0000 o.o00o 4.0000 4.0000 400011 6 0.0000 0.0000 <br /> 7 m0000 0.0000 O.D000 0.D000 0.0000 4.0000 0.4000 0.0000 7 0.0000 0.0000 <br /> a maw] 0.00Do 0.0000 mom 0.01700 mOD00 O.ODDO 0.0000 6 0.0000 4.0000 <br /> 9 0.0000 O.00DO 40om amw 0.000D (I-Cow wwoo OoDOD 9 0.0000 73.0000 <br /> ,c D.0000 40000 mom D-now 0.0000 00000 O.ODDO O.00DO 10 09000 a.6oao <br /> Total 2.1911 2.1883 0.0210 5A568 5.4778 0.5478 O.asoo G.MG 0.0000 0.4500 0.4500 0.0450 Total 5.5634 0.4612 <br /> Notes: <br /> TPY.Tons Per Year <br /> 1n Unmitigated Baseline: The project's baseline emissions generated with no do-site emission reduction measures. <br /> 121 Mitigated Baseline: The project's baseline emissions generated after on-site emisison reduction measures have been applied_ <br /> 1�1Achieve7d Dn-site Reductjons: The project's emission reductions achieved after on-site emission reduction measures have been applied. <br /> 141 Required Off-site Reductions: The projects remaining emission reductions required-by Rule 951 D if on-site emission reduction measures did not achieive the required rule reductions. <br /> 151 Emission Reductions Required by Rule: The project's emission reductions required(20%NOx and 45%PM10)for construction from the unmitigated baseline. <br /> 1st Total Emission Reductions Required by Rule: The project's ernission reductions required(33.3%NOx and 501%PM10)for operations from the unmitigated baseline over a 10.year period. <br /> 171Average Annual Emission Reductions Required by Rule: The project's total emission reduction for operations required by Rule 9510 divided by 10 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.