My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hi Tahtia, <br /> The address on the testing notification shows 2459 E Mariposa Rd, but our inventory does not show any UST's at <br /> the address provided. <br /> Your request has not been logged. <br /> Thank you, <br /> Ge+%tSi,k Marti*Lea I Sr. Office Assistant <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Ave. Stockton, CA 95205 <br /> n (209)468-021718 (209)468-34331®gmartinez@sigov.org <br /> EHD Website: https://www.sagov.org/department/envhealth/ <br /> From:Tahtia Pearce<TPearce@cgrs.com> <br /> Sent: Friday, February 18,2022 3:45 PM <br /> To:Tahtia Pearce<TPearce@cgrs.com> <br /> Cc: EH-UST<ust@sigov.org>; Kelvin Cruz<kcruz@grinc.com>; Chris Murphy<CMurphv@cgrs.com> <br /> Subject:Test Notify for 2459 E. Mariposa Rd. -Stockton <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Hello everyone, <br /> Please find attached notification and general contractor's statement for final ELD testing at the subject site. If you have <br /> any questions or concerns, please feel free to reach out via email, phone or text. <br /> Installing contractors, please note: Final ELD testing requires that ALL tanks be empty of ballast(water)and must <br /> be mopped and dry prior to technician's arrival. <br /> Thank you. <br /> Tahtia Pearce . <br /> ELD Project Coordinator CGRS <br /> Mobile 916.616.2233 1 916.991.1100 SOLUTIONS DELIVERED <br /> CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are intended solely for the addressee(s)and <br /> may contain confidential and/or privileged information and may be legally protected from disclosure. If you are a client please consider <br /> its contents before forwarding to a third party. <br /> If you have received this message in error,please (1)do not open any attachments, (2)reply to the sender that you have received this <br /> message in error, and(3)delete this message. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.