My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tank Specific Information TANK NUMBER <br /> 1 2 3 4 5 <br /> 14.Underwriter Laboratories label or tank serial number. <br /> 15.Tank type.* <br /> (Indicate SW,DW,SW-OWS,or DW-OWS for each tank) <br /> 16.Interstitial Monitor type.** <br /> (Indicate HYDRO,DRY,VAC or PRES for each tank) <br /> 17.Tank capacity. Select one: ❑ Gallons ❑ Liters <br /> (Indicate unit of measurement and record the <br /> capacities for each tank) <br /> 18.Tank free of visual damage. <br /> (Document damage found and attach to this form) <br /> 19.Monitoring fluid visible on inner or outer tank wall. <br /> (Indicate Yes or No for each tank) <br /> 20.Pre-Installation air/soap test performed without leaks. <br /> Indicate which test in Section D you used per tank: <br /> 21.Hydrostatically monitored tanks: <br /> Indicate Yes or N/A for each step completed per tank: <br /> •Sensor sits on tank top <br /> •Check and record monitoring-fluid level in reservoir <br /> •Annular space vented <br /> 22.Vacuum monitored tanks: record vacuum date <br /> record vacuum level <br /> * SW=Single Wall Tank • DW=Double-Wall Tank • SW-OWS=SW Oil/Water Separator • DW-OWS=DW Oil/Water Separator <br /> **HYDRO=Hydrostatic • DRY=Dry interstice space with probe • VAC=Vacuum • PRES=Positive Air Pressure <br /> Measurement instructions are found in Section 11 of Tank Installation Instructions. <br /> 1)First Vertical Diameter Measurement(Section 11,Figure 11-1) <br /> 2)Second Vertical Diameter Measurement(Section 11,Figure 11-2) <br /> 3)Third Vertical Diameter Measurement(Section 11,Figure 11-6) <br /> Measurement A-Tank deflection with backfill at tank top <br /> (subtract Measurement 3 from Measurement 1 above) <br /> Refer to Table 11-1 for max.deflection values. <br /> 4)Fourth Vertical Diameter Measurement(Section 11,Figure 11-7) <br /> 5)Fifth Vertical Diameter Measurement(Section 11,Figure 11-8) <br /> 6)Calculate the final vertical diameter measurement <br /> (subtract Measurement 5 from Measurement 4 above) <br /> Measurement B-Tank deflection at subgrade <br /> (subtract Calculated Value(6)from Measurement 1 above) <br /> Refer to Table 11-1 for max.deflection values. <br /> TABLE 11-1 <br /> • Tank Diameter Maximum Deflection <br /> If Measurement A or Measurement B exceeds the values shown in Table 1-1, <br /> immediately contact Ta n k Tech n ica I Support prior to proceeding with the 6' 3/4" (19mm) <br /> installation. 8' 11/4 (31 mm) <br /> CSITankTechnical Support:(800)537-4730 10' 11/2" (38mm) <br /> 12' 13/4' (44mm) <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.