My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
INSTALL_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:30 PM
Creation date
11/9/2021 8:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2021
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO AM/PM - BP FUEL DISPENSING FACILITY
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
03
SITE_LOCATION
2510 S HWY 99
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA KJ O A Q U IN Environmental Health Department <br /> — COUNTY- <br /> 6. The UST system must be installed in compliance with all of the following : <br /> a. The installed UST system must be compliant with all applicable laws, regulations, and industry <br /> standards. All installation and testing shall be in compliance with manufacturer's instructions and <br /> CCR 2635 and 2636. All monitoring system components shall be listed in the State Water <br /> Resources Control Board's Local Guidance Letter (LG) 113. <br /> b. All primary containment including any integral secondary containment system must be certified by <br /> an independent testing organization and labeled as required by the organization (California Code <br /> of Regulations Title 23 Chapter 16 (CCR) 2631 (b); UL, ULC, ANSI , API , ASTM, etc. See CCR <br /> Table B for complete list.) . Pursuant to Underwriters Laboratories Inc. (UL) listing requirements, <br /> only those products bearing the UL mark will be considered listed . ANY PART/PRODUCT NOT <br /> MARKED WITH THE UL LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE <br /> REJECTED. All secondary containment system which is not an integral part of the primary <br /> containment shall be designed and constructed according to an engineering specification <br /> approved by a state registered professional engineer or according to a nationally recognized <br /> industry code or engineering standard , per CCR 2631 (d) . <br /> c. All metal components in direct contact with the ground, such as flexible connectors, swing joints, <br /> fittings, clamps, bands, and pumps, shall have adequate corrosion protection . <br /> d. Install concrete of sufficient thickness over USTs and around sumps and dispensers, according to <br /> the manufacturer's written installation instructions and buoyancy calculations. <br /> e. All tank top openings that are connected to the primary space of the UST must have secondary <br /> containment, audible/visual alarm, and be vapor tight or terminate at grade. <br /> f. Sumps, including UDCs, must be constructed in a manner to prevent vapors from entering the <br /> backfill. <br /> g. All secondary containment must be constructed to prevent water intrusion and must be <br /> continuously monitored as required under HSC 25290. 1 . <br /> h. Chase piping must be VPH monitored and included in its respective product piping vacuum <br /> monitoring zone. All vacuum zone volumes must be accurately programmed and their volumes <br /> adequate for their respective vacuum sensors. All sensors must be installed to detect a leak at <br /> the earliest opportunity. <br /> i. Overfill prevention shall satisfy CCR 2635(b)(2)(C), pursuant to the permit application . No ball <br /> floats shall be installed on vent lines to comply with overfill prevention requirements (Code of <br /> Federal Regulations, Title 40, section 280.20(c)) <br /> j. Hazardous material or waste cannot be released , intentionally or unintentionally, to the <br /> sewer/septic system , storm water system, or any other waters of the state. If a release occurs, it <br /> will be considered illegal hazardous waste disposal and will be subject to enforcement. <br /> k. No additional shut off valves should be installed between the monitored interstitial spaces <br /> and their respective sensors. <br /> PRIOR TO FIRST FUEL DELIVERY: <br /> 7. A valid California Department of Tax and Fee Administration (CDTFA) number must be obtained and <br /> provided to EHD prior to fuel drop. This number must be uploaded into the California Environmental <br /> Reporting System (CERS) at https://cers,calepa.ca.gov. <br /> 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.