Laserfiche WebLink
Proposal & Cost Estimate <br /> Ota A CGRS <br /> ENI i.n NCeu i_r., , i, ui_ It _ 1 . Iio N CGRS Contact: Tahtia Pearce 916-616-2233 <br /> tpearce@cgrs.com <br /> Date: May 21 , 2020 Customer Name: A & S Engineering <br /> Facility: BP/Arco Address: 28405 Sand Canyon Road #B <br /> Address: 2510 S. Stale Hwy 99 West City, State, Zip: Canyon Country, CA 91387 <br /> City, State, Zip: Stockton, CA 95205 Contact: Robert Velasco <br /> County: San Joaquin Telephone/Email: 818-746-6986/roberiv@asengineer.com <br /> Scope of Work <br /> Perform pre and final ELD testing services at the above referenced location. Material costs are not Included for iota test a clops, however they will be Installed <br /> by the fuel system installation contractor prior to CGRS arrival for pretesting. In addition, this estimate is based on our u nderstanding of the fueling system, <br /> which is as follows: <br /> 1 . Tanks - (1) 25k and (1) 12k/10k split double wall UST's - Brine filled <br /> 2. Sumps - (6) containing upper tank fillings and components <br /> 3. Under Dispenser Containment (UDC) - (8) <br /> 4. Vent and other Transition Sumps - (1) <br /> 5. Piping - (3) Product line(s) (DW FRP), (3) vent Iine(s) (DW FRP) and (1 ) vapor rec line (DW FRP) <br /> Costs for all testing work Is based on our current fee schedule. Costs for the final ELD/IolaVislonr" testing assume that at I site work can be completed within 8 <br /> hours on site. If the work lakes longer than the specified time due to no fault of CGRS, additional hourly fees will be incu red on a time and materials basis in <br /> accordance with our current fee schedule. <br /> Helium Pre-Testing (Accept O / Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Primary System 1 gat rate $ 21250.00 $ 21250.00 <br /> 2 Helium " 1 bottles $ 298.88 $ 298.88 <br /> 3 Mobilization & Perdiem 1 flat rate $ 750.00 $ 750.00 <br /> 5 Min 112 charge for repair returns 0 days $ - $ - <br /> 6 Additional beyond 1 day Per them (per man) 0 days $ 185.00 $ - <br /> 7 Additional hours beyond 8 hour day (per man) 0 hours $ 275.00 $ - <br /> Subtotal $ 3,298.88 <br /> Optional Pre-Testing on Secondary Pipe (AcceptO / Decline 0) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 Test Secondary Pipe 1 day $ 800.00 $ 800.00 <br /> Subtotal $ 800.00 <br /> Final Enhanced Leak Defection (ELD) Testing (AcceptO / Decline O) Initials <br /> Item No. Description Quantity Unit Price Extended <br /> 1 System Testing (Final ELD) 1 flat rate $ 61546.88 $ 6,548.88 <br /> 2 Project Permitting & Admin Fee 1 flat rate $ 300.00 $ 300.00 <br /> 3 Mobilization & Perdiem 1 Bat rate $ 750.00 $ 750.00 <br /> 4 Additional beyond i day Per diem (per man) 0 days $ 185.00 $ <br /> 5 Additional hours beyond 8 hours (per man) 0 hours $ 275.00 $ - <br /> Subtotal $ 71598.88 <br /> The Standard Terms and Conditions attached are incorporated by reference and form part of this Agreement. By signing this Ag reement, you accept the <br /> proposal and acknowledge that you have read, understand and agree to the Standard Terms and Conditions set forth in this Agra ement. <br /> Accepted by Date <br /> Printed Name Title <br />