My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Good afternoon Carol, <br />Hope this e-mail finds you all well in all aspects specially healthy & safe nowadays. Below please find the <br />link you may use to access the following documents we would like to respectfully re -submit to your <br />office for review & to address required items in order to obtain CUPA Permit/Approved Plans for <br />proposed installation of new ust's & related upgrades/improvements to be completed at the subject <br />facility (please download the files as soon as possible, the link never expires but when a long time goes <br />by without accessing/downloading the files with the link, they might no longer be available); <br />https://asengineering.sharefile.com/d-s5bdda85d3b3d4e269dba6lle5el80a54 <br />• Updated UST Installation Permit Application <br />• Contractors documents & certifications for Savidge Construction Inc. <br />• Complete manufacturer's cut sheets for all proposed ust system components <br />• Complete set of updated plans for review/approval for proposed installation of new ust's & <br />related upgrades/improvements <br />Below please also find plan check comments received including responses; <br />1) Page 3 of the Application for the Underground Storage Tank Installation Permit: <br />Owner/operator information is outdated. Please follow the link to access updated application, if <br />information is still not correct, please advise as to information that should be on there. <br />2) Complete manufacturer certifications were not submitted. Provide current contractor's training <br />certifications for installation and testing of all proposed UST equipment/components, including <br />tanks & sumps, flex connectors, piping, spill buckets, sump shields & lids, leak detectors, and <br />overfill prevention. A number of the attached certifications have expired and there is not a <br />certification for each part being installed. Please follow the link to access certifications received <br />from contractor, if certifications are still not the correct ones, please advise specifically which <br />ones are acceptable & which ones you are still missing. <br />3) Provide manufacturer's cut sheets for all proposed UST system components, including piping, <br />flex connectors, STP & fill sumps, UDCs, vent sumps, penetrations, spill buckets, and overfill <br />prevention. I found a link in one of the emails but it says that it is an "invalid link". Please follow <br />the link to access manufacturer's cut sheets, if it still says that the link is invalid (which I checked <br />& was able to access again without any problem) we can overnight hard copies or a usb drive <br />including all plans & documents to your office, if manufacturer's cut sheets are still not the <br />correct ones, please advise specifically which ones are acceptable & which ones you are still <br />missing. <br />4) Provide tank charts for the tanks being used. Sheets M5.3.04, M5.3.05, M5.3.06., & M5.6.03 are <br />different from the tank charts needed. Tank carts are a large table of values that list the dipstick <br />value associated with the gallons in the tank. /found tank charts in the papers for this install but <br />they are Xerxes tank charts and the plans state that Containment Solutions tanks will be <br />installed. Please follow the link to access updated plans, see sheets M.5.3.04, M.5.3.05, <br />M.5.3.06 <br />5) The section on vacuum zones on M.5.3.09 lists vapor recovery under 87 Zone 1 only. Please <br />include documentation for 91 vapor recovery piping. 91 on this page only shows vacuum zones <br />for product (zone 5), vent (zone 6) and crossover (zone 7). Please follow the link to access <br />updated plans, see revised sheet M.5.3.0 (Detail D) <br />6) Provide line length information for verifying line leak detector compatibility. I don't see the line <br />length information on G.0.2.0. Please follow the link to access updated plans, see revised sheet <br />M.5.3.0 (Detail D) <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.